Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Method Selection for Large-Scale Underground Mining

    As has been the case since the early Phoenician traders, the minerals used by modern man come from deposits scattered around the globe. The price received is more and more being set by worldwide suppl

    Jan 1, 2000

  • AUSIMM
    Sublevel Cave Drop Down Strategy at Perseverance Mine, Leinster Nickel Operations

    By P A. Jenkins, I W. O Jones

    WMC has mined the Perseverance disseminated orebody exclusively by SLC (sublevel cave) methods. Deteriorating ground conditions in the vicinity of an orebody inflection forced a re-evaluation of futur

    Jan 1, 2000

  • SME
    Computer Modeling For Improved Production Of Mechanical Excavators

    By L. Ozdemir, M. Cigla

    This paper presents and discusses some of the computer models developed and currently used at the Earth Mechanics Institute (EMI) of the Colorado School of Mines (CSM). These include the performance m

    Jan 1, 2000

  • CIM
    Hazards associated with the mining of diamondiferous pipes

    "With the globalization of the mining industry, many companies are now seeking to invest in underground diamond mines, with the purchase of small diamond pipes being seen as particularly attractive. H

    Jan 1, 2000

  • DFI
    Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building ? Synopsis

    By Martin J. Kenwright

    Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi

    Jan 1, 2000

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • AUSIMM
    Considerations for Design of Production Level Drawpoint Layouts for a Deep Block Cave

    By P Bartlett, K Naidoo

    Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively

    Jan 1, 2000

  • AUSIMM
    Examination of Bit Wear in Rock Drilling Through Wavelet Analysis

    Laboratory tests were conducted to study the effects of thrust or pull-down force and rotary speed on the vibration signatures of a particular drill in a known rock type, and to determine how the vibr

    Jan 1, 2000

  • AUSIMM
    The Expanding Role of Mine Geophysics

    Just as geophysics, in the form of 3D seismic and wireline logging, plays a key role in petroleum reservoir management, so too will geophysics play an important role in mining of coal, metals, and min

    Jan 1, 2000

  • DFI
    Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis

    By N. S. Yet

    This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C

    Jan 1, 2000

  • SAIMM
    Practical Aspects Of The Ventilation Of High-Speed Developing Tunnels In Hot Working Environments

    The excavation of ramps and tunnels often requires high-speed development with (or without) the use of high-energy mining equipment such as loaders, dump trucks, TBMs and roadheaders. This high-spee

    Jan 1, 2000

  • CIM
    Toward a unified and digital communication system for underground mines

    By P. -M. Tardif, S. Outalha, R. Le

    "This paper proposes a new direction to implement an underground mine communication system. It presents actual underground communication systems and discusses their technological limits. A new system

    Jan 1, 2000

  • ISEE
    AEL Ring 2000

    While ring-blasting techniques offer substantial benefits, there are intrinsic problems that are exacerbated when large blocks of ore are mined in attempts to improve the production economics. These p

    Jan 1, 2000

  • SME
    Waihi Gold Mine Overland Conveyor Design

    By David Morrison

    On the Corramandel Peninsula of New Zealand, the Waihi Gold Mine has undergone a major redevelopment. The upgrade included the construction of two very large overland belt conveyors, both rated for a

    Jan 1, 2000

  • SME
    MINExpo 2000 Exhibitors Display Their Goods & Services

    The following is a summary of some of the companies that were exhibiting their products and services at MINExpo INTERNATIONAL 2000. Atlas Copco develops, manufactures and markets rock drilling too

    Jan 1, 2000

  • CIM
    Technologies required for safe and profitable deep level gold mining, South Africa

    By P. H. Willis

    Since the 14th CMMI conference, held in Edinburgh in 1990, at which a paper was presented by the author (Willis, 1990) reviewing the role of integrating new technology as a survival strategy for South

    Jan 1, 2000

  • CIM
    The Pierina Project: From Acquisition to Production

    By Barrick Pierina, John Frostiak, Igor Gonzales, Kenneth G. Thomas, Ken Manning

    "1.0 SummaryThe Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of ac

    Jan 1, 2000

  • SME
    Technology News – Atlas Copco Wagner Announces Improved 10-t LHD

    Atlas Copco Wagner launched its ST1010 Scooptram load haul dumper. The ST1010 replaces the company’s Wagner ST-1000 Scooptram. The improvements to the Wagner ST1010 include increased reliability, ea

    Jan 1, 2000

  • AUSIMM
    Ore Characterisation for Mine to Mill Fragmentation

    By A Scott, S Kanchibotla, J Segui

    The æMine to MillÆ concept is not new. In fact, it is the underlying objective of every mine. Unfortunately, in many operations the management structure and reporting systems have created independent

    Jan 1, 2000

  • AUSIMM
    Block Cave Undercutting - Aims, Strategies, Methods and Management

    Many block caving operations experience difficulties during undercutting, resulting in draw horizon damage, production loss and extensive drift repairs for the life of the block cave. This paper deals

    Jan 1, 2000