Search Documents

Search Again

Search Again

Sort by

  • IOM3
    Botswana: Africa's most transparent state

    By Schwartz M.

    Respect for mining in Botswana is long-standing. This article looks at Africa's most transparent mining regime and some of its ambitious plans. Botswana's mining industry value is forecast to average

    Mar 1, 2015

  • SME
    Bottom Stability of Shafts with Cohesive Soil Plugs Overlying an Artesian Aquifer

    By Steven W. Hunt, Safdar A. Gill

    Design and construction of temporary shafts for underground facilities often require evaluation of bottom stability due to rupture (blow-ins) caused by water pressure acting on a bottom plug. This pa

    Jan 1, 1997

  • SME
    Bradshaw Section 5A Interceptor, Sacramento, California

    By Patrick Doig, Ross Webb

    The Bradshaw Section 5A Interceptor involves the construction of two miles of 108-inch, finished diameter tunnel in dry soils. Excavation is generally by Lovat TBM with ribs and lagging support. The t

    Jan 1, 1999

  • CIM
    Bralorne Mill of Bralorne Mines, Limited

    By Fred E. Gray

    The mill of Bralorne Mines, Limited, is located on the government highway in the Bridge River mining district of British Columbia, approximately fifty miles northeast of Shalalth, the shipping point o

    Jan 1, 1933

  • NIOSH
    Brass-Furnace Practice In The United States. - Introduction.

    By H. W. Gillett

    This bulletin is issued by the Bureau of Mines as a contribution to the increase of safety and efficiency in the preparation and utilization of the mineral resources in the United States. Notable amon

    Jan 1, 1916

  • AUSIMM
    Brave New World Autonomous Mining Systems

    By M Lynch, B White

    The historic city of Charters Towers in North Queensland is underlain by an extensive labyrinth of old mine workings in a large number of flat lying, subparallel, main and cross-cutting cross reefs ex

    Sep 26, 2013

  • AUSIMM
    Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer Projects

    By N Lewis

    Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying

    Mar 8, 2011

  • SME
    Breaking Conway’s Law: Getting the Benefits from Integrated Design Automation - NAT2022

    By David Wright, Jerome Chamfray, Anthony Harding, Brian Boye

    Conway’s Law states that unless we intentionally design automation tools around what we need, we will simply replicate our existing processes. While we may achieve some savings this way, there is an o

    Dec 1, 2022

  • ISEE
    Breaking New Ground: Deflagrating Cartridges for Urban Tunneling at Grand Central

    By Joseph A. Meyers, Michael D. Stokes

    This paper will focus on the use of Deflagrating Cartridges for tunnel excavation in Midtown Manhattan at Grand Central and 42nd Street Station, where the excavation has challenges due to the proximit

    Jan 21, 2025

  • ABM
    Breaking The Barrier: Considering How Iot Can Help Brazilian Tailings Dams

    By Hiago Antunes Amador de Oliveira, William Pratt Rogers, Aaron Young

    Monitoring systems are highly critical components in the safety of tailings storage facilities (TSF). Internet of things (IoT) platforms present a unique way to improve TSF monitoring systems. Since t

    Oct 3, 2019

  • SME
    Breaking Through: Shaft Design and Construction Considerations from Miami’s Norris Cut Project

    By Richard Giffen, Boris CARO VARGAS, Terrence Carroll

    "This paper takes an in-depth look at the $72 million design-build Norris Cut project, which includes the replacement of an existing 54-inch waste water sewer main to Fisher Island under the Norris Cu

    Jan 1, 2016

  • SME
    Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New Zealand

    By Charlie Watts, Ken Smales, Ron Fleming

    The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace

    Jan 1, 2007

  • AIME
    Bridgeport Paper - The Nickel Mine at Lancaster Gap. Pennsylvania, and the Pyrrhotite Deposits at Anthony's Nose, on the Hudson (see Discussion, p. 883)

    By J. F. Kemp

    The use of nickel-steel has directed increasing interest of late towards the deposits of nickel, and at the same time the parallel advance in our knowledge of the basic igneous rocks has rendered thes

    Jan 1, 1895

  • SME
    Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022

    By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis

    Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin

    Dec 1, 2022

  • SME
    Brightwater Conveyance System Will Expand Seattle?s Wastewater Treatment

    By John E. Newby

    Washington?s King County is constructing a new regional wastewater treatment facility, called Brightwater, in response to growth in the greater Seattle region. Planning conducted in the late 1950s ide

    Jan 1, 2007

  • SME
    Brightwater Conveyance System: Ground Freezing For Access Shaft Excavation Through Soft Ground

    By Joseph M. McCann

    The Brightwater regional wastewater treatment facility, under construction in King County, WA, includes an extensive conveyance system that will feature deep, soft-ground tunnels and shafts. Excavatio

  • SME
    Brightwater East?A Case History

    By Luminita Calin

    King County (Seattle, WA) is on a monumental task of building the new Brightwater System complete with a new treatment plant, three main conveyance tunnels, a new outfall into Puget Sound and other an

  • SME
    Brightwater?s Ballinger Way Portal Presents Deep Shaft Ground Freezing Challenges

    By James D. Nickerson

    Thee Brightwater water treatment facilities, currently scheduled to be completed in 2010 and begin operating in 2011, will serve the northern part of King County, WA. The facility includes a new trea

    Jan 1, 2009

  • SME
    Bringing The Entrepreneurial Mindset Into Mining Engineering Education

    By Rudrajit Mitra, Erik Hulthen, AARTI SORENSEN, TOBIAS HARTMANN, ELISABETH CLAUSEN

    There has been an ongoing debate on how to transform engineering education to better prepare students for today’s professional world that is characterized by increasingly complex problems and challeng

    Sep 1, 2022

  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011