Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Alptransit Lötschberg Project, Switzerland: High Performance Wet-Mix Sprayed Concrete During TBM Excavation of Two High-Speed Railway Tunnels
By Jens Classen, Thomas Kurth, Karl G. Holter
High performance sprayed concrete equipment installed on two 9.4 m diameter hard rock TBMs enabled a continuous sprayed concrete lining for the entire contour in both tunnels to be performed concurren
Jan 1, 2003
-
The Pannerdensch Kanaal Tunnel, Unique in Its Kind
By F. Dudouit, M. M. Mohkam, F. Renault
The Pannerdensch Kanaal Tunnel is part of Holland’s Betuweroute high speed freight railway project linking Rotterdam to inland of Europe. It comprises of twin tunnels, 1620 m long each, with 8.6 m inn
Jan 1, 2003
-
Design-Build: Elevating Partnering to a Higher Level
By Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring
The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value
Jan 1, 2003
-
Tailings based pipe-support systems
By C. E. Hales
In an effort to improve efficiencies and reduce costs, AngloGold has embarked on a process to develop and deliver consistent, high quality, tailings based support or construction products to stopes an
Jan 1, 2003
-
Jacked Tunnel Construction
"Boston’s Central Artery passes beneath nine active railroad tracks carrying commuter and Amtrak trains into South Station, the City's busiest rail terminal. These railroad operations had to remain in
Jan 1, 2003
-
South Interceptor Tunnel Construction Using a Lovat EPBM
By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales
This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja
Jan 1, 2003
-
Board of Consultants–A Requirement for Hard Rock Tunneling Projects
By Debbie Nakamura, Daniel Tempelis, John E. Shamma
The Metropolitan Water District of Southern California established a Board of Consultants to assist them in administering the design and construction of the Inland Feeder Program tunnels. The Board ac
Jan 1, 2003
-
The True Cost of Boulders in a Soft Ground Tunnel
By Hugh E. Cronin, Joseph J. Coluccio
The Columbia Slough Consolidation Conduit Project is a 12 ft. 0 in. inside diameter—15 ft. 4 in. excavated diameter tunnel, 8,300 lf. in length. The tunnel is divided in two parts a 4,460 lf. reach to
Jan 1, 2003
-
Analysis of the Controlled Deformation in Rock and Soil (A.DE.CO.-RS)–Tunneling Approach Performance of an Alternate Tunneling Approach in the Construction of 100 Kilometers of Tunnel for the Bologna to Florence High Speed Rail Line
By Silvano Morelli, Giovanna Cassani, Renzo Bindi, Antonio Nicola
More than 70 km of main line and service tunnels have been excavated to date for crossing the Apennines between Bologna and Florence. A new design and construction approach, known as Analysis of t
Jan 1, 2003
-
Design and construction of tunnel portals under difficult geotechnical conditions
By R. M. Spang
Abstract Between the German city of Dresden and the Czech capital Prague a 4-lane highway is under con-struction. At the outskirts of Dresden it will cross the narrow and deeply eroded Weißeritz V
Jan 1, 2003
-
The Design and Manufacture of the Arrowhead Tunnels Project Precast Segmental Lining
By Christopher Hebert, Michael R. King, Mehdi Ghazi
The Inland Feeder project is a critical component of Southern California’s water delivery system, relying on a strategic plan of water transfer and storage to enable the delivery of an additional 650
Jan 1, 2003
-
Transportation Tunnel Rehabilitation
By Paul M. Godlewski, Roberto J. Guardia
Hundreds of highway and rail transportation tunnels in North America have been rehabilitated in the last two decades. Tunnel rehabilitation is usually dictated by an owner’s need to extend the working
Jan 1, 2003
-
Effect of the strain rate and water stauration for the tensiles strength of rocks
By I. Matsunaga, K. Aoki, W. -j. Jung
Blasting is widely used in mining and basic construction because of its speed and economy to destroy the rocks. Blasting has the advantages of reduced excavation costs and shorted construction time wh
Jan 1, 2003
-
South Mountain Water Facilities–Reach 3B
By Mark R. Rybak, James Delmonte, Travis Hartman
The City of Phoenix, Arizona designed a 7.2 km (4.5 mi) long water transmission main from the South Mountain Reservoir to the Ahwatukee Foothills Reservoir to address the growing demand for drinking w
Jan 1, 2003
-
CERM3 and its contribution to providing sustainable research for the mining industry
By M. Veiga, L. Lavkulich, R. Pakalnis, M. Ghomshei, S. Baldwin, J. A. Meech
"On July 26, 2000, the Canada Foundation for Innovation announced an award of $1.3 M dollars for The Centre for Environmental Research in Minerals, Metals and Materials, CERM3, at The University of Br
Jan 1, 2003
-
Flexibility of NATM Shown During the Construction of the Egge Tunnel/Germany
By Josef Arnold, Norbert Fuegenschuh
The “Eggequerung” is an important part of the German Railway’s (Deutsche BahnAG) modernized Dortmund—Kassel line. The heart of this 13-km-long (8 miles)construction lot is the double-track Egge Tunnel
Jan 1, 2003
-
Shotcrete Lining Design: Factors of Influence
By Bruno Mattle, Max John
For tunnels with low overburden, the shotcrete lining is the main element of ground support, which is why shotcrete behavior is of prime importance. Following its application, shotcrete not only gains
Jan 1, 2003
-
Is Design Build for Chicago Area Tunnel in the Cards?–Cady Marsh Drainage Ditch and Tunnel/Pipeline Project, Griffith, Indiana
By Faruk Oksuz, Clay Haynes, David Egger
The United States Army Corps of Engineers (USACE) has committed to solve a major drainage problem in the suburban Chicago community of Griffith, Indiana. The Cady Marsh Ditch is currently undersized a
Jan 1, 2003
-
Dublin Port Tunnel–Construction of One of Europe’s Biggest Urban Road Tunnels
By Martin Knights, Geoff Featherstone, John Flanagan, David Lawrence
The proposed paper will address specific transport, engineering, environmental and community related issues concerning the current construction and future operation of Europe’s biggest urban road tunn
Jan 1, 2003
-
Tunnelling for the Channel Tunnel Rail Link
By David Court, Rab Brown
The paper discusses the work in progress on the construction of the extension of the High Speed Rail line from the Channel Tunnel into the centre of London UK known as the “Channel Tunnel Rail Link” (
Jan 1, 2003