Search Documents

Search Again

Search Again

Sort by

  • SAIMM
    Dp3 Tunnels Section

    Power Point Presentation

    Jan 1, 2007

  • SME
    Design and Construction of Dulles Airport Tunnels

    By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field

    With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn

    Jan 1, 2007

  • SME
    Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”

    By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla

    One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently

    Jan 1, 2007

  • SME
    Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access Project

    By Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis

    East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta

    Jan 1, 2007

  • SME
    The United States? Role With The International Tunnelling Association

    By Harvey Parker

    The International Tunnelling and Under-ground Space Association (ITA) is a nonprofit organization that represents all aspects of the tunneling and underground space industry worldwide. The United Sta

    Jan 1, 2007

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • SME
    Environmental Assessment Study For Extension Of Spadina Subway In Toronto

    By Verya Nasri, Scott Thorburn

    The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi

    Jan 1, 2007

  • SME
    Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California

    By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow

    The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo

    Jan 1, 2007

  • SME
    Development of Slurry Wall Technique and Equipment and CSM Cutter Soil Mixing for Open Cut Tunnels

    By W. G. Brunner

    The slurry wall technique has undergone an evolution from its invention to its today’s status. In the early stages slurry walls were built with cable grab, later on with much stronger hydraulic grab a

    Jan 1, 2007

  • SME
    The Big Walnut—A Planned Approach

    By Tom Szaraz, Steve Skelhorn

    Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer (BWOAS) consists of 4,000m (13,200 ft) of 3.66m (12 ft)diameter tunnel passing mainly through

    Jan 1, 2007

  • SME
    Forensics Of Difficult Ground Conditions Leading To Advanced Solutions For Recovery Of An Abandoned Tunnel Project

    By Faruk Oksuz, Phillip L. Covell, Martin Doll

    A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200

    Jan 1, 2007

  • SME
    Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct Tunnel

    By C. D. Hebert, M. R. King

    The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with

    Jan 1, 2007

  • SME
    Kárahnjúkar Hydroelectric Project, Iceland Extreme Underground Construction

    By Bernhard Leist, William D. Leech, Johann Kröyer, Holger Evers

    Landsvirkjun—the national electric power company of Iceland—is building the Kárahnjúkar Hydroelectric Project in eastern Iceland. Two glacial river systems will be dammed and channeled through a serie

    Jan 1, 2007

  • AUSIMM
    Metallurgical Accounting in the Northparkes Concentrator - A Case Study

    By R Morrison, R Dunn

    In many mineral processing operations, the reported production figures for an accounting period may not make the best use of available data. While most of the mathematical approaches, such as check-in

    Jan 1, 2007

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • SME
    Development of Steel-Fiber Reinforced High Fluidity Concrete Segment and Application to Construction

    By Aki Fujii, Hiroshi Dobashi, Mitsuro Matsuda, Yoshinari Kondo

    INTRODUCTION The Metropolitan Expressway Central Circular Route with a total length of approximately 47 km is located outside the Inner Circular Route of Tokyo (at a radius of approximately 8 km f

    Jan 1, 2007

  • CIM
    Innovative use of SMART cable bolt data through numerical back analysis for interpretation of post failure rock mass properties

    By J. J. Crowder, A. L. Coulson

    Ground support is a significant component of underground mining costs. The rehabilitation of failed support, however, is often much more expensive than the initial installation. This paper investigate

    Jan 1, 2007

  • SME
    Excavation And Support Of A Water Tunnel Through The Hayward Fault Zone

    By Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo

    The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p

    Jan 1, 2007

  • AUSIMM
    A Review of Processing at the Cannington Ag/Pb/Zn Mine

    By G Clarke

    Commissioning of the Cannington processing plant began in October 1997. The nameplate capacity (of 1.55 million tonnes of ore per annum) was achieved relatively quickly. Since then (like many mines) t

    Jan 1, 2007

  • SME
    Portland, Oregon’s Alternative Contract Approach—A Final Summary

    By Paul Gribbon, Julius Strid, Greg Colzani, Jim McDonald

    Portland, Oregon’s $370 million West Side Combined Sewer Overflow Tunnel Project has completed the final phase of construction and commissioning. The construction contract, which began in September 20

    Jan 1, 2007