Microsilica 600 - A Natural Amorphous Silica
By K Thorpe
Amorphous silica deposits have been identified at Tikitere and Taheke near Rotorua. Two areas at Tikitere have been surface sampled and drilled to establish a resource of amorphous silica in excess of
Jan 1, 1999
-
Improved Strategies for TBM Performance Prediction and Project Management
By Priscilla P. Nelson, Yousof Abd Al-Jalil, Christopher Laughton
Prediction of excavation rates is a critical element in the pre-planning of a tunnel boring machine (TBM) project. A realistic evaluation of performance expectations is needed that reflects both the k
Jan 1, 1999
-
Bulk Emulsion Explosives at the Sydney LPG Cavern - A First in Australian Tunnelling
The Elgas Underground Storage Facility at Port Botany, Sydney, is the first purpose-built cavern of its kind in Australia and provides large capacity, safe and environmentally benign storage of Liquef
Jan 1, 1999
-
Extending the U5 in Berlin via a Shield Driven Tunnel
By F Anthes, U Barow
Two tunnels are being bored using a æHydroshieldÆ in section 3.1 of the extension of the Underground railway line 5. At the end of the two tunnels, directly in front of the Hotel Adlon, the shields ca
Jan 1, 1999
-
Olympic Dam Operation - An Overview of Underground Design and Planning
Olympic Dam Operation is located in the Stuart Shelf Geological Province approximately 520 km north-north-west of Adelaide in South Australia. It is estimated to be one of the worldÆs top five copper
Jan 1, 1999
-
Blasting a Cavern Using Bulk Emulsion Explosives
The Elgas Underground Storage Facility at Port Botany, Sydney, is the first purpose-built cavern of its kind in Australia and allows large capacity, safe and environmentally benign storage of Liquefie
Jan 1, 1999
-
Crafers Highway Tunnels, Adelaide, SA
By G Brewster
The Eagle on the Hill tunnels form part of an upgrade of Mt Barker Road, 15 km to the southeast of Adelaide. The upgrade significantly improves safety and reduces delays on this major road, which wind
Jan 1, 1999
-
Ground Freezing for the Construction of Deep Shafts (cd62e630-bbbe-4bb8-bfbe-16b05dab86f1)
By James A. Morrison, Stephane Carayol, Paul H. Madsen
The Rio Piedras Alignment Section 7 of the Tren Urbano is currently being constructed beneath a historic commercial section of San Juan. Different portions of the section are being constructed using o
Jan 1, 1999
-
Excavation Technique and Support in Squeezing Ground Conditions for a Highway Tunnel in India
By A Garg
Squeezing can occur both in hard rock and in jointed rock mass as a result of over stressing. It is related to time dependent shearing, ie shear creep and is associated with the volumetric expansion (
Jan 1, 1999
-
Recent Developments in Site Investigation and Testing for Hard Rock TBM Projects
By Levent Ozdemir, Bjorn Nilsen
For several recent TBM tunnel projects, unexpected ground conditions have been encountered, causing extra cost, considerable delay, and in some cases major claims. Undoubtedly, insufficient and/or irr
Jan 1, 1999
-
Prince Colliery underground rope haulage system
By John T. Ling
"This paper describes the operation of a rope haulage used as the main system of transportation in an underground coal mine. Prince Colliery, which is operated by the Cape Breton Development Corporati
Jan 1, 1999
-
Saving Your Back(s) (Reducing Overbreak and Perimeter Damage Through the Safe and Cost-Effective Application of Drill and Blast)
Over the last 15 years working in the mining, construction and extractive industries, one of the areas that has always concerned and at the same time drawn the author to it is the application of drill
Jan 1, 1999
-
The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future. (6f8f1933-2bde-4a96-8f8f-131aa6e7971f)
By W. G. K. Fleming
The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and
Jan 1, 1999
-
In-Depth Survey Report: Control Technology For Environmental Enclosures - The Effect Of Wind Speed Upon Aerosol Penetration Into An Enclosure At Clean Air Filter, Defiance, Iowa
By Edward Thimons, William A. Hertbrink
The effect of wind speed upon aerosol penetration into an idealized enclosure was studied The idealized enclosure was a painted plywood box that was 1 2X1 2 XI meters in volume Two fans supplied 1 7 m
Jan 1, 1999
-
The Cadia Gold Copper Project Exploration To Start Up
The Cadia Mine is located 25kms South West of Orange in the central west of New South Wales (NSW), Australia (Figure 1). Orange is a major regional centre with a population of 35,000 people. Cadia has
Jan 1, 1999
-
Drill and Blast Operations and Water Control Measures atLake Mead Intake No. 2
By Richard W. Kimball, Richard F. Coon
This paper describes drill and blast excavation and groundwater control measures at the Lake Mead Intake No. 2 project. The construction includes a deep access shaft, intake shaft, surge chamber, fore
Jan 1, 1999
-
Upper Rouge Combined Sewage Overflow Storage and Treatment Tunnel
By F. J. Klingler, K. M. Swaffar, M. M. Rabbaig
The Detroit Water and Sewerage Department has undertaken a $1.2 billion effort to capture and treat combined sewage overflows from various outfalls along the Detroit and Rouge Rivers in Detroit, Michi
Jan 1, 1999
-
Backfill --Whatever It Takes (fcae3bd4-481a-4110-9923-93fcb6b0528e)
By D. Kump
The Bullfrog Mine is an underground gold mine that uses the underhand-cut-and-fill mining method. The portal was established on June 18, 1991. Mining is expected to be completed by the summer of 1999.
Jan 1, 1999
-
Tunnelling Projects in Singapore
By A J. Burchell
The introduction reviews the tunnelling carried out in Singapore since the early 1980s. Between 1983 and 1990, Phases 1 and 2 of the mass rapid transit system were constructed. These included some 20
Jan 1, 1999
-
Tarp North Branch Tunnel Leg – A Case History
By Joseph P. Sobanski, Michael P. Bruen
The North Branch tunnel segment of the Tunnel and Reservoir Plan Mainstream System consists of 14,075 m (45,885 ft) of 9.2 m (30.2 ft) finished diameter and985 m (3,232 ft) of 2.5 m (8.25 ft) finished
Jan 1, 1999