Search Documents

Search Again

Search Again

Sort by

  • SME
    Design Development of the I-35 Capital Express Central Drainage Tunnels - NAT2024

    By Joseph Goessling, Mark Kroncke, James Parkes

    The I-35 Capital Expressway (CapEx) Central Drainage Tunnels will serve as a stormwater collection system for the forthcoming I-35 Capital Express Central reconstruction project through downtown Austi

    Jun 23, 2024

  • SME
    Design Diagrams for Estimating Tunnel Face Stand-Up Time in Water-Bearing Ground

    By R. Schuerch, G. Anagnostou, R. Poggiati

    "The paper presents dimensionless design diagrams for estimating the stand-up time of a tunnel face in saturated ground of medium-low permeability. The diagrams cover a wide range of ground parameters

    Jan 1, 2016

  • SME
    Design Engineering And Technical Assistance On Construction And Operation Of The Sang Dong Chemical Plant In The Republic Of Korea

    By C. H. Lee

    The world-famous Sang Dong Mine in the Republic of Korea has long been one of the world's greatest tungsten ore deposits. Over the years, the development of the Sang Dong deposit has steadily inc

    Jan 1, 1962

  • SME
    Design Evaluations for the San Vicente Pipeline Tunnel

    By Zach Ahinga, Mike McRae, Dave Hopkins, Steve Klein

    The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variab

    Jan 1, 2005

  • SME
    Design for the Bolted and Gasketed Segment Lining for the Bypass Tunnel with High Head Conditions

    By Paolo M. Brion, Z. Bade Sozer

    "The Bypass Tunnel has high head conditions ranging from a minimum of 600 feet (183 m) under the Hudson River to a maximum of 875 feet (267 m) on the west side. The ground cover ranges from 425 feet t

    Jan 1, 2016

  • SME
    Design for the Cross City Tunnel, Sydney

    By Harry R. Asche, Manfred K. Lechner

    The Cross City Tunnel comprises 2km of a new underground traffic route in Sydney, Australia. The route is very complex, involving some six separate tunnels and three underground Y-junctions. For al

    Jan 1, 2003

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011

  • SME
    Design for Tunnelling on the Northside Storage Tunnel Project

    The Northside Storage Tunnel Project in Sydney includes over 20 km of TBM driven tunnels, over three km of declines and major caverns and pump rooms. The paper describes methods used for design on the

    Jan 1, 1999

  • SME
    Design Guidelines For Improved Water Spray Systems (PRIPRINT 83-107)

    By Sandip K. Mukherjee

    In underground mining operations, ventilation and water sprays are the common methods of controlling dust. In recent years there has been a proliferation of technical literature dealing with water spr

    Jan 1, 1983

  • CIM
    Design Guidelines for Permanent Tunnel Plugs

    By Brennan Lang

    Why Seal Tunnels? ?Restore groundwater levels to pre-mining conditions. ?Saturate rock mass to reduce acid rock drainage. ?Reduce discharge flow to the environment. ?Reduce or regulate flows to a

    May 1, 2002

  • AUSIMM
    Design Investigations for a Steel Lined Pressure Tunnel in the King River Power Development, Tasmania

    The King River Power Development on the West Coast of Tasmania has involved the storage of the waters of the King River in the new Lake Burbury and their diversion through a 7 km tunnel to a 144 MW po

    Jan 1, 1993

  • CIM
    Design Methodology for Large Underground Powerplants

    By R. Plassart, F. Laigle

    "As a powerhouse, a transformer or a valve chamber, large underground caverns are a major element of hydropower plant. On the contrary to galleries and shafts which are linear and long underground str

    Jan 1, 2015

  • SME
    Design Methodology Used for the Lake Mathews Outlet Facilities Project

    By S. Dubnewych, S. Kieffer, M. T. McRae, R. R. Redd

    The seismic vulnerability of the existing outlet tower at Lake Mathews reservoir, located in Riverside County, California, necessitated the design of a new outlet facility to assure serviceability of

    Jan 1, 1999

  • IOM3
    Design methods for controlled blasting

    By O. Dojcar

    Equations for calculating the parameters of controlled blasting (burden and spacing of boreholes and weight of the bottom charge) are derived and analysed on the basis of empirical values and made mor

    Dec 1, 1996

  • SME
    Design of a Laboratory Scale Wind Tunnel for Studying of Mine Fires

    By K. D. Luxbacher, J. T. Davis

    "A wind tunnel was designed to examine air flow, heat transfer and layering near an active fire at a working face. This tunnel simulates an active entry in an underground coal mine including an attach

    Jan 1, 2017

  • SME
    Design of a Large Diameter Gallery for a Nuclear Waste Storage Project - Application to the French Repository Project (CIGEO)

    By François Martin, Roland Plassart, François Laigle

    "MOTIVATION The storage of nuclear waste gives rise to a lot of innovative issues for underground space technologies. The nuclear activity of waste generates temperature effects on both the lining and

    Jan 1, 2016

  • SME
    Design of a NATM Tunnel for Mission Valley Light Rail—East Extension

    By David Field, David Powell, Richard Hulsen

    The Mission Valley Light Rail will loop through San Diego State University (SDSU)and to minimize the impact of construction most of the works will be underground. The project will require construction

    Jan 1, 2001

  • DFI
    Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.

    By Lucie Spencer, Craig Butterworth

    "This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot

    Jan 1, 1900

  • AUSIMM
    Design of a Steel Fibre Reinforced Concrete Segmental Tunnel Lining - City West Cable Tunnel Project, Sydney, Australia

    By A Kuras

    Segmental tunnel linings are becoming more common in Australia. One current project employing a segmental lining is the City West Cable Tunnel (CWCT) in Sydney. The project has been commissioned by En

    Jan 1, 2008

  • SME
    Design Of An Underground Repository In The Unsaturated Zone

    By R. F. Harig

    Designing an underground nuclear waste repository is a complex process. Although many decisions are involved before the design is complete, the first three--what the target horizon is, what the underg

    Jan 1, 1991