Search Documents

Search Again

Search Again

Sort by

  • SME
    New York City’s Harbor Siphons Water Tunnel

    By Colin Lawrence, Michael S. Schultz

    Due to the planned deepening of the NY Harbor, NYCEDC/NYCDEP is planning to replace two existing water lines between Brooklyn and Staten Island with one deeper water pipe. The crossing, just north of

    Jan 1, 2007

  • ISEE
    The Assessment of Environmental Impacts of Blasting During The Construction of A Metro Tunnel

    By Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Kagan Ozdemir, Adiguzel Deniz

    This paper presents the results of ground vibration measurements induced by blasting during the construction of the Istanbul Kadiköy-Kartal metro tunnel which has been driven at a depth of approximate

    Jan 1, 2007

  • SME
    Brightwater Conveyance System Will Expand Seattle?s Wastewater Treatment

    By John E. Newby

    Washington?s King County is constructing a new regional wastewater treatment facility, called Brightwater, in response to growth in the greater Seattle region. Planning conducted in the late 1950s ide

    Jan 1, 2007

  • SME
    Planning and Construction of the Metro Gold Line Eastside Extension Tunnels, Los Angeles, California

    By Jim Richards, Eli Choueiry, Brett Robinson, Amanda Elioff

    The Los Angeles Metro Gold Line Eastside Extension (MGLEE) extends Metro’s light rail system to the densely populated and growing East Los Angeles communities. Much of the 6 mile alignment consists of

    Jan 1, 2007

  • SME
    Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving Data

    By Descour Jozef, Suguru Shirasagi, Takuji Yamamoto, Koji Murakami

    For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was deve

    Jan 1, 2007

  • SME
    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • SME
    Waterproofing of a Subsea Tunnel with a Unique Sprayable Membrane— The Nordöy Road Tunnel, Faroe Islands

    By Sigurd L. Lamhauge, Karl Gunnar Holter, Svein E. Kristiansen

    An innovative sprayable waterproofing membrane in combination with the traditional Nordic method of waterproofing with polyethylene foam sheets was used for the waterproofing of the tunnel. The spraya

    Jan 1, 2007

  • SME
    Cracking The Code—Assessing Implementation In The United States Of The Codes Of Practice For Risk Management Of Tunnel Works

    By Terry W. Mellors, Robert J. F. Goodfellow

    The underground industry has been forced to reconsider risk management sincethe introduction and implementation of the “Joint Code of Practice for Risk Management of Underground Works in the UK” publi

    Jan 1, 2007

  • SME
    Designing the Alaskan Way Tunnel to Withstand a 2,500-Year Earthquake

    By Gordon T. Clark, James R. Struthers, Celal Kirandag

    INTRODUCTION Project Background The Washington State Department of Transportation (WSDOT) hired the Seattle office of Parsons Brinckerhoff to lead a team of consultants to produce an Environ-men

    Jan 1, 2007

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • SME
    Niagara Tunnel Project

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.

    Jan 1, 2007

  • SME
    Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels Project

    By Chris Tattersall, Tomyuki Kudo, Peter Raleigh, Nestor Garavelli, Steve Redmond, Michael J. Lehnen

    Twin bore running tunnels driven approximately 4,500 route feet by a Mitsubishi Heavy Industries (MHI) EPB Tunnel Boring Machine link the West Portal and East Portal on this complex Light Rail Project

    Jan 1, 2007

  • SAIMM
    SORD - A Novel Underground Dredge Mining Technology

    By N. Graham, C. Walker

    The SORD Miner is a patented mining principle being developed to exploit mineral and energy resources that current technology can not access. SORD Miner is designed to operate in underground wet, gran

    Jan 1, 2007

  • SME
    Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New Zealand

    By Charlie Watts, Ken Smales, Ron Fleming

    The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace

    Jan 1, 2007

  • SME
    Evaluating Ground Conditions Ahead of a TBM Using Probe Drill Data

    By Steven K. Duke, Jay Arabshahi

    An economic, real-time probe drill monitoring system was developed for Metropolitan Water District’s Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system

    Jan 1, 2007

  • SME
    An Innovative Approach to Tunneling in the Swelling Queenston Formation of Southern Ontario

    By Michael Hughes, Paul Bonapace, Harry Charalambu, Stephen Rigbey

    Ontario Power Generation is building a 10.4-km water diversion tunnel in Niagara Falls, Canada. The tunnel is a two-pass, cast-in-place prestressed concrete-lined pres-sure tunnel with a nominal inter

    Jan 1, 2007

  • CIM
    The Copper-Cobre Series of Conferences: A Prime Forum for Active Discussion of Copper Smelting Technology Practice and Innovation

    By C. M. Diaz, P. J. Mackey

    Since its inception, in 1987, the Copper-Cobre series of conferences has established itself as the prime world forum for discussing advances in copper process metallurgy, in particular copper sulfide

    Jan 1, 2007

  • SME
    Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island

    By Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert

    Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his

    Jan 1, 2007

  • SME
    TBM Excavability: Prediction and Machine–Rock Interaction

    By Z. T. Bieniawski, José Miguel Galera, Benjamín Celada

    TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj

    Jan 1, 2007