Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
New Design for a 10 M Universal Double Shield TBM for Long Railway Tunnels in Critical and Varying Rock Conditions
By Wolfgang Güter, Paolo Romualdi
Current extensions of the European railway network require long TBM drives in the diameter range of 10 m under critical and varying rock conditions. In view of that and in particular for a 7 km lon
Jan 1, 2003
-
Geotechnical and Mechanical Interactions Using the Earth-Pressure Balanced Shield Technology in Difficult Mixed Face and Hard Rock Conditions
By Ulrich Maidl
The use of EPB shields in the so-called mixed face conditions has set new demands to man and machine in EPB shield tunneling. EPB shields were initially conceived to drive in the pressurized closed mo
Jan 1, 2003
-
Environmental Design for Growth: Garfield Interceptor Tunnel Project
By Victor M. Mercado, Jay B. Shah
Spalding DeDecker Associates, Inc. (SDA) designed a tunnel project that fulfilled the Sustainability Objectives of Social Equity, Environment, and Economics. The project translated the principles of S
Jan 1, 2003
-
Tunnel Alternatives for the Replacement of the Alaskan Way Viaduct
By Gordon T. Clark, Stephen H. Gleaton
This paper discusses the conceptual design of cut-and-cover tunnels currently being considered as one of the replacement options for the earthquake damaged, elevated double-deck highway and seawall bu
Jan 1, 2003
-
Ground Treatment for Tunnel Construction of Line 10 Extension to the Madrid Metro Under Difficult Ground Water Conditions
By Manuel Arnáiz, Pedro R. Sola, Rogelio Baudot, Manuel Herrera, Carlos S. Oteo
The aim of this paper is to describe and analyze the ground treatment performed between January and May 2002 in order to increase safety during excavation and reduce instability problems along 180 m o
Jan 1, 2003
-
Mining Using NATM Techniques in the Toukoshan Formation on C230 Taiwan High Speed Rail
By Gary B. Hemphill
The 345 km long Taiwan High Speed Rail Project will connect the island’s two most populated cities, Taipei and Kaohsiung. Kaohsiung is the world’s third busiest port. The 23 km of alignment on Cont
Jan 1, 2003
-
Ninth Line Trunk Sewer–Markham
By Tim Cleary, Steve Skelhorn
The 9th Line / 16th Ave tunnels are part of a $700 million expansion of the York Durham Sewage System, north of Toronto. The 15 km of tunnels presented many challenges, including glacial and post
Jan 1, 2003
-
The Penetration Rate Baseline Dilemma
By Hugh E. Cronin, Lok Home
THE PENETRATION RATE BASELINE DILEMMA The penetration rate is the instantaneous advance rate of a TBM in a rock tunnel. Normally expressed in feet per hour. The production rate is the penetration r
Jan 1, 2003
-
Prediction Versus Actual Response of Rocks in an Excavation of Underground Cavern at the Lam Ta Khong Pumped Storage Project
By Pratoomkhuan N. Lertsgoon
A large underground cavern with dimensions of 25m × 175m × 49m (W×L×H) was excavated in sandstone and siltstone to house 4 units of hydropower generator and was completed in 2000. In feasibility study
Jan 1, 2003
-
The Installation of Steel Linings with Low-Density Cellular Concrete Backfill on the Riverside Badlands Tunnel in Southern California
By Alex Lowson, Dan Tempelis
The Riverside Badlands Tunnel segment of the Metropolitan Water District of Southern California’s Inland Feeder Project, was lined with a segmented concrete primary lining and a welded steel final lin
Jan 1, 2003
-
73rd Street TARP Relocation McCook Cup Reservoir: Contract 97-156-2H
By Brent Duncan, Doug Harding, Bob Stier
The 73rd Street Tunnel Project is part of “The Tunnel and Reservoir Plan” (TARP)also known as the Deep Tunnel Project, and is located in the Village of Bedford Park, County of McCook, State of Illinoi
Jan 1, 2003
-
North Airfield Drainage Improvement at Chicago-O’Hare International Airport: Soil Stabilization Using Jet Grouting
By Martin G. Taube, Dwayne A. Lewis
Drainage improvements at O’Hare International Airport, Chicago, IL included the installation of a drainage and storm water system to control the over?ow from nearby Willow Higgins Creek. This involved
Jan 1, 2003
-
Design and Construction of London Cable Tunnels
By Michael Francis, Chris Darton
More than 55 km of tunnels have been constructed by TBM in the last 12 years to refurbish and upgrade the high voltage cable network in London. These include a tunnel of 20km length using EPBM machine
Jan 1, 2003
-
Numerical Modeling of Tunnel-Induced Ground Settlements and Their Effects on Pile Supported Structures: The Case of Portland’s West Side CSO Tunnel
By Matthew E. Fowler, Jean Habimana, Roy F. Cook
The West Side CSO Tunnel, Pump Station & Pipeline Project is currently beginning construction along the downtown waterfront of Portland, Oregon. This4.3 meter diameter, 5,500 meter-long soft ground tu
Jan 1, 2003
-
Wanjiazhai Yellow River Diversion–Hard Rock TBM Challenging Soil
By Jihong Xue, Jialin Wang, Della Valle Nicola
Experience of Hard Rock TBM excavating soil in Wanjiazhai Yellow River Diversion Project tells us that selection of Hard Rock TBM to excavate soil in case that rock dominates overall length of tunnel,
Jan 1, 2003
-
Case History of the Orme Street Combined Trunk Relief Sewer Phase III
By Kenneth Denton, Michael Cutts, Andrew Bursey, Eric Eisold
Phase III of the Orme Street Combined Trunk Relief Sewer project connects two existing 2.13 m diameter combined sewers to a new 3.66 m diameter relief sewer at 7locations along a 970 m alignment in do
Jan 1, 2003
-
Novel, Fully-Automated German Tunneling Method
By Thiemo Hagedorn, Gerhard Weissbach, Ralph Bergmann, Wilhelm J. Kogelmann
The objective of this unique method is to multiply the advance rate of conventional tunneling while improving both ground control and the safety of the crew. The high advance rate is achieved by concu
Jan 1, 2003
-
The Innovation Indicator In Drilling, Mining And Tunneling
By C. Tompouloglou
The innovation in a technological field is reflected by the Research and Development (R & D) activity in it. It is explained why patent literature is a more reliable indicator than non-patent literatu
Jan 1, 2003
-
Safety in Tunnelling and Underground Construction ù An Australian Perspective
By N J. Betts
This paper aims to build on the strong emphasis that was placed on safety in the Sydney AITES-ITA Congress in March 2002. It will do this by comparing safety records from some major tunnelling project
Jan 1, 2003
-
FLAMDOCS–A Fire Load Application Method for the Design of Concrete Structures EU, USA and Other Countries Patent Pending
By Johannes Wageneder
As a reaction to the fire accidents in tunnels in Europe Designers nowadays have to demonstrate the integrity of underground structures such as metro systems, railway and road tunnels in case of fire
Jan 1, 2003