Search Documents

Search Again

Search Again

Sort by

  • NIOSH
    Rock Mass Characterization For Excavations In Mining And Civil Engineering

    By Nick Barton

    When the Q-system was launched in 1974, the name referred to rock mass classification, with focus on tunnel and cavern support selection. Besides empirical design of support, the Q-value, or its norma

    Jan 5, 2007

  • NIOSH
    Problems With Rock Classification For Empirical And Numerical Design

    By Douglas Milne

    Most empirical and numerical approaches to design in rock mechanics incorporate rock mass classification. Numerical design methods generally use classification values to calculate input parameters for

    Jan 5, 2007

  • NIOSH
    The Geological Strength Index (GSI): A Characterization Tool For Assessing Engineering Properties For Rock Masses

    By Paul G. Marinos, Vassilis Marinos, Evert Hoek

    The Geological Strength Index (GSI) is a system of rock mass characterization that has been developed in engineering rock mechanics to meet the need for reliable input data related to rock mass proper

    Jan 5, 2007

  • SME
    New Tunneling Innovations Revolve Around More Efficient Disc Cutters

    By Desiree Willis

    Disc cutters have determined excavation rates of rock tunneling projects for more than 50 years. First developed in 1956 by James S. Robbins, disc cutters (then 279 mm or 11 in. in diameter) were use

    Jan 1, 2007

  • SME
    Los Angeles Metro Gold Line Eastside Extension—Tunnel Construction Case History

    By Christophe Bragard, Brett Robinson

    This paper reflects the challenges encountered during the construction of the light rail tunnels under Boyle Heights, in Los Angeles, California. Equipped with two state-of-the-art EPB TBMs, the c

    Jan 1, 2007

  • SME
    The Relationship Between Tunnel Convergence and Machine Operational Parameters and Chip Size for Double Shield TBMs— A Case History of Ghomroud Water Conveyance Tunnel

    By Jamal Rostami, Ebrahim Farrokh

    Selection of tunneling method, specially the use of shielded machines for application in deep rock tunnels can be heavily impacted by presence of ground convergence and squeezing conditions. Tunnel co

    Jan 1, 2007

  • SME
    Alternative Contracting Methods

    By John Reilly

    Traditional methods of project procurement of have remained virtually unchanged in the U.S. infrastructure construction industry for more than 50 years. The traditional method, Design-Bid-Build (DBB),

    Jan 1, 2007

  • SME
    Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in Austria

    By Helmut Westermayr, Michael Tergl

    DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t

    Jan 1, 2007

  • SME
    Urban Blasting Essential to Schedule Driven West Area CSO Tunnel and Pumping Station Project

    By James McNally, Adam Stremcha, John MacGregor

    With 13.7km of TBM tunneling in Atlanta’s hard gneiss well under way, drill and shoot work continues on several sites throughout the city. In order for the City of Atlanta to meet the consent decree i

    Jan 1, 2007

  • SME
    Middle Rouge Parkway Interceptor Extension—A Case History

    By Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty

    The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in

    Jan 1, 2007

  • NIOSH
    Performance Of A Light Scattering Dust Monitor At Various Air Velocities: Results Of Sampling In The Active Versus The Passive Mode

    By Jeffrey M. Listak

    The Respiratory Hazards Control Branch of NIOSH routinely conducts laboratory and mine-site evaluations of dust control technologies. Gravimetric and instantaneous dust sampling instruments are used i

    Jan 1, 2007

  • SME
    Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project

    By James J. Kabat, James A. McDonald

    Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat

    Jan 1, 2007

  • CIM
    Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin Flon

    By J. M. Cooper

    The HBMS reverb furnace in Flin Flon was originally designed in the late 1920s. Throughout the decades campaign life has been increased due to operational practices, technological changes and brick qu

    Jan 1, 2007

  • CIM
    Continuous Reactor Altonorte Smelter

    By R. ZapataN.

    "In the following report, Altonorte Smelter owned by Xstrata will explain its experience with its denominated furnace called ""Continuous Altonorte Reactor"" since started up in March 2002. The Reacto

    Jan 1, 2007

  • SME
    Monitoring Used as an Alarm System in Tunneling

    By M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli

    This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th

    Jan 1, 2007

  • SME
    Inner City Slurry Tunneling—Project Asdam, Antwerp, Belgium

    By Klaus Rieker

    North of Antwerp central train station, two single-track tunnels for the high-speed train line between Brussels and Amsterdam were constructed. At the same time, the central train station was modified

    Jan 1, 2007

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007

  • SME
    NATM Design For Stanford Linac Coherent Light Source Tunnels

    By Jonathan Taylor, Irwan Halim, Frederick (Rick) Vincent

    The new underground facilities for the LINAC Coherent Light Source project at the Stanford Linear Accelerator Center in Menlo Park, CA, are constructed in very weak sedimentary rock interspersed with

    Jan 1, 2007

  • SME
    CSO Control At Detroit?s Upper Rouge Tunnel

    By Wern-ping Chen

    To mitigate and control the combined sewer over-flows from 17 outfalls in Detroit, MI, three outfalls in Dearborn Heights, MI and eight outfalls in Redford Township MI, the Detroit Water and Sewerage

    Jan 1, 2007

  • SME
    Use of Tunnel Boring Machines at Depth: Extending the Limits

    By Peter Dowden, Trevor Carter, Allan Moss, Bruce Downing, Richard Beddoes

    Traditionally (with a few exceptions) tunnel boring machines (TBMs) have been utilized on tunnel projects where the risks associated with deep tunnels (rock burst, squeeze, etc) are low (or expected t

    Jan 1, 2007