Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction of Tunnel and Shaft Plugs
By James W. Marold
Tunnel and shaft plugs have been designed to assist in construction of new and rehabilitation of existing tunnels and shafts. Tunnel plugs have been used to provide construction access for side by sid
Jan 1, 2008
-
Design And Construction Of Tunnel Built By Shield Of Rectangular Cross Section
By Hidehiko Nakazaki, Sakuro Murayama, Mitsuo Miura, Masaaki Endo, Yoshiaki Hurukawa
This is a detailed report of construction experience of a tunnel built by a shield of rectangular cross section with reinforced concrete segments. In case of tunneling by a rectangular shield, there w
Jan 1, 1979
-
Design and construction of tunnel portals under difficult geotechnical conditions
By R. M. Spang
Abstract Between the German city of Dresden and the Czech capital Prague a 4-lane highway is under con-struction. At the outskirts of Dresden it will cross the narrow and deeply eroded Weißeritz V
Jan 1, 2003
-
Design and Construction of Tunnels for Northern Gateway Project, New Zealand
By M Behrens, A McPhee, B D. Hegan
This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is
Jan 1, 2008
-
Design and Construction of Tunnels in Swelling Rock
By H. H. Einstein
Swelling ground is one of the most feared problems in tunneling. Although usually not causing sudden failures during construction, the very large and longlasting deformations give contractors and desi
Jan 1, 1984
-
Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean
By Ihab Allam PE, Meeok Kim. PE. Ph. D
The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa
-
Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method
By Paul H. Madsen, Victor S. Romero
The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo
Jan 1, 2001
-
Design and Construction Procurement for the Amtrak Hudson Tunnel Project
By Phil Rice, Mohammed Nasim, Richard Flanagan
"The Gateway Trans-Hudson Partnership (GTHP), a joint venture of WSP USA, Inc., AECOM USA, Inc, and STV Incorporated, is providing preliminary engineering services to Amtrak for the Hudson Tunnel proj
Sep 1, 2019
-
Design And Construction Service Tunnels On Palm Jumeirah Island
By Ben Hayes, Michael Ryjevski
The Palm Jumeirah is the smallest of the three Palm Islands (Palm Jumeirah, Palm Jebel Ali and Palm Deira). It is located on the Jumeirah coastal area of the emirate of Dubai, in the United Arab Emira
Jan 1, 2007
-
Design And Development Of A Mobile Mining Machine
By G. L. Dollinger, J. P. Kindsvater, J. A. Gibson
DESIGN AND DEVELOPMENT OF A MOBILE MINING MACHINE INTRODUCTION Until recently, developing tunnels in hard rock has been accomplished either by the drill and blast method or by using large tunnel bo
Jan 1, 1985
-
Design and Engineering during the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)
By Jaime Adasme, Héctor González, Benjamín Celada
"INTRODUCTION Santiago de Chile is a 7 million inhabitant city which has a 103 Km long subway network operated since 1975 by Metro S.A. This network is used on a daily basis by 2.3 million people. In
Jan 1, 2016
-
Design and Geotechnical Aspects of Microtunnel Crossings Below Active Rail Alignments
By Andy J. Robinson, Mark D. Claassen
Railroad companies and transit authorities have been slow to acknowledge that for many—utility crossings, a direct pipe installation below live rail can be just as effective as a more intrusive tradit
Jan 1, 2003
-
Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, Brisbane
By Baxter D. A
This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r
Jan 1, 1993
-
Design and Implementation of the In-the-Wall Ramp at Marvel Loch South Pit
By K Williams
Marvel Loch South Pit has had a number of stages of open and underground mining activities before acquisition by Sons of Gwalia. The historical pit had achieved a completed pit depth of 150 metres and
Jan 1, 2003
-
Design And Installation Of Large Diameter Sub-Sea Connecting Shafts For The Seabrook Station Cooling Water System
By Jean-Pierre Nossereau, Allen J. Hulshizer
The main thrust of this paper covers the design, installation techniques and experience associated with the installation of eleven 1.5 m (4'-11") and three 2.87 m (9'-5") diameter shafts in
Jan 1, 1981
-
Design And Operation Of A Novel Gas Cooler For Refimet Copper Smelter, La Negra, Chile
By Tim J. A. Smith
Fundicion Refimet S.A. has operated a custom copper smelter at La Negra, near Antofagasta in northern Chile since 1993. From an initial operation based on Reverb smelting and Peirce-Smith, converting,
Jan 1, 1998
-
Design And Performance Evaluation Of A Grouting Program In Weak Rock Masses
By George Moses K, Mahendran K
Grouting is performed in rock masses in order to increase its strength properties and also to reduce the seepage. In the design of underground structures such as tunnels or caverns located in weak roc
Nov 1, 2022
-
Design and Planning of New Passageway Tunnel for Circulation Improvements at Grand Central— 42nd Street Station, New York City - RETC2023
By Alfredo Valdivia, Dominic Reda, Vojtech Gall
The design and planning for the construction of a new passageway to improve access and circulation to better accommodate anticipated increased passenger flow within Grand Central—42nd Street Station.
Jun 13, 2023
-
Design and preliminary testing of a low-energy planetary excavator - SME Transactions 2010
By L. Gertsch, R. Gustafson, J. Rostami, C. Swope
Development of a permanent human base on the moon for exploration requires a self-sustaining system. Such a system entails the production and processing of limited amounts of raw material on the moon.
Jan 1, 2010
-
Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels
By Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister
The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe
Jan 1, 2005