Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Botswana: Africa's most transparent state
By Schwartz M.
Respect for mining in Botswana is long-standing. This article looks at Africa's most transparent mining regime and some of its ambitious plans. Botswana's mining industry value is forecast to average
Mar 1, 2015
-
Bottom Stability of Shafts with Cohesive Soil Plugs Overlying an Artesian Aquifer
By Steven W. Hunt, Safdar A. Gill
Design and construction of temporary shafts for underground facilities often require evaluation of bottom stability due to rupture (blow-ins) caused by water pressure acting on a bottom plug. This pa
Jan 1, 1997
-
Bradshaw Section 5A Interceptor, Sacramento, California
By Patrick Doig, Ross Webb
The Bradshaw Section 5A Interceptor involves the construction of two miles of 108-inch, finished diameter tunnel in dry soils. Excavation is generally by Lovat TBM with ribs and lagging support. The t
Jan 1, 1999
-
Bralorne Mill of Bralorne Mines, Limited
By Fred E. Gray
The mill of Bralorne Mines, Limited, is located on the government highway in the Bridge River mining district of British Columbia, approximately fifty miles northeast of Shalalth, the shipping point o
Jan 1, 1933
-
Brass-Furnace Practice In The United States. - Introduction.
By H. W. Gillett
This bulletin is issued by the Bureau of Mines as a contribution to the increase of safety and efficiency in the preparation and utilization of the mineral resources in the United States. Notable amon
Jan 1, 1916
-
Brave New World Autonomous Mining Systems
By M Lynch, B White
The historic city of Charters Towers in North Queensland is underlain by an extensive labyrinth of old mine workings in a large number of flat lying, subparallel, main and cross-cutting cross reefs ex
Sep 26, 2013
-
Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer Projects
By N Lewis
Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying
Mar 8, 2011
-
Breaking Conway’s Law: Getting the Benefits from Integrated Design Automation - NAT2022
By David Wright, Jerome Chamfray, Anthony Harding, Brian Boye
Conway’s Law states that unless we intentionally design automation tools around what we need, we will simply replicate our existing processes. While we may achieve some savings this way, there is an o
Dec 1, 2022
-
Breaking New Ground: Deflagrating Cartridges for Urban Tunneling at Grand Central
By Joseph A. Meyers, Michael D. Stokes
This paper will focus on the use of Deflagrating Cartridges for tunnel excavation in Midtown Manhattan at Grand Central and 42nd Street Station, where the excavation has challenges due to the proximit
Jan 21, 2025
-
Breaking The Barrier: Considering How Iot Can Help Brazilian Tailings Dams
By Hiago Antunes Amador de Oliveira, William Pratt Rogers, Aaron Young
Monitoring systems are highly critical components in the safety of tailings storage facilities (TSF). Internet of things (IoT) platforms present a unique way to improve TSF monitoring systems. Since t
Oct 3, 2019
-
Breaking Through: Shaft Design and Construction Considerations from Miami’s Norris Cut Project
By Richard Giffen, Boris CARO VARGAS, Terrence Carroll
"This paper takes an in-depth look at the $72 million design-build Norris Cut project, which includes the replacement of an existing 54-inch waste water sewer main to Fisher Island under the Norris Cu
Jan 1, 2016
-
Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New Zealand
By Charlie Watts, Ken Smales, Ron Fleming
The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace
Jan 1, 2007
-
Bridgeport Paper - The Nickel Mine at Lancaster Gap. Pennsylvania, and the Pyrrhotite Deposits at Anthony's Nose, on the Hudson (see Discussion, p. 883)
By J. F. Kemp
The use of nickel-steel has directed increasing interest of late towards the deposits of nickel, and at the same time the parallel advance in our knowledge of the basic igneous rocks has rendered thes
Jan 1, 1895
-
Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022
By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis
Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin
Dec 1, 2022
-
Brightwater Conveyance System Will Expand Seattle?s Wastewater Treatment
By John E. Newby
Washington?s King County is constructing a new regional wastewater treatment facility, called Brightwater, in response to growth in the greater Seattle region. Planning conducted in the late 1950s ide
Jan 1, 2007
-
Brightwater Conveyance System: Ground Freezing For Access Shaft Excavation Through Soft Ground
By Joseph M. McCann
The Brightwater regional wastewater treatment facility, under construction in King County, WA, includes an extensive conveyance system that will feature deep, soft-ground tunnels and shafts. Excavatio
-
Brightwater East?A Case History
By Luminita Calin
King County (Seattle, WA) is on a monumental task of building the new Brightwater System complete with a new treatment plant, three main conveyance tunnels, a new outfall into Puget Sound and other an
-
Brightwater?s Ballinger Way Portal Presents Deep Shaft Ground Freezing Challenges
By James D. Nickerson
Thee Brightwater water treatment facilities, currently scheduled to be completed in 2010 and begin operating in 2011, will serve the northern part of King County, WA. The facility includes a new trea
Jan 1, 2009
-
Bringing The Entrepreneurial Mindset Into Mining Engineering Education
By Rudrajit Mitra, Erik Hulthen, AARTI SORENSEN, TOBIAS HARTMANN, ELISABETH CLAUSEN
There has been an ongoing debate on how to transform engineering education to better prepare students for today’s professional world that is characterized by increasingly complex problems and challeng
Sep 1, 2022
-
Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record
By A Reschke
The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin
Mar 8, 2011