    Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022

    By Irwan Halim, Seung Han Kim

    This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c

    Dec 1, 2022

  • SME
    Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,

    Jun 13, 2021

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    Design of Segmental Lining for Waterview Project, Auckland, New?Zealand

    By S Pradhan, A Kuras, R Mahajan

    This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan

    Sep 17, 2014

  • SME
    Design of Shallow Tunnels for Washington Dulles International Airport People Mover

    By Frank P. Frandina, Diane R. Hirsch, David P. Field, Colin R. Weeks

    To accommodate growth in air service and to follow the Master Plan for long-term airport development, the Metropolitan Washington Airports Authority established thed2 Development Program at Washington

    Jan 1, 2005

  • AUSIMM
    Design of Steel Fibre Reinforced Segmental Lining for the Gold Coast Desalination Tunnels

    By M Chappell

    This paper describes the design of the steel fibre reinforced precast concrete (SFRC) segmental lining for the intake and discharge tunnels for the Gold Coast desalination plant in Queensland. In addi

    Jan 1, 2008

  • SME
    Design Of Stillwater Mining Company's East Boulder Mine

    By B. Strickland

    The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished

    Jan 1, 1999

  • AIME
    Design Of Surface And Near-Surface Construction In Rock

    By A. J. Hendron, D. U. Deere, F. D. Patton, E. J. Cording

    In the design of structures founded in the near-surface rock, a distinction may be made between those problems that are related to the strength of the rock mass, and those that are related primarily t

    Jan 1, 1967

  • SME
    Design of the Akron Northside Interceptor CSO Tunnel - RETC2023

    By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote

    The City of Akron will construct the Northside Interceptor Tunnel project, a U.S. EPA/ DOJ CSO Long Term Control Plan Project. The system will provide at least 10.3 million gallons of storage in a 16.

    Jun 13, 2023

  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • SME
    Design of the Brightwater Conveyance Tunnels

    By Leon Maday, Dan L. Pecha, Jeremy Johnson, Daniel N. Adams

    The Brightwater conveyance system includes 26 km of tunnels, a 130 mgd pump station, 2 km of micro tunnels, and a 2.4 km outfall. The tunnels extend from Woodinville to Puget Sound through varying soi

    Jan 1, 2005

  • SME
    Design of the Epping to Chatswood Rail Line, Sydney, Australia

    By Jim Rozek, Robert A. Gee

    The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc

    Jan 1, 2005

  • SME
    Design Of The Geologic Program At The Zortman And Landusky Mines, Little Rocky Mountains, Montana

    By M. Stephen Enders

    The Little Rocky Mountains host epithermal gold-silver bearing vein and stockwork deposits in a syenite intrusive complex. Pegasus Gold Ltd. is currently mining the oxidized deposits by open-pit metho

    Jan 1, 1983

  • AUSIMM
    Design of the Melbourne City Link Tunnels

    By S Porter, R Woodall, N Weeks

    Nelsen, Porter and Wilson (1996) provided some preliminary concepts for the design of the Melbourne City Link tunnels. At that time, the City Link project was in the early design phase whereas now it

    Jan 1, 1999

  • SME
    Design of the Metrowest Pressure Tunnel

    By J. N. Eskilsson, W. P. Chen, J. L. Kaplin, V. S. Romero

    The Massachusetts Water Resources Authority is currently improving its primary water supply system for the Boston Metropolitan area. The improvements planned by the Authority, which provides water fo

    Jan 1, 1997

  • AIME
    Design of the Primary Crushing Plant

    By L. R. MacLead

    Delivery of tailing to any part of the area by gravity from the ridge was found practicable. Experiments with asbestos-cement pipe proved it possible to use level pipe across the dams if it is fed thr

    Jan 1, 1942

  • SME
    Design of the Proposed Speer/Sixth/Lincoln Tunnel - Denver, Colorado

    By Henrie Henson, Dan Burroughs, Shyi-Shyong Jiang

    Jan 1, 1993

  • SME
    Design Of The Sacaton Concentrator - Design Considerations

    By Dennis K. Mortensen

    The warm southwestern desert of Arizona is an ideal location for ASARCO's new Sacaton Unit. The climate of this arid region played a major role in the design considerations of the Unit's cru

    Jan 1, 1974

  • SME
    Design of the Underground Structures of the Railway Link between the Town of Thumrait and the Port of Salalah: Segment 4c of the “Oman National Railway Project”

    By Pedone Ezio Michele, Mohamed Dahir Holad

    "The 4c segment is a part of the ""Oman National Railway Project” linking the mining area in the surroundings of Thumrait and the port of Salalah. It is 90 km long and the last 40 km stretch crosses a

    Jan 1, 2016

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams