Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, Ohio
By Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski
Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p
Jan 1, 2005
-
Developments of Granular Emulsion Explosives
By Takuya Taguchi, Toshihiro Ogata, Atsuio Inoue, Shigeyuki Sasaki
Highly improved drilling machines and mucking machines have been used for the underground construction. To have rapid construction, the roles of blasting operation ha ve been growing more important. A
Jan 1, 2005
-
Adventures in Microtunneling
By Joseph Clare, Elizabeth Anderson, Mike McGinley, Ron Hines, Judy Cochran
The South Lake Union Pipelines contract for King County Wastewater Treatment Division and Seattle Public Utilities in Seattle, Washington included three 1.8 m (72-in)inside diameter microtunneled pipe
Jan 1, 2005
-
The Relationship Between The Client, Clients Project Team And The EPCM Project Team
By C. A. F. Sweet
The inter-relationship between these parties and the effect on the outcome of the project is often grossly underestimated. There are numerous success stories where the parties have worked as com
Jan 1, 2005
-
Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington
By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson
A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR
Jan 1, 2005
-
Northeast Interceptor Sewer Case History
By Brett Zernich, Michael Krulc, Brett Robinson
This paper provides an account of the efforts undertaken to construct the Northeast Interceptor Sewer (NEIS) project, which is a portion of a much larger program in Los Angeles, California to upgrade
Jan 1, 2005
-
Study of n-GaAs Corrosion Behavior by Electrochemical Methods and XPS
By Y. Huang
Corrosion of GaAs in aqueous electrolytes is a major limitation in implementing GaAs-based photoelectrochemical solar energy conversion systems, In this work, the corrosion behavior was investigated b
Jan 1, 2005
-
Short Tunnels with Shallow Cover
By David Smith
Construction of a new transportation link frequently requires crossing under an existing highway or railroad. Although traffic diversions may permit a cut and cover structure to be built, ‘zero impact
Jan 1, 2005
-
Modern History of Pipe Manufacture and Application
By H. J. McQueen
Large-scale industrial production of pipe began with longitudinal hot pressure welding of wrought iron by passage of skelp (narrow strip with beveled edges) through a die or bell that curled it about
Jan 1, 2005
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO
By Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Up-to-date Excavation, Support, and Lining Solutions Meet Timing Requirements for the First Two Tunnels of the 2006 Winter Olympic Games
By Georgios Kalamaras, Chiaia Dinu, Platania Paolo, Alessio Carlo, Giampiero Cirvegna, Claudio Santucci
The Project alignment initiates north of Pinerolo, along the State Road 23[S.S. 23] that is one of the principal arteries to the northwestern Alps where a number of Olympic events for the 2006 Winter
Jan 1, 2005
-
Planning of Air Cooling Systems in Mines and Tunnels
By J Walasiak
In the climate planning of mines and tunnelling with anticipated poor climatic conditions, and especially in case of longer working shifts, the main question is whether it can be reliably prevented th
Jan 1, 2005
-
Additional Test Results for Comparison of Penetration of Grout Made with Various Ultrafine Cement Products
By Shimi Tzobery, Jay Davenport, Raymond Henn, Sam Bandimere
Over the past several decades, the use of cement-based grouts using ultra fine cement as a replacement for portland cement has begun to gain acceptance as an alternative to chemical solution grouts us
Jan 1, 2005
-
Regulatory Control of Blast Vibration Levels in the UK
By Rob Farnfield
In the UK all new developments, including mines, quarries, tunnels, etc., are subject to a system of planning control. If the use of explosives is anticipated then such developments will attract a num
Jan 1, 2005
-
Swedish Standards for Ground Vibrations and Airblast
By Roger Holmberg, Donald Jonson
The Swedish Standard SS 460 48 66, “Vibration and shock - guidance levels for blasting induced vibration limits”, is based on more than 50 years of experience from blasting close to structures and tun
Jan 1, 2005
-
APM Tunnels at Phoenix Sky Harbor International Airport
By David M. Jurich, Randy J. Essex, Alex de Aboitiz
An Automated People Mover (APM) transit system is planned for the growing Phoenix Sky Harbor International Airport. The APM will improve passenger movements between the terminals, and provide a link t
Jan 1, 2005
-
Foundation Reuse: Overcoming Resistance
By Sara Anderson, Rachel Nicholls, Tim Chapman, Janice Windle
"In city center sites around the world, and in particular in London, foundation reuse is becoming increasingly widespread as the ground is filled with detritus from previous developments. This paper s
Jan 1, 2005
-
Public Relations Program on a Deep Tunnel Project in Atlanta
By Gregory B. Poole
As part of a $3.5 billion program to improve the antiquated waste water system in the city of Atlanta, the Nancy Creek Tunnel is being constructed across the northwest portion of the city. This tunnel
Jan 1, 2005
-
Seismic Design Measures for the Retrofit of the Claremont Tunnel
By Bill Cain, David F. Tsztoo, R. John Caulfield, D. Scott Kieffer
In 1994, the East Bay Municipal Utility District (EBMUD) commenced a system-wide Seismic Improvement Program to protect their facilities from catastrophic damage. A primary focus of this program has b
Jan 1, 2005
-
Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs
By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo
The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.
Jan 1, 2005