Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Risk Identification Expert System for Metro Construction Based on BIM
By Limao Zhang
This paper presents a BIM-based Risk Identification Expert System (B-RIES) for metro construction, composed of three main built-in subsystems: BIM extraction, knowledge base management, and risk ident
Aug 1, 2013
-
Industry Scale Knowledge Management ? Riskgate and Australian Coal Operations
RISKGATE is an interactive online risk management system developed by the Minerals Industry Safety and Health Centre (MISHC; University of Queensland) to maximise health and safety performance in the
Aug 1, 2013
-
Stress Regime of the Godavari Valley Coalfield, India
By A. Manohar Rao
Underground mining in general and more so the coal mining is a hazardous venture as it is a struggle against nature and natural forces. The stability of roadways has a direct impact on production and
Aug 1, 2013
-
The Dynamic Evolution Behaviours of the Mining Induced Fissure Elliptic Paraboloid Zone and its Application
By Shugang Li
Coal and coal-bed methane are valuable energy resources. If they can be extracted simultaneously and safely, the triple purposes of mine safety production, new energy resource supply and environmental
Aug 1, 2013
-
Pervasive Sensor Network for Real Time Environmental Monitoring in Construction Sites
By A. Carbonari
In order to gain competitiveness and compete at a global level, construction companies should improve their efficiency. The problem is even more relevant in the construction field, whose work processe
Aug 1, 2013
-
Komag?s Innovative Solutions for Mining Machines and Equipment
Some examples of the results of research projects, conducted in the KOMAG Institute of Mining Technology are presented. Special attention is paid to mining machines and equipment, and improving work s
Aug 1, 2013
-
Electrical Demand Reduction and Response Strategies for Underground Mining
By Nicholas C. Williams
This paper presents the development of a demand reduction and responsive strategy capable of reducing the electrical power demand, particularly during peak conditions. The work presented includes a ca
Aug 1, 2013
-
Automated Laser Scanner 2D Positioning and Orienting by Method of Triangulateration for Underground Mine Surveying
By Julian V. Simela
Conventional methods of underground surveying use theodolites/total stations and 3D laser scanners to obtain information about the underground environment. Current methods of geo-referencing these ins
Aug 1, 2013
-
Revised BQ System in China and its Correlation to International Rock Mass Classification Systems
By Yan-Jun Shen
The rock mass classification system, BQ (basic quality), is the only national system that is suitable to most kinds of rock engineering in China. It uses two main aspects of the rock mass, the intact
Aug 1, 2013
-
Laboratory Tests and Numerical Modeling During the Development of Thermal Insulating Shotcrete
By D. B. Apel
As depths to the ore bodies keep increasing around the globe, the problem how to deal with the increasing temperature of undisturbed rock mass becomes very important. In extreme cases the rock tempera
Aug 1, 2013
-
Development and Application of a Product Model for Shield Tunnels
By Nobuyoshi Yabuki
Building Information Modeling is a prevailing methodology in the building industry and half (by length) of the world's shield tunnels are in Japan. Accordingly, for shield tunnels from 2005 to 20
Aug 1, 2013
-
Analysis of Ventilation Schemes for Re-Opening a Mine Sealed after a Fire and Gas Explosion Event
By F. L. Wu
Based on the analysis of a sealed coal mine resulting from a fire-triggered explosion, limitations were discovered in the re-entry procedures used to reduce the size of the sealed area that were being
Aug 1, 2013
-
Reclamation Project Selection in an Open Pit Mine by using Fuzzy AHP
By M. Yavuz
As a branch of Operations Research, decision making is a widely used application in both science and social sciences. There are many different methods developed to solve decision making problems in th
Aug 1, 2013
-
Optimizing Microseismic Source Event Location by Applying a Variable Velocity Model to a Complex Geological and Mining Setting at the New Gold, New Afton Block Cave
Microseismic (MS) methods offer one of the few ways to monitor a 3D volume of rock and essentially see into the rockmass and the regions of real time rock fracture. This is a critical component when c
Aug 1, 2013
-
Laboratory Study on Rockbolt Corrosion
The effect of long term exposure of full size bolts to corrosive environments is presented. A special test rig was used to test four bolts under different loading conditions. Four, X-grade identical p
Aug 1, 2013
-
Multi-Point Concurrent Tracking and Surveying in Construction Field
By S. Mao
Total station has been predominantly applied in stationary survey scenarios in construction. With the moving target tracking and point survey automation functions, a robotic total station (RTS) lends
Aug 1, 2013
-
The Application Of IPCC at the Moatize Coal Project
By R. J. McCarthy
In-pit Crushing and Conveying (IPCC) is increasingly being considered by mining companies as a means to reduce their dependence on trucks and thus, fuel, tires, labour, etc. There is potential for gre
Aug 1, 2013
-
Numerical Modeling of Brittle Rock Failure Under Dynamic Stress Loading
By N. Golchinfar
Tunnels in deep mines are subjected to high stresses. Fracture and failure of the rock mass around an opening can occur when mining-induced stresses are high. In burst-prone grounds, mining-induced se
Aug 1, 2013
-
Regeneration of Congested Areas by Robotic Urban Renewal
By K. Iturralde
Dense transport infrastructure areas lack green facilities, they produce annoying noise and they are big energy consumers. As far as there is no free land or space, adding a vegetal covering to existi
Aug 1, 2013
-
Performance of the two EPBM in Istanbul Twin Metro Tunnel Excavations in Weak Rock
By Ibrahim Ocak
The prediction of machine utilization time and determining machine performance plays an important role in scheduling and planning tunnel excavation and data base created serve a major role in further
Aug 1, 2013