Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Case History of a Mixed Ground Microtunnel
By D. Craig Camp
conditions. The soils included 65 m of rock not exceeding an unconfined compressive strength (UCS) of 200 kgf/cm2, 130 meters of soft clay, silt, and sand not exceeding 30standard penetration test SPT
Jan 1, 2001
-
Case History of the New St. Clair River Tunnel
By J. F. McDonald
On December 8th of last year, the new St. Clair River tunnel was holed-through to Port Huron, Michigan. The tunnel, commissioned by the Canadian National Railway, was needed to replace an existing tun
Jan 1, 1995
-
Case History of the Orme Street Combined Trunk Relief Sewer Phase III
By Kenneth Denton, Michael Cutts, Andrew Bursey, Eric Eisold
Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7locations along a 970 m alignment in do
Jan 1, 2003
-
Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations
By Marlion T. McQuinn
This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys
Jan 1, 2006
-
Case History Of The Wachovia?Knight Theater Pedestrian Tunnels
By Eric Eisold
The Wachovia Headquarters and Arts and Cultural Campus project in Charlotte, NC includes a 1.5 million square foot, 48-story office tower, two museums, an Afro-American cultural center and a 1,200 sea
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California
By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis
By Robert Jakiel
The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange
Jan 1, 2000
-
Case Studies Demonstrating Electronic Initiation Versatility
By Pierre-Louis Migairou
After a period of development and experimentation ranging over 20 years, electronic detonators have now come to maturity and are becoming the first choice in many diverse applications like tunnelling,
Jan 1, 2009
-
Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in Canada
By Scott King, Norm Patterson, Ruilin Yang
The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w
Jan 1, 2018
-
Case Study - Pumpable Emulsion Trials in Tunneling and Stoping
By Eduardo Berger
This paper describes a mechanized loading system, the HYDRODOSE, which allows the use of pumpable emulsions in underground mining. It also describes a pumpable emulsion explosive for small diameter ho
Jan 1, 1991
-
Case Study - Ventilation Duct Criteria Pros and Cons How to Effectively Lower Operating Costs during the Tender Process
By J. Holtzhausen
"An analysis of operating costs for underground mining operations in the current global economic climate considers the financial burden for a ventilation system to be in vicinity of 30–50%. These oper
Jan 1, 2019
-
Case Study in Rock Mass Behavior: TBM versus Drill and Blast
By Scott Chesman
Increased TBM performance is leading the way for resurgence in tunneling activity in NYC. Tunnels will be excavated in the same geologic formations as previously excavated D&B tunnels whose constructi
Jan 1, 2005
-
Case Study of EPB-TBM Crossing through Boulder Cluster and Method Selected for Claim Resolution - RETC2021
By Ehsan Nasiri, Keivan Pak Iman
Historically, boulders are a frequent source of problem in soft ground tunneling. It is important to attempt to make an assessment of the nature and quantity of the boulders, although in many cases, i
Jun 13, 2021
-
Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021
By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz
Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met
Jun 13, 2021
-
Case Study – Blind Shaft Sinking for BHP Jansen Project
By Patrick Rennkamp, Wolf-Dieter Trodel, Andy Fearn
"The Jansen shafts are completed using purely mechanical excavation. This paper summarises the geology, a description of the shafts, the method used for excavation and the results achieved along with
Jan 1, 2019
-
Case Study – UG Stope Optimization at Agnico Eagle’s Kittilä Mine
By K. Huttu, A. van Wageningen
"The Kittila underground mine is extracting one of the largest known gold deposits in Europe and has an estimated mine life through 2034. The Kittila mine is located in the Lapland region of northern
Jan 1, 2015
-
Case Study: Iterative Design Process of Presplitting in an Underground Overhand Cut and Fill Mine
By David Porter, Nathan Rouse
The implementation of presplit blasting has been widely utilized in open pit and underground tunneling. This case study works through the iterative process of developing a heading drill and blast desi
Feb 6, 2023
-
Cased Auger Piles (CAP): An Effective Piling Solution
By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)
By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical Solutions
By John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen
Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t
Jan 1, 2019