    Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower Projects

    By A G. Noble

    Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of

    Mar 8, 2011

  • SME
    Considerations for a District-Level, Tunnel-Risk, Screening Tool

    By Ehsan Moradabadi, Debra F. Laefer

    "To more rigorously address tunneling risks to above-ground structures, vulnerability evaluation of all structures along a tunnel route is required. This multi-block area along the route can be consid

    Jan 1, 2016

  • SME
    Considerations for Baselining Groundwater Conditions for Tunneling Projects

    By Steven W. Hunt, Isabelle Lamb, Steven B. Fradkin

    Groundwater control is generally an important consideration and significant source of risk during most tunneling projects. Proper baselining of groundwater conditions requires: 1) a thorough understan

    Jan 1, 2005

  • SME
    Considerations for Conveyor Belts in Tunneling Applications - NAT2022

    By Ginger L. Hustrulid

    Conveyor belts are a critical component in tunneling projects. This paper reviews current design considerations for conveyor belts. Rubber compounding differences to meet local fire resistance regulat

    Dec 1, 2022

  • AUSIMM
    Considerations for Design of Production Level Drawpoint Layouts for a Deep Block Cave

    By P Bartlett, K Naidoo

    Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively

    Jan 1, 2000

  • AUSIMM
    Considerations for Mechanised Excavation of Rock Tunners

    This paper discusses considerations to be made for the selection of rock tunnelling machines, as opposed to drilling and blasting. A systematic approach is presented in terms of utilizing data frc

    Jan 1, 1987

  • AUSIMM
    Considerations for the design and support of underground portals

    By M P. Sandy, R M. Stephenson

    Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu

    Mar 15, 2021

  • ISEE
    Considerations for the Excavation of Subsurface Facilities by Drill and Blast Methods, Yucca Mountain Project

    By Roger Keller, Jason Ryan

    A number of studies have evaluated excavation methods for the construction of subsurface facilities for a potential deep geologic repository for the disposal of nuclear waste at Yucca Mountain, NV. Ma

    Jan 1, 2001

  • SME
    Considerations On The Selection Of A System Of Long Distance Transport By Conveyor Belt ? Introduction

    By J. M. Rios

    This paper exposes the reasons that led the Empresa Nacional Minera del Sahara, S.A. (ENMINSA) to the selection of a conveyor belt system for the transport of phosphate rock over a distance of 100 kil

    Jan 1, 1968

  • ISEE
    Constructing a Decline Truck Entrance Tunnel Into Rock Reserves Located Beneath a College Campus

    By David R. Holberg

    In the Kansas City metropolitan area, mineable Bethany Falls Limestone occurs 80 ft below river level under the 700 acre Park College Campus on the north bank of the Missouri River at Parkville. For 2

    Jan 1, 1997

  • ISEE
    Constructing Laboratory Caverns in Hard Rock Under High Stress

    By Christopher Laughton

    A new underground laboratory is under construction at the recently closed Homestake Gold Mine, Lead South Dakota, United States of America. The Deep Underground Science and Engineering Laboratory is d

    Jan 1, 2011

  • SME
    Constructing the Airside Road Tunnel, Heathrow Airport

    By John Corcoran

    INTRODUCTION Content of this Report The 1300m long twin-bore 8.1m diameter Airside Road Tunnels (ART) were excavated beneath the busy taxiways and stands of Heathrow Airport between 2002and 20

    Jan 1, 2005

  • SME
    Construction And Geological Engineering Of An Underground Ore Bin

    By J. F. T. Agapito, G. P. Bratton

    A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos

    Jan 1, 1985

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • SME
    Construction And Performance Of A Mixed Face Tunnel Excavation

    By William R. Beloff, Franklin M. Grynkewicz, Puza

    Construction of the MBTA Red Line Extension through Somerville, MA, called for driving twin tube tunnels through a zone of approximately 83m (273 ft) with mixed face conditions. While the majority of

    Jan 1, 1981

  • SME
    Construction Challenges of the Anderson Dam Tunnel Project - NAT2022

    By Ron Drake

    The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An

    Dec 1, 2022

  • SME
    Construction Control Instrumentation Used During Tunnel Enlargement

    By Raymond P. Miller, David L. Monson, Robert A. Robinson

    A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p

    Jan 1, 1976

  • DFI
    Construction Dewatering Challenges in Urban Environments

    By Rafael A. Rivera

    "Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re

    Jan 1, 2017

  • SME
    Construction Difficulty Index For Tunnel Construction

    By Sigmund J. Sulinski

    The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All

    Jan 1, 1997

  • SME
    Construction Management And Team Effort Soft Ground Tunnel Project, Alexandria, Egypt

    By Chaitanya "Teny" Mittal

    INTRODUCTION A team effort by the Owner, Engineer, and Contractor can help avoid serious problems on a construction project. It can save cost and time for both Owner and Contractor, as illustrated

    Jan 1, 1989