Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tunnel Design Using Strain Energy Concepts and Serviceability Limit State
By I. W. Farmer, R. E. Finky
Design of structures in rock based on ultimate limit states or strength criteria is unrealistic. The fracture process which inevitably occurs in rock around an underground structure is an energy relea
Jan 1, 1986
-
Tunnel Destruction:State Of The Art
By Charles E. Joachim
Current Army tunnel destruction criteria (1) are based on limited nuclear-explosive (NE) and high-explosive (HE) test data. The PILE DRIVER (2) and HARDHAT (3) events investigated tunnel and support s
Jan 1, 1979
-
Tunnel Driving At Copper Mountain, B. C.
By Oscar Lachmund
DURING the driving of the main haulage level at the Copper Mountain mines of the Canada Copper Corpn., Ltd., near Princeton, B. C., some very rapid driving was clone, though no claim for a world'
Jan 3, 1919
-
Tunnel education in the United States
By Gary Brieley
Until well into the 20th century, most construction work was performed under the auspices of a master builder or in a manner that would be described today as design-build. In addition, many civil eng
Jun 1, 2010
-
Tunnel Euralpin Lyon Turin CO8-Design of Temporary Support Profile of Base Tunnels and Cross-Passages - NAT2024
By Elisa Comis, Barbara Bitetti, Julien Pepiot, Stefano Lione, Francesc Rich
The new Lyon-Turin railway project involves the construction of a 57 km twin-tube tunnel between France and Italy. Pini France (project leader) and Systra-SWS are the designers of Construction Site 8
Jun 23, 2024
-
Tunnel Excavation At The Bad Creek Project
By Thomas H. Holley
This presentation will describe the underground excavation at the Bad Creek Pump Storage project. It consists of approximately 3,650 m of various size tunnels ranging from 4.2 m to 9.0 m finished diam
Jan 1, 1987
-
Tunnel Excavation Grand Coulee Third Power Plan
By D. J. Duck
INTRODUCTION Construction of the 3,600,000 kilowatt Third Powerplant at Grand Coulee Dam started in late summer 1967 approximately one year after authorization by Congress. The project was made pos
Jan 1, 1997
-
Tunnel Excavation In Alaska Using High Speed Equipment
By Mike S. Ness, Allan G. Provost
High speed drilling, mucking, and hauling equipment was used in driving approximately 2.16 km(7100 ft) of lower power tunnel in quartz diorite for the Tyee Lake Hydroelectric Project near Wrangell, Al
Jan 1, 1983
-
Tunnel Excavation on the Abutment of an Existing Dam
To meet the energy requirements, hydroelectric projects are planned and executed in many countries. Though these projects requires a high capital investment, the returns are regular with minimum maint
Jan 1, 2016
-
Tunnel Excavation Solution in Highly Tectonized Zones - Excavation through the Contact between Two Continental Plates
By Marini David, Pigorini Andrea, Fuoco Stefano, Zurlo Raffaele
"The excavation of a tunnel in highly weathered and strongly fractured rock masses due to tectonic actions is still a challenge. In order to maintain reasonable productivity, excavation through a wide
Jan 1, 2016
-
Tunnel Groundwater Inflow Measurement
By R Witt, M Lowing
Tanking of tunnels is now often specified when inflows exceed as little as 1 L/s/km with a unit distance of 100 m. To demonstrate inflows over a 100 m segment of a tunnel are less than 0.1 L/s with a
Jan 1, 2008
-
Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability Challenges
By Shawna Munn, Jakub Hudler
This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines
Jan 1, 2018
-
Tunnel Induced Settlement and Impact Analysis Automation and 3D Visualization - RETC2021
By Camilo Quintero, Frank Cesario, John Kinnear, Brian Boye
In this paper, an innovative approach was adopted to automatically calculate the effects of tunnel induced settlement on buildings and utilities. The approach resulted in increased output quality, con
Jun 13, 2021
-
Tunnel Information Modelling in Most Recent Form - Applying BIM technologies and procedures in tunnelling environment
By Jurij Karlovšek, Marko Žibert, Scott Keniston
"SUMMARY The importance of information management was recognised in surface construction industry decades ago, and has increasingly being recognised through formal process and laws. Around the world,
Jan 1, 2016
-
Tunnel Instrumentation: Why And How?
By Ernest Selig, John Dunnicliff, Delon Hampton
This paper provides a summary of a two-day conference held in New Orleans in March 1980, entitled "Tunnel Instrumentation: Benefits and Implementation." The conference addressed two major questions: F
Jan 1, 1981
-
Tunnel Interaction: Hydraulic, Mechanical, And Hydromechanical Approach
By John Kinneen, Sunghoon Choi, Arne Fareth, Edward S. Barboe, Kyle R. Ott
A new water treatment plant is to be constructed for a portion of the water supply system of New York City. The project includes construction of new water conveyance tunnels crossing perpendicular and
Jan 1, 2007
-
Tunnel Investigations in the Terrigal Formation of New South Wales
By Peck W
The tunnel alignments investigated for the Gosford Regional Sewerage Scheme are located in the Terrigal Formation and are covered for most of their length by a thick blanket of soil and weathered
Jan 1, 1976
-
Tunnel Lining Design in Active Fault Zone: Case Histories and Innovations - RETC 2021
By Peter Chou, Pooyan Asadollahi, Danny Lin
To maintain flexibility and ductility of tunnels crossing active faults, various mitigation measures are being utilized depending on fault offset movements and seismic design criteria. Examples of tho
Jun 13, 2021
-
Tunnel Lining for Drill and Blast Tunnels
By Björn Johansson
"SUMMARY Every tunnel designer has to consider the power of water ingress when designing a new tunnel. Either you choose solutions with simple methods to divert the ingress water or a robust system wi
Jan 1, 2016
-
Tunnel Lining Pressures During Groundwater Freezing And Thawing
By P. F. R. Altounyan, I. W. Farmer
Groundwater freezing was used to stabilise 8m thick beds of saturated and weakly cemented sands at a depth of 170m, during driving of twin 1 in 4,5.2m o.d. circular drifts from the surface to the Coal
Jan 1, 1981