Search Documents

Search Again

Search Again

Sort by

  • SME
    The Use of Polymer Concrete in Sewage Tunnels for One-Pass Segmental Linings

    By Christian Maguire

    The presence of hydrogen sulphide in sewerage systems leads to severe concrete corrosion. Acid causes breakdown of the concrete matrix, and attacks reinforcement. Older sewer systems under acid attack

    Jan 1, 2008

  • AUSIMM
    Lower Lea Valley Cable Tunnels - A Case Study of a Program Critical Project

    The purpose of the Lower Lea Valley Cable Tunnel project is to relocate the overhead power lines circuits, which currently cross the proposed site for the 2012 London Olympics in East London. This was

    Jan 1, 2008

  • AUSIMM
    Road Tunnel Protection by Water Mist Systems û Implementation of Full-Scale Fire Test Results into a Real Project

    Truck fires in a tunnel can create heat release rates (HRR) significantly higher than 100 MW. Because of a fast spread of smoke and heat the self-rescuing period is shortened significantly. Furthermor

    Jan 1, 2008

  • SME
    Battery Park Truck Sewer Emergency Tunnel Project

    By Mark Rybak

    On August, 31, 2006, Tropical Storm Ernesto hit the City of Richmond, Virginia. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapse

    Jan 1, 2008

  • AUSIMM
    Aspects of the Design and Construction of the Chong Ming Tunnel Shanghai

    By R Frew, E Wong, G Ferguson

    The Chang Jiang Tunnel and Bridge Project, when completed, will provide a fixed link between ShanghaiÆs rapidly developing Pudong District and Chong Ming Island, situated in the Yangtze River delta. T

    Jan 1, 2008

  • SME
    Stanford LCLS Project - Detailed Construction Design for the Intersection Between Access Tunnel and FEH Cavern

    By Heiner J. Sander

    Stanford University operates the National Research Facility which is located at the Stanford Linear Accelerator Center (SLAC) in Menlo Park, California. In order to improve and allow for enhanced expe

    Jan 1, 2008

  • SME
    Surface Mining: Mechanical Extraction Methods

    By M. K. McCarter

    Surface mining applies to extraction of mineral resources from water and sediments of rivers, lakes, seas, and oceans; from solutions circulating through broken rock and soil; and from rock and soil e

    Jan 1, 2008

  • SME
    Production Operations

    By Lee W. Saperstien

    At the heart of the mining process are a number of basic and fundamental tasks whose regular and repeated performance constitute the mining cycle. As will be discussed presently, these tasks are the b

    Jan 1, 2008

  • DFI
    King?s Cross Station Re-Development Passive And Active Mitigation Of Tunnelling - Induced Settlement

    By Clif Kettle

    The paper will detail the design and execution of passive and active settlement control measures, the means adopted to overcome the various physical and operational constraints, and to meet specified

    Jan 1, 2008

  • SME
    Comparison of Performance of Two Commonly Used Flexible Dilatometers (FDT) in Determining Deformation Modulus of a Tunnel Host Rocks ? Introduction

    By Morteza Gharouni Nik

    Flexible Dilatometer Test (FDT) is one of the in-situ test methods for determining the deformational characteristics of rock masses. In this study, several dilatometer tests have been conducted in dif

    Jan 1, 2008

  • SME
    Multi-Tool Miner For All Rock Conditions

    By W. J. Kogelmann

    Roadheaders, also called Boom Miners or Boom-type Tunneling Machines have been in North America since 1968, when first introduced by Willy Kogelmann, the founder of Alpine Equipment Corp. (?Alpine?).

    Jan 1, 2008

  • SME
    Utilization of Strain Measurements on Shielded Tunnel Boring Machines

    By Brad Murray

    Evaluating the performance of a shielded tunnel boring machine (TBM) can be difficult because the ground cannot be observed directly and in relation to the TBM attitude within the excavation. It is di

    Jan 1, 2008

  • SME
    Beach Sewer Tunnel Rehabilitation ? Introduction

    By Albert Ruiz

    South Coast Water District (District) operates the Beach Interceptor Sewer Tunnel (BIST) in South Laguna, Orange County, California between Mon-arch Beach and Aliso Beach (Figure 1). The 10,424-foot l

    Jan 1, 2008

  • SME
    Getting the Right Contract Package

    By W. W. Edgerton

    Construction projects may be delivered under one contract package or multiple packages divided by discipline, geographic location, or other characteristics. Dividing the construction into contract bid

    Jan 1, 2008

  • SME
    Field Application of NTH Fracture Classification at the Second Manapouri Tailrace Tunnel, New Zealand

    By Don F. Macfarlane

    This paper describes the field application of the NTH fracture classification to rock encountered in the construction of the 9.6 km long, 10m diameter, Second Manapouri Tailrace Tunnel. Excavation of

    Jan 1, 2008

  • SME
    NATM Tunnels at Stanford Linear Accelerator Center, Menlo Park, California

    By P. J. Doig

    The LCLS project at SLAC will allow new insights into material properties, chemical reactions and biological processes. The project includes half a mile of new underground construction. Excavation in

    Jan 1, 2008

  • AUSIMM
    Tugun Bypass Tunnel Using Top-Down Cut-and-Cover Method

    By M Thomas, S Lambert

    The Tugun Bypass Tunnel in Gold Coast, Australia was constructed using diaphragm walls with the top-down cut-and-cover method to allow simultaneous construction of an airport runway extension above th

    Jan 1, 2008

  • AUSIMM
    Rapid Tunnelling Technologies at Cadia East

    As part of a prefeasibility study being undertaken by Newcrest Mining Limited, the Cadia East Implementation Team has developed an access decline to the proposed underground operation. This paper desc

    Jan 1, 2008

  • SME
    Geology of the Clean Water Coalition?s Proposed Reach 4 Tunnel and its Effect on Design, Las Vegas, NV

    By Ray Brainard

    Treated effluent from the Clean Water Coalition (CWC) member agencies is currently discharged at an annual average rate of 6,570 l/s into the Las Vegas Wash, and is increasing annually. As the effluen

    Jan 1, 2008

  • DFI
    DFI 2008 Outstanding Project Award Winner Intricate Excavation for the New South Ferry Subway Station

    By Alice Arana, David M. Cacoilo, Joel L. Volterra

    "To make space for the new South Ferry Station in lower Manhattan, engineers and contractors carved out a new tunnel beneath three operating subway tunnels and tangentially to yet another tunnel. Crea

    Jan 1, 2008