Retaining Wall Installation Beneath An Existing Structure
By Kenton W. Braun
Concourse B at the Anchorage, Alaska International Airport is currently being renovated while retaining the original building structure and foundations. Part of the renovation includes the installati
Jan 1, 2008
-
L-73 Tunnel, Woodbury, Minnesota
By Michael B. Gilbert
The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o
Jan 1, 2008
-
Utilisation of Underground Space in Final Open Pit Walls at Surface Mines
By T Sasaoka, H Shimada
Mined-out limestone/aggregate quarries in Japan contain many high and enormous pit walls. Many precious resources are abandoned in these final pit walls. In addition, there are many mines which are lo
Jan 1, 2008
-
Underground Mining: Supported Methods
By Fred W. Brackebush
In underground stopes that require more than minimal support, backfill is almost universally used. The term cut and fill stopingis used in a broad sense in this section, which describes underground mi
Jan 1, 2008
-
Automated Loading and Hauling Experiences at De Beers Finsch Mine
By R Grobler, D Burger, L Alberts
The current climate in the mining industry is allowing mining companies to further broaden their views and investigate technologies to improve the safety, efficiency and cost-effectiveness of their op
Jan 1, 2008
-
North Shore Connector Tunnel Project, Pittsburgh, USA
By M D. Boscardin, P A. Roy
The North Shore Connector Project for the Port Authority of Allegheny County involves TBM tunnelling twin light rail tunnels through cohesive soils and rock under the Allegheny River and a narrow city
Jan 1, 2008
-
Tunnel Boring Machine Development
By Martin Herrenknecht
Tunnel boring machine (TBM) development continues to take on not only larger diameters, but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressures u
Jan 1, 2008
-
Development and Implementation of the Garford Dynamic Bolt at the Kanowna Belle Mine
By R Lachenicht, J Player, A Thompson, E Villaescusa
Kanowna Belle Gold Mine is a deep, high-stress, sublevel open stoping mine located near Kalgoorlie. Seismic activity during the development cycle presented problems, including concerns regarding the e
Jan 1, 2008
-
Urban Tunnelling Challenges - Mechanised Tunnelling to Improve Life Quality in Cities
By U Rehm
The biggest hard rock double-shield tunnel boring machine (TBM) in the world, with a diameter of 12.4 m, is currently excavating the North-South Bypass, which includes a crossing under the Brisbane Ri
Jan 1, 2008
-
Mechanised Tunnelling Technologies for Mining Applications
The increasing global demand for rough materials forces almost every mine to look at the mechanisation in their processes. This will not onlyimprove performance but with safety issues becoming more an
Jan 1, 2008
-
Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK
By Andy Alder
The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t
Jan 1, 2008
-
Introduction to Mining
Contributions made by mining have played a much more significant role in the development of civilization than is generally conceded by historians or recognized by ordinary citizens. In modern society,
Jan 1, 2008
-
Numerical Analysis of Time-Dependent Creep Behaviour of Tunnel Support Systems
By R. Chen
Most tunnels built in Sydney encounter similar ground situations; they penetrate either the Hawkesbury Sandstone or the shales that lie beneath the city. Tunnels in these materials are generally sup-p
Jan 1, 2008
-
San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger Shield
By Brett Campbell
The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa
Jan 1, 2008
-
Three-Dimensional Modelling of Construction Tolerance in Trapezoidal Segments
By R Bertuzzi
This paper presents a three-dimensional analysis of a trapezoidal-shaped segmental tunnel lining for a recent tunnelling project in Sydney. Two- dimensional analyses, hand calculations and equipment s
Jan 1, 2008
-
Cooling Water Intake Shafts for the Oak Creek Expansion
By Edward Jacobsen, Patrick J. Lydon
"The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake
Jan 1, 2008
-
Design and Construction of Tunnel and Shaft Plugs
By James W. Marold
Tunnel and shaft plugs have been designed to assist in construction of new and rehabilitation of existing tunnels and shafts. Tunnel plugs have been used to provide construction access for side by sid
Jan 1, 2008
-
Underground Mining: Comparison of Methods
By Stephen A. Orr
Underground mining is a dynamic art and science with a diverse set of design, production, and economic criteria that must be considered before selecting an optimal method to extract the ore. While all
Jan 1, 2008
-
Design Basis and Construction Experience for a Bolt and Shotcrete Lined Tunnel for the Wambo Rail Spur
By I Chan
The Wambo Rail Spur located near Singleton, New South Wales, Australia, runs for 14 km linking the Mt Thorley rail loop and running north-west alongside Jerrys Plain Road to the Wambo Coal Mine at War
Jan 1, 2008
-
Tunnel Groundwater Inflow Measurement
By R Witt, M Lowing
Tanking of tunnels is now often specified when inflows exceed as little as 1 L/s/km with a unit distance of 100 m. To demonstrate inflows over a 100 m segment of a tunnel are less than 0.1 L/s with a
Jan 1, 2008