Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Design of a Steel Fibre Reinforced Concrete Segmental Tunnel Lining - City West Cable Tunnel Project, Sydney, Australia

    By A Kuras

    Segmental tunnel linings are becoming more common in Australia. One current project employing a segmental lining is the City West Cable Tunnel (CWCT) in Sydney. The project has been commissioned by En

    Jan 1, 2008

  • AUSIMM
    Planning and Investigation of the Airport Link Tunnel and Northern Busway, Brisbane

    By T Peglas, A de Aboitiz

    The Queensland Government, via the special purpose company vehicle û City North Infrastructure Pty Ltd û is currently developing BrisbaneÆs Airport Link underground toll road and Northern Busway (Wind

    Jan 1, 2008

  • AUSIMM
    Risk "Thinking" for Australian Tunnelling

    A paper presenting an overview of legislative and best practice approaches to the management of OHS&E and business risk for Australian tunnelling operations. Best practice can be achieved in

    Jan 1, 2008

  • SME
    NATM/SEM Analyses for San Francisco?s Transbay Extension Tunnel

    By Steve Klein

    The Transbay Downtown Extension (DTX) in San Francisco involves the construction of a large-span tunnel with a width ranging from 43 to over 60 feet. The tunnel will be excavated using the New Austria

    Jan 1, 2008

  • SME
    Openings for Nonmining Purposes

    By Madan M. Singh

    This section is unique to the Handbook in that it is the only section that deals with underground excavations for nonmining purposes. The editors were of the opinion that the section should be incorpo

    Jan 1, 2008

  • SME
    Underground Mine Development

    By G. T. Lineberry

    Underground mine development begins with the positive investment decision to mine and ends with the inception of full-scale exploitation. It incorporates all activities, personnel, and equipment requi

    Jan 1, 2008

  • SME
    Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO Project

    By Jean Habimana

    The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather

    Jan 1, 2008

  • AUSIMM
    An Appraisal of Tunnelling in the Auckland Region for Infrastructure Development

    By J St George

    Much of AucklandÆs transport infrastructure has been developed on surface with little or no consideration of underground options. Current and planned transportation routes are now facing high costs du

    Jan 1, 2008

  • SME
    Condition Assessment And Rehabilitation Of Tunnels: Case Histories From California?s Water Tunnels

    By David Van Horsen

    Operation and maintenance of California?s water tunnels is an important factor and vital link in California?s infrastructure. These tunnels are owned and operated by a variety of large and small priva

    Jan 1, 2008

  • SME
    Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project

    By Brian Fulcher

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1

    Jan 1, 2008

  • AUSIMM
    Operational Management of Fire Suppression Systems

    Fire suppression systems are now recognised by both NFPA 502 and PIARC as legitimate tools for both life protection and asset protection. The effectiveness of these tools for life protection demands e

    Jan 1, 2008

  • SME
    Large-Diameter Tunneling Collapses: Recovery Design and Execution

    By Bradford F. Townsend

    A study was made on six collapses that occurred during large-diameter tunnelling through weak sedimentary rocks and soil using SES methods in three stages?top heading, bench and invert. The collapsed

    Jan 1, 2008

  • SME
    Connections to Old Tunnels - Design Guidelines

    By Jozef F. Zurawski

    Increasingly new interceptors or new Combined Sewer Overflow (CSO) projects require connections to existing tunnels. More often than not, the existing facilities are old, in poor or questionable condi

    Jan 1, 2008

  • SME
    Tunneling?s Role In Sustainable Development Discussed At United Nations

    The Earth?s population is approaching 6.6 billion people. More than half live in urban areas. And, as those figures continue to grow, the need to make wise use of the world?s natural resources as we

    Jan 1, 2008

  • TMS
    Liberation of a Large Quantitiy of Waste Materials by the Explosion in Water: A Technique with a Relatively Low Energy Consumption

    By Gjergj Dodbiba, Atsushi Shibayama, Toyohisa Fujita, Takashi Shikazumi, Yukio Kato, Kenji Murata

    "A new crushing or liberation technique by means of underwater explosion is put forward. This technique is suitable for crushing and liberating various materials, for instance: the electric parts of t

    Jan 1, 2008

  • SME
    Risk Management of the Canada Line Transit Tunnels ? Introduction

    By Brendan Henry

    The Canada Line is a 19km long automated light rapid transit system with 16 stations in Vancouver, BC, Canada. The Concession was awarded to InTransitBC to design, build, partially finance, operate, a

    Jan 1, 2008

  • DFI
    Sonic Drilling and Sensitive Infrastructure

    By George Burnhart

    "Sonic drilling is a relatively new technology even though it has been in development since the late 1940s. It was initially funded by the U.S. petroleum industry and then, in the late 40s, Russian sc

    Jan 1, 2008

  • SME
    Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel

    By Russel Delmar

    Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope

    Jan 1, 2008

  • AUSIMM
    Peanuts and Tunnel Stuffing - The Brightwater Conveyance System East Contract

    By M E. Trim, J J. Johnson, W Cranston

    The Brightwater conveyance system is located near Seattle, Washington in the north-western United States. The East Contract portion of the system consists of a 4.3 km long, 5.9 m diameter tunnel in so

    Jan 1, 2008

  • SME
    Rock Mass Classification In Underground Bauxite Mines - Fokida

    By E. Koufetzis

    Rock mass classification systems are core elements of tunneling and empirical mine design worldwide. The Bauxite division of S&B Industrial Minerals S.A. decided to implement a rock mass classificatio

    Jan 1, 2008