Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tunnel Boring Machines in Mines – A?Brief Review of Past Use with a Status Report on Use Today in Australia
By M Rauer
With a worldwide growing population the demand for higher living standards, food and the development of new technology is rapidly rising. To allow for a continuous growth, larger quantities of mineral
Sep 17, 2014
-
Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus
By M Norbert, P Mok
The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double
Sep 17, 2014
-
The Measurement of Rock Stress for Tunnelling
By I Gray
While in some cases it is vitally important to measure the virgin stress in rock prior to tunnelling there are a number of cases where such stress measurement is really not required. The concept of ha
Sep 17, 2014
-
The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand
By T J. McGavin
This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm
Sep 17, 2014
-
Discrete Fracture Network Modelling for Tunnel Design in the Sydney Basin
By A L. de Ambrosis, F M. Weir, M Fowler
Traditional kinematic and statistical analyses of geological structure for geotechnical engineering applications, while considered industry standard practice, have some limitations and unrealistic ass
Sep 17, 2014
-
Precast Concrete Segmental Tunnel Linings – The State-of-the-art
By A Harding, M Chappell
Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig
Sep 17, 2014
-
Design of Segmental Lining for Waterview Project, Auckland, New?Zealand
By S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process
By T Ireland, S Eratne, W Newns, P Spies
The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest
Sep 17, 2014
-
Management of Health and Safety in Tunnelling – Application of Australian Coal Mining Knowledge
By G Marling, A Calderon, J Harris, P Kirsch, M Shi, D Sprott, A Kirsch
Large-scale infrastructure construction needs to comprehensively manage risks that can impact the health and well-being of many people, from workers (temporary, contracted or full time), to families a
Sep 17, 2014
-
An Alternative Approach for Assessing In Situ Stresses in Sydney
By D A. F Oliveira, C J. Parker
The role of the virgin in situ stress field in tunnelling projects is well known in the Sydney area. The effect of in situ stresses is mostly considered through the use of published relationships that
Sep 17, 2014
-
Safety in Underground Railway Stations – An Example of the Interplay between Testing and 3D Computational Fluid Dynamics Simulation
By R Stosch, D Lohberger, J Rodler, E Schnell and A Bassler, H Ramseier
In the last two decades three-dimensional (3D) computational fluid dynamics (CFD) simulations have become an important tool in engineering sciences. More recently, the safety requirements in undergrou
Sep 17, 2014
-
The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, Australia
By P K. Wong, D A. F Oliveira, F M. Azad
In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv
Sep 17, 2014
-
Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass
By B Chapman, R Nievergelt, J Hill
A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume
Sep 17, 2014
-
Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising Value
By G M. Taylor
The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past
Sep 17, 2014
-
Full-round Numerical Modelling of a Macro Synthetic Fibre Reinforced Tunnel Boring Machine Tunnel in the Shanghai Metro Extension
By L Nagy, K P. Juhasz
The authors were engaged to optimise a traditional rebar cage reinforced concrete segmental lining by means of finite element analysis (FEA) using macro synthetic fibres for the Shanghai metro extensi
Sep 17, 2014
-
Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques
By D Miller, M Dowling, R Domotor
"This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj
Sep 17, 2014
-
Underground Extension of the FGC Line in Sabadell through Cemented Soils
By R Justa Cámara, J María Bertrán Llop
"The need for suitable geotechnical characterisation of the rock mass for underground construction is evident. The enlargement project of Railways of the Generalitat of Catalunya (FGC) in Sabadell is
Sep 17, 2014
-
Estimation of Rock Load for Tunnels with Different Disturbance Factors
By J Rostami, T Afshar, M Sharifzadeh
Accurate estimation of rock load and selection of types of ground reinforcement to match post-failure behaviour of rock mass are important issues to assure tunnel stability. This paper focuses on the
Sep 17, 2014
-
A Review of the In Situ Stress Database for Tunnel Design in the Hawkesbury Sandstone, Sydney, New South Wales
By G McKay, M Erskine, S Macklin
The City of Sydney is currently investing in a number of infrastructure projects that require tunnel excavations within the Triassic Hawkesbury Sandstone. It is generally accepted that this formation
Sep 17, 2014
-
A Transparent and Pragmatic Quantitative Risk Assessment Process for Assessing Fire Safety in New Zealand Tunnels
By T Ireland, B Wright, S Weaver
All tunnels have unique characteristics that result in different fire and life safety risk. The fire safety systems for each tunnel also give different benefits at different costs. It is therefore nei
Sep 17, 2014