Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Southfield Sewer Investigation, Replacement and Repair: A Case History
By Harry R. Price, Bharat Doshi, Awni Qaqish, Abdul-Ghani Mekkaoui, Thaddeus Znoy, Ramesh Shukla
In 1992, a detailed inspection of the Southfield Sewer revealed a reach of approximately 0.8 kilometers in length, located directly below the freeway lanes, which was severely distressed. Failure of t
Jan 1, 2001
-
Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box Jacking
By Peter van Dijk, Gary Almeraris, Philip Rice
This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A
Jan 1, 2001
-
Controlled Blasting Methods for Excavation of Rock and Concrete in Critical Locations of Tunnels and Shafts
By Gordon F. Revey
In underground construction and mining work, situations occasionally occur where hard rock or concrete must be excavated at locations near critical structures or utilities. Fearing damage from blastin
Jan 1, 2001
-
The Planning, Design and Construction of the Tuas Cable Tunnel and Future Power Transmission Cable Tunnels in Singapore
By G. D. Mainwaring, Weng L. W, Lam Y. K.
The first power transmission cable tunnel in Singapore was the 2.6km long undersea tunnel between Pulau Seraya and mainland Singapore, constructed in the1980s. Ten years later, similar concepts were u
Jan 1, 2001
-
Journal: Junction Chamber Blasting November 22,1999
By Edward Walter
Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m
Jan 1, 2001
-
M5 East Tunnels: A Flat Roofed, Bolt and Shotcrete-Lined Highway
By Isabelle Lamb, Manfred K. Lechner, Daniel N. Adams
Sydney Australia’s M5 East Motorway connects southwestern suburbs to the airport. Central to the project are twin 3.8 km roadway tunnels which are mostly driven through rock. In order to come up with
Jan 1, 2001
-
Northside Storage Tunnel Project, Sydney: Tunnelling and Groundwater Control Beneath the Middle Harbour
By R. A. Gee, G. B. Ashton, S. T. Warren, P. N. Groves
Northside Storage Tunnel provides 500 megalitres (Ml) (130 million gallons) of storage capacity to capture stormwater/sewage overflows into Sydney Harbour. The6.6 m diameter TBM driven tunnel traverse
Jan 1, 2001
-
Dewatering for the Lenox Avenue Subway Reconstruction Project
By Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin
The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr
Jan 1, 2001
-
Application of Geophysical and Geotechnical Technologies to Major Tunnels in Sydney, Australia
By Robert J. Whiteley, Colin Parker
Two major tunnel projects with a combined value of about $US700 million have been recently completed in Sydney using both soft ground and hard rock Tunnel Boring Machines. The first of these and t
Jan 1, 2001
-
Tunnel Construction in Difficult Site Condition for the Longest Highway Tunnel in Himalayan Ranges—India
By Alok Garg, Rajeev Kumar Dayal
The Himalayan ranges have complex geological formation induced with locked up tectonic stresses and squeezing ground conditions. High overburden, steep slopes, perennial snow, and forest cover restric
Jan 1, 2001
-
Extruded Concrete Lining—The Future Lining Technology for Industrialized Tunnelling
By Siegmund Babendererde, Jan O. Babendererde
Extruded Concrete Lining combines technological and financial advantages. The tunnel lining is reliably embedded in the surrounding ground as the fluid concrete is extruded at constant pressure direct
Jan 1, 2001
-
A Tunnel Boring Machine at the South Pole
By Michael R. Walsh, John H. Wright, Eivind B. Jensen
A tunnel boring machine (TBM) was designed and built at the Cold Regions Research and Engineering Laboratory in 1992 for use in Antarctica. The TBM system was tested at the South Pole where a 120-m lo
Jan 1, 2001
-
San Diego’s Tunnels: A Historical Perspective
By Rick Wright, Gregory L. Raines
San Diego’s need to access underground space has dictated a long history of tunnel construction. The subsequent need for water, coupled with San Diego’s natural attractiveness, has led to significant
Jan 1, 2001
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project
By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001
-
Completion of H-3 Highway Tunnel
By Jan L. Reichelderfer, Thomas L. Richardson
Completion of the H-3 Highway Tunnel Project was a critical element in opening this award winning project. The exploratory tunnel was completed as a maintenance tunnel and included difficult shafts ex
Jan 1, 2001
-
Engineering Tools for Design, Analysis and Information Management Applied to Underground Drilling and Blasting
By D La Rosa, G Power, K Riihioja
In underground mining, the often unpredictable variability in ground conditions may lead to the application of suboptimal drilling and blasting patterns, resulting in poor performance. Experience and
Jan 1, 2001
-
Predicting Groundwater Inflow into Hard-Rock Tunnels: Estimating the High-End of the Permeability Distribution
By John H. Raymer
The accuracy of inflow estimates depends largely on how well permeability is characterized. Permeability is best evaluated as a statistical distribution. For the Chattahoochee Tunnel, this distributio
Jan 1, 2001
-
Ambitious Endeavors in Mechanized Shaft Construction: A Case History of Two Mine Shaft Projects in Australia
By John Zeni
In Australia during the 1990s, Zeni Drilling took on several demanding shaft boring contracts. This paper describes the safety, operational, technical and environmental advantages derived through the
Jan 1, 2001
-
Tunneling for the Chaloem Ratchamongkhon Line in Bangkok
By S. Suwansawat, D. J. Maconochie, C. C. Chang
This paper describes the overall delivery of the tunneling for the Mass Rapid Transit Authority of Thailand’s Chaloem Ratchamongkhon Line in Bangkok and the constraints provided by the alignment. Eigh
Jan 1, 2001
-
The Fourth Tube of the Elbe-Tunnel—Built by the World’s Largest Soft Ground Tunnelling Machine
By Claus Becker
The new, 2.600 m long pipe under the river Elbe in Hamburg/Germany required for 2 traffic lanes, emergency lane and space for utilities a boring diameter of 14,20 m(46,6 ft). According the geology (gl
Jan 1, 2001