Search Documents

Search Again

Search Again

Sort by

  • SME
    The Crescent Market Project

    By D. A. Meyer

    The long and arduous process of bringing aggregate produced in Mexico to the Gulf Coast of the United States really began in the 1970s when the first exploratory trips were taken by Vulcan's geol

    Jan 1, 1995

  • IMPC
    The Critical Role of Interfacial Chemistry in Bubble-Particle Capture

    By John Ralston

    "Interfacial chemistry plays a pivotal role in bubble-particle capture, for it controls whether or not attachment occurs. Surface heterogeneity, degree of surface hydrophobicity, bubble nucleation and

    Jan 1, 2003

  • NIOSH
    The Critical Ventilation Velocity In Tunnel Fires - A Computer Simulation

    By J. C. Edwards, C. C. Hwang

    In ventilated tunnel fires, smoke and hot combustion products may form a layer near the ceiling and flow in the direction opposite to the ventilation stream. The existence of this reverse stratified f

  • SME
    The Crossrail Experience

    By Bill Tucker, Mike Black

    "PROJECT OVERVIEW Crossrail, Europe’s largest construction project, will increase London’s transportation capacity by 10% when it opens in 2018. The Crossrail scheme is a combination of surface and un

    Jan 1, 2016

  • SME
    The Crushing & Grinding Of Gypsum ? Introduction

    By E. J. Hammer

    In the crushing and grinding of metallics for beneficiation, the sizing is normally done to liberate the metals or sulphides for further processing to improve recoveries of the basic metals or mineral

    Jan 1, 1969

  • AUSIMM
    The CSA ventilation upgrade – geotechnical challenges and learnings

    By T M. Brettell, D Sidea

    The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre

    Oct 16, 2017

  • SME
    The Current State of Disc Cutter Design and Development Directions

    By Joe Roby

    Rolling disc cutters are the business end of hard rock and mixed face tunnel boring machines (TBMs). Since their first successful employment on a TBM over fifty years ago, disc cutter technology has c

    Jan 1, 2008

  • SME
    The Dallas Area Rapid Transit Subway Tunnel Project

    By Dave Rogstad

    The DART NC-1B Tunnel Project consists of two 5,100 m TBM excavated tunnels, a principal underground station, a partially completed future station, a surface station, and eight associated ventilation

    Jan 1, 1995

  • SME
    The Dashaveyor A New Transportation Concept

    By Robert C. Bacon

    The first commercial installation of the Dashaveyor has recently been completed at the White Pine Mine in Northern Michigan. After four years of development work, including prototype testing, and pilo

    Jan 1, 1968

  • SME
    The DC WASA Anacostia River CSO Control Tunnel Project

    By David C. Girard, Larry Williamson, Leonard R. Benson, Ronald E. Bizzarri

    On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and floo

    Jan 1, 2007

  • AUSIMM
    The Deep Parts of the Kiirunavaara Apatite-Magnetite Orebody in Kiruna, Northern Sweden and the Impact of Future Mining on the Township of Kiruna

    The Kiirunavaara apatite-magnetite orebody is about 4 km long and approximately 100 m thick sheet-like body, which lies roughly in a north-south direction and dips from the horizontal plane along its

    Jan 1, 2006

  • SME
    The Delivery Of Underground Construction Projects In The UK: A Review Of Good Practice

    By Andy Alder

    The aim of this paper is to provide an overview and details of good practice, from a United Kingdom perspective, in the development and implementation of major tunnel and underground infrastructure pr

  • CIM
    The Dentonia Flotation Mill

    By W. Holdsworth

    The flotation mill of Dentonia Mines, Limited, at Greenwood, B.C., went into operation on April 20th, 1934, and by October 11th a total of 15,000 tons of ore had been treated. It is intended in this p

    Jan 1, 1935

  • AUSIMM
    The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project

    The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include

    Jan 1, 1981

  • SME
    The Design and Construction of Multiple Closely Spaced Tunnels in Soft Ground–A Case History of the Mac Storm Tunnel Project

    By Mohamed A. Younis, Robert J. F. Goodfellow

    This paper investigates the design approaches taken and the philosophy employed during the construction of the Metropolitan Airport Commission (MAC) storm tunnels, part of the Phase 4 Segment of the M

    Jan 1, 2003

  • SME
    The Design and Construction of the Excavation for the Underground Works at the Rocky Mountain Pumped Storage Project

    By C. M. Lundell, F. S. Kendorski, R. D. Prager

    The criteria for the design of the shaft/tunnel system excavation at the Rocky Mountain Project was to provide a stable opening during and after construction to receive the concrete lining and to mini

    Jan 1, 1986

  • SAIMM
    The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)

    By V. Mathebula

    Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv

    Jan 1, 2004

  • SME
    The Design and Manufacture of the Arrowhead Tunnels Project Precast Segmental Lining

    By Christopher Hebert, Michael R. King, Mehdi Ghazi

    The Inland Feeder project is a critical component of Southern California’s water delivery system, relying on a strategic plan of water transfer and storage to enable the delivery of an additional 650

    Jan 1, 2003

  • SME
    The Design and Use of Steel Fiber Reinforced Concrete Segments

    By Michael R. King

    The application and use of steel fibre reinforced concrete in precast tunnel lining design is a growing trend due to its advantages in performance over plain concrete, and ease of manufacture compared

    Jan 1, 2005

  • SME
    The Design Challenges of a Soft-Ground Twin-Bore Tunnel on a Connection Motorway in NW Italy

    By Shulin Xu, Moreno Pescara, Nicola Avagnina, Piergiorgio Grasso

    The Roreto Tunnel is a shallow, twin-bore, road tunnel on the connection between the A6 and the A21 motorway in NW Italy. The challenges faced the design and construction of this tunnel derive from 1)

    Jan 1, 2003