Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022
By Irwan Halim, Seung Han Kim
This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c
Dec 1, 2022
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021
By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
Design of raise caving operations in LKAB mines
By T Ladinig
Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st
Mar 29, 2023
-
Design of Segmental Lining for Waterview Project, Auckland, New?Zealand
By S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
Design of Shallow Tunnels for Washington Dulles International Airport People Mover
By Frank P. Frandina, Diane R. Hirsch, David P. Field, Colin R. Weeks
To accommodate growth in air service and to follow the Master Plan for long-term airport development, the Metropolitan Washington Airports Authority established thed2 Development Program at Washington
Jan 1, 2005
-
Design of Steel Fibre Reinforced Segmental Lining for the Gold Coast Desalination Tunnels
By M Chappell
This paper describes the design of the steel fibre reinforced precast concrete (SFRC) segmental lining for the intake and discharge tunnels for the Gold Coast desalination plant in Queensland. In addi
Jan 1, 2008
-
Design Of Stillwater Mining Company's East Boulder Mine
By B. Strickland
The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished
Jan 1, 1999
-
Design Of Surface And Near-Surface Construction In Rock
By A. J. Hendron, D. U. Deere, F. D. Patton, E. J. Cording
In the design of structures founded in the near-surface rock, a distinction may be made between those problems that are related to the strength of the rock mass, and those that are related primarily t
Jan 1, 1967
-
Design of the Akron Northside Interceptor CSO Tunnel - RETC2023
By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote
The City of Akron will construct the Northside Interceptor Tunnel project, a U.S. EPA/ DOJ CSO Long Term Control Plan Project. The system will provide at least 10.3 million gallons of storage in a 16.
Jun 13, 2023
-
Design Of The BMIP Boat Section - Introduction
By Kenneth Pidgeon
The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.
Jan 1, 1994
-
Design of the Brightwater Conveyance Tunnels
By Leon Maday, Dan L. Pecha, Jeremy Johnson, Daniel N. Adams
The Brightwater conveyance system includes 26 km of tunnels, a 130 mgd pump station, 2 km of micro tunnels, and a 2.4 km outfall. The tunnels extend from Woodinville to Puget Sound through varying soi
Jan 1, 2005
-
Design of the Epping to Chatswood Rail Line, Sydney, Australia
By Jim Rozek, Robert A. Gee
The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc
Jan 1, 2005
-
Design Of The Geologic Program At The Zortman And Landusky Mines, Little Rocky Mountains, Montana
By M. Stephen Enders
The Little Rocky Mountains host epithermal gold-silver bearing vein and stockwork deposits in a syenite intrusive complex. Pegasus Gold Ltd. is currently mining the oxidized deposits by open-pit metho
Jan 1, 1983
-
Design of the Melbourne City Link Tunnels
By S Porter, R Woodall, N Weeks
Nelsen, Porter and Wilson (1996) provided some preliminary concepts for the design of the Melbourne City Link tunnels. At that time, the City Link project was in the early design phase whereas now it
Jan 1, 1999
-
Design of the Metrowest Pressure Tunnel
By J. N. Eskilsson, W. P. Chen, J. L. Kaplin, V. S. Romero
The Massachusetts Water Resources Authority is currently improving its primary water supply system for the Boston Metropolitan area. The improvements planned by the Authority, which provides water fo
Jan 1, 1997
-
Design of the Primary Crushing Plant
By L. R. MacLead
Delivery of tailing to any part of the area by gravity from the ridge was found practicable. Experiments with asbestos-cement pipe proved it possible to use level pipe across the dams if it is fed thr
Jan 1, 1942
-
Design of the Proposed Speer/Sixth/Lincoln Tunnel - Denver, Colorado
By Henrie Henson, Dan Burroughs, Shyi-Shyong Jiang
Jan 1, 1993
-
Design Of The Sacaton Concentrator - Design Considerations
By Dennis K. Mortensen
The warm southwestern desert of Arizona is an ideal location for ASARCO's new Sacaton Unit. The climate of this arid region played a major role in the design considerations of the Unit's cru
Jan 1, 1974
-
Design of the Underground Structures of the Railway Link between the Town of Thumrait and the Port of Salalah: Segment 4c of the “Oman National Railway Project”
By Pedone Ezio Michele, Mohamed Dahir Holad
"The 4c segment is a part of the ""Oman National Railway Project” linking the mining area in the surroundings of Thumrait and the port of Salalah. It is 90 km long and the last 40 km stretch crosses a
Jan 1, 2016
-
Design of the University Link Tunnels and Stations
By Daniel N. Adams
The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter
Jan 1, 2008