Planning and Fast Track Tunnel Design in Historical Downtown Charleston
By James McKelvey, Larry Drolet, Jason Swartz
INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved
Jan 1, 2005
-
Horizontal Geotechnical Investigations for Tunneling
By Nick Salisbury, Alan Howard, Scott Tunison
INTRODUCTION Geotechnical investigations for tunneling projects typically use vertical test borings and, to a lesser extent, angled borings. Horizontal drilling applications were often limited to
Jan 1, 2005
-
Ventilation and Cooling Design for Long Declines
Declines for both access and rock haulage are replacing shafts for mining relatively shallow deposits of down to 1000 m below surface. Where the orebody does not outcrop and where surface access may b
Jan 1, 2005
-
Rock Remediation Techniques For Mining And Quarry Operations
By Daniel Journeaux
Introduction Daniel Journeaux is President of Janod Incorporated. Janod is a family owned and operated company that has been working in the field of slope stabilization since 1970. Daniel has worke
Jan 1, 2005
-
The Design and Use of Steel Fiber Reinforced Concrete Segments
By Michael R. King
The application and use of steel fibre reinforced concrete in precast tunnel lining design is a growing trend due to its advantages in performance over plain concrete, and ease of manufacture compared
Jan 1, 2005
-
Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall Panels
There are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration
Jan 1, 2005
-
The Seymour Capilano Twin Tunnels Project, Vancouver, BC
By Don Phelps, Dean Brox, Peter Procter, Andy Saltis, Tom Morrison, Jeff Pringle
The Greater Vancouver Water District is currently constructing the Seymour-Capilano Water Filtration Project to enhance the quality of drinking water in the Vancouver metropolitan area. The Seymour-Ca
Jan 1, 2005
-
Mixed Face Tunnel Jacking with a Grillage
By J. E. Bernick, J. Davies
This paper describes the design and construction of a 22.86 m (75 ft) long jacked tunnel, which was successfully installed, despite difficult mixed face conditions at Metro-North’s Westport Station, i
Jan 1, 2005
-
A New Model for Characterizing the Cobble and Boulder Fraction for Soft Ground Tunneling
By Glen Frank, David R. Chapman
Determining the number of boulders and cobbles that will be encountered in the tunnel envelope is one of the most difficult problems confronting the geotechnical engineer in the design of tunnels in g
Jan 1, 2005
-
State-of-Art Grouting Remedy for Ground Improvement
By Faruk Oksuz, Cary Hirner, William A. Rochford
Grouting is a frequently utilized remedy in the planning and implementation of ground improvement and tunnel rehabilitation practice. The state-of-art grouting application used for Chicago’s McCook Re
Jan 1, 2005
-
Pre-Excavation Grouting Design Guidelines for Hard Rock Excavations
By S. Klein, D. Crouthamel, D. W. Farmer, S. H. Phillips
Groundwater inflows during construction pose one of the greatest risks to the successful completion of tunnel projects. Inflows can result in safety concerns, difficulty in mining and ground support,
Jan 1, 2005
-
Numerical Modeling of the Circular-Cut using Particle Flow Code
By Young-Dong Cho, Yonghun Jong, Dong-See Shim, Seokwon Jeon, Chung-In Lee
The most important operation in the tunnel blasting procedure is to create an opening in the face in order to develop more free surface in the rock mass. This operation is highly dependent on the cut
Jan 1, 2005
-
Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project
By Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna
The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially
Jan 1, 2005
-
The Computerized Design Program for Tunnel Blasting
By Jeon Jeon, Yong-Kun Choi, Chung-In Lee, Yong-Hun Jong, Hag-Soo Kim
In this study, a computer program to design tunnel blasting pattern has been developed. The program consists of two parts; one is for tunnel blasting pattern design and the other is for blasting model
Jan 1, 2005
-
The Nancy Creek Tunnel: Hard Rock Tunneling in Atlanta
By Jamie Bonner, Ray Hutton, Taro Nonaka
The Nancy Creek Tunnel is a deep tunnel, designed to store and convey wastewater by diverting flows from trunk sewers currently at or near capacity in the northwest of the City of Atlanta. The tunnel,
Jan 1, 2005
-
Grouting and Segmental Linings—Proceed with Caution
By Thomas Gregor, Brian Garrod
As the popularity of precast concrete segmental linings for tunnels is growing in North America, some problems related to grouting of, and near, these linings are starting to appear. The installat
Jan 1, 2005
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in London
By Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
CFA Secant Piling In California
By Philip Derbyshire, Dale J. Scheffler
"Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form
Jan 1, 2005
-
Construction of the Combined Sewage Overflow Tunnel for the City of Fall River
By Shemek Oginski
The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast
Jan 1, 2005
-
Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station Project
By Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister
Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align
Jan 1, 2005