Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
-
Design and Construction of Dulles Airport Tunnels
By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field
With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn
Jan 1, 2007
-
Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”
By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla
One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently
Jan 1, 2007
-
Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access Project
By Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis
East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta
Jan 1, 2007
-
The United States? Role With The International Tunnelling Association
By Harvey Parker
The International Tunnelling and Under-ground Space Association (ITA) is a nonprofit organization that represents all aspects of the tunneling and underground space industry worldwide. The United Sta
Jan 1, 2007
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio
By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Environmental Assessment Study For Extension Of Spadina Subway In Toronto
By Verya Nasri, Scott Thorburn
The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi
Jan 1, 2007
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California
By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Development of Slurry Wall Technique and Equipment and CSM Cutter Soil Mixing for Open Cut Tunnels
By W. G. Brunner
The slurry wall technique has undergone an evolution from its invention to its today’s status. In the early stages slurry walls were built with cable grab, later on with much stronger hydraulic grab a
Jan 1, 2007
-
The Big Walnut—A Planned Approach
By Tom Szaraz, Steve Skelhorn
Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer (BWOAS) consists of 4,000m (13,200 ft) of 3.66m (12 ft)diameter tunnel passing mainly through
Jan 1, 2007
-
Forensics Of Difficult Ground Conditions Leading To Advanced Solutions For Recovery Of An Abandoned Tunnel Project
By Faruk Oksuz, Phillip L. Covell, Martin Doll
A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200
Jan 1, 2007
-
Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct Tunnel
By C. D. Hebert, M. R. King
The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with
Jan 1, 2007
-
Kárahnjúkar Hydroelectric Project, Iceland Extreme Underground Construction
By Bernhard Leist, William D. Leech, Johann Kröyer, Holger Evers
Landsvirkjun—the national electric power company of Iceland—is building the Kárahnjúkar Hydroelectric Project in eastern Iceland. Two glacial river systems will be dammed and channeled through a serie
Jan 1, 2007
-
Metallurgical Accounting in the Northparkes Concentrator - A Case Study
By R Morrison, R Dunn
In many mineral processing operations, the reported production figures for an accounting period may not make the best use of available data. While most of the mathematical approaches, such as check-in
Jan 1, 2007
-
Design Risk Mitigations for Contract CQ028 of the East Side Access Project
By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Development of Steel-Fiber Reinforced High Fluidity Concrete Segment and Application to Construction
By Aki Fujii, Hiroshi Dobashi, Mitsuro Matsuda, Yoshinari Kondo
INTRODUCTION The Metropolitan Expressway Central Circular Route with a total length of approximately 47 km is located outside the Inner Circular Route of Tokyo (at a radius of approximately 8 km f
Jan 1, 2007
-
Innovative use of SMART cable bolt data through numerical back analysis for interpretation of post failure rock mass properties
By J. J. Crowder, A. L. Coulson
Ground support is a significant component of underground mining costs. The rehabilitation of failed support, however, is often much more expensive than the initial installation. This paper investigate
Jan 1, 2007
-
Excavation And Support Of A Water Tunnel Through The Hayward Fault Zone
By Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo
The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p
Jan 1, 2007
-
A Review of Processing at the Cannington Ag/Pb/Zn Mine
By G Clarke
Commissioning of the Cannington processing plant began in October 1997. The nameplate capacity (of 1.55 million tonnes of ore per annum) was achieved relatively quickly. Since then (like many mines) t
Jan 1, 2007
-
Portland, Oregon’s Alternative Contract Approach—A Final Summary
By Paul Gribbon, Julius Strid, Greg Colzani, Jim McDonald
Portland, Oregon’s $370 million West Side Combined Sewer Overflow Tunnel Project has completed the final phase of construction and commissioning. The construction contract, which began in September 20
Jan 1, 2007