  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • CIM
    The challenge of cyanide: opportunities and challenges for backfill operations presented by the International Cyanide Management Code (c016848d-6efa-4811-a8e4-a76c65667864)

    By C. L. Reichardt

    "Pressure exerted on gold producers by regulators, project financiers, and civil society in the wake of the Baia Mare tailings spill in Romania during 2000 prompted most responsible gold companies to

    Jan 1, 2007

  • SME
    Piercing The Mountain And Overcoming Difficult Ground And Water Conditions With Two Hybrid Hard Rock TBMS

    By Brian Fulcher, Michael Bell, Shimi Tzobery, Werner Burger, John Bednarski

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft3/sec) of water into Southern California. The 13

    Jan 1, 2007

  • SME
    Innovations in Underground Communication Infrastructures

    By Darrell Gillis

    Recent accidents in the United States underground Coal Mines and the on-going carnage in Underground Chinese Coal Mines has shown the danger associated with the lack of communication infrastructures i

    Jan 1, 2007

  • SME
    The DC WASA Anacostia River CSO Control Tunnel Project

    By David C. Girard, Larry Williamson, Leonard R. Benson, Ronald E. Bizzarri

    On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and floo

    Jan 1, 2007

  • SME
    EPB Tunnel Boring Machine Design For Boulder Conditions

    By Craig Bournes, David Chapman, Michael DiPonio

    Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje

    Jan 1, 2007

  • SME
    Construction of a Mixed Face Reach Through Granitic Rocks and Conglomerate

    By John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler

    The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol

    Jan 1, 2007

  • ISEE
    The Investigation of Ground Vibrations Induced by Bench Blasting at Different Quarries at Catalca District in Turkey

    By Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Deniz Adiguzel

    The environmental problems arising from ground vibration has been faced and discussed frequently in various industries such as quarry, mining, civil works, shaft, tunneling, pipe line and dam construc

    Jan 1, 2007

  • SME
    Challenges And Solutions To Designing Deep Excavations For Urban Transit Stations

    By Ching-Liu Wu, John Hawley, Andrew H. Liu, James Chai

    The Hatch Mott MacDonald/Bechtel Joint Venture team is designer and construction manager for the 5.25-mile Tunnel Segment of the overall 16-mile Silicon ValleyRapid Transit Project, which extends the

    Jan 1, 2007

  • SME
    Pre-Excavation Grouting Through Water Bearing Zone Under High Pressure Under Extreme Flow Conditions

    By Adam Shang Robert Fu

    The Yung-Chung-Tunnel in Taiwan, constructed for the Taiwan-East Railway Bureau, collapsed during construction when a water bearing, fractured marble zone was intersected. The inflow was approximately

    Jan 1, 2007

  • SME
    Monitoring Successful NATM in Singapore

    By K. Zeidler, T. Schwind

    The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo

    Jan 1, 2007

  • SME
    Guidance for Partial Face Excavation Machines

    By Jochen Belz, Allan Henneker, Nod Clarke-Hackston

    For the construction of tunnels and other underground structures, extraction of the exact amount of material is of paramount importance both economically and for engineering purposes. In the Sequentia

    Jan 1, 2007

  • SME
    Risk Management In Action—Controlling Difficult Ground By Innovation

    By A. Moergeli

    The Swiss are building the world’s longest tunnel, the 57-Kilometer (35-mile) long Gotthard Base Tunnel. Lot 252, Tunnel Amsteg: Two Hard Rock Tunnel Boring Machines (TBM) crossed hydro-thermally deco

    Jan 1, 2007

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • SME
    The Kensico-City Tunnel Will Add Reliability to New York City’s Water Supply System

    By Verya Nasri, Heather M. Ivory, Kevin Clarke, Eric Cole

    Development of the New York City Water Supply System The New York City water supply system serves a population of almost nine million, including residents in neighboring counties. Peak day demands

    Jan 1, 2007

  • SME
    Joint Water Pollution Control Plant Tunnel and Ocean Outfall Project

    By Steve Dubnewych, Jon Kaneshiro, Calvin Jin

    The Joint Water Pollution Control Plant (JWPCP), operated by the Sanitation Districts of Los Angeles County (the Districts), treats wastewater generated by over3 million people and processes wastewate

    Jan 1, 2007

  • SME
    Beacon Hill Station Dewatering Wells and Jet Grouting Program

    By Zephaniah Varley, Dominic Parmantier, Paul Schmall, Richard Martin, Red Robinson

    Sequential excavation of the Beacon Hill Station has been accomplished in highly complex and inter-layered sand, silt, and clay soils with multiple perched groundwater tables. Successful excavation ha

    Jan 1, 2007

  • SME
    New Test Methodology For Estimating The Abrasiveness Of Soils For TBM Tunneling

    By F. Dahl, P. Raleigh, J. Holzhauser, B. Nilsen

    Tunnel excavation using tunnel boring machines (TBMs), has become increasingly common in recent years, despite the fact that precise evaluation of certain risks have not kept pace with the use of thes

    Jan 1, 2007

  • SME
    Support Of The Leipzig City—Tunnel Extension Using A Tie-Back Supported Freeze Wall

    By Helmut Hass, Michael B. Gilbert

    The extension of the commuter railway system (S-Bahn) in Leipzig, Germany willrequire the construction of an underground line crossing the downtown area of thecity to tie the Bavarian Station in the S

    Jan 1, 2007