    Twin TBM with Four Cutters for Subway Station (RoppongiStation in the Tokyo Metro Line 12)

    By Susumu Uchiyama

    This machine was manufactured for excavation of the Roppongi station of the Tokyo Metro Line 12. This machine can excavate both the platform and the rail track at the same time in locations where t

    Jan 1, 1999

  • SME
    Numerical Simulation Of Yield Pillar Behavior With Creep Material Model (c63f327c-77cb-4179-b8f9-35b63de9bec4)

    By B. Pesic

    Northwest Alloys, a wholly owned subsidiary of Alcoa, produces magnesium from dolomite by reduction with ferro silicon and aluminum. This process produces alkaline by-products in quantities that allow

    Jan 1, 1999

  • AUSIMM
    Underground Mine Radio Automation Systems

    By S Munn

    Today, it can be said that the majority of mines utilise communications equipment in one form or another. Either for communications between staff making their day-to-day operations more efficient, or

    Jan 1, 1999

  • AUSIMM
    Design and Construction of the Yarra River Crossing

    By R Blair

    The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru

    Jan 1, 1999

  • AUSIMM
    Making Design and Construction Work

    By S Porter

    The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th

    Jan 1, 1999

  • AUSIMM
    Design of the Melbourne City Link Tunnels

    By S Porter, R Woodall, N Weeks

    Nelsen, Porter and Wilson (1996) provided some preliminary concepts for the design of the Melbourne City Link tunnels. At that time, the City Link project was in the early design phase whereas now it

    Jan 1, 1999

  • SME
    Groundwater Control for Shaft and Tunnel Construction inSoft Ground at West Leg Interceptor Contracts 1R and 2,Cleveland, Ohio

    By Robert J. Auber, Thomas R. Scotese

    The West Leg Interceptor is part of a new sanitary sewer system in the southwest suburbs of Cleveland. The first two construction contracts were excavated in glacial soils varying from hard tills to p

    Jan 1, 1999

  • SME
    Ground Freezing for the Construction of Deep Shafts

    By Paul C. Schmall, Arthur B. Corwin, Hugh S. Lacy, Derek Maishman

    For reasons of hydraulic design and constructability, water supply tunnel systems are often located relatively deep, in competent rock. Where the rock lies below a thick cover of water bearing soils,

    Jan 1, 1999

  • SME
    Empirical Estimates of TBM Performance in Hard Rock

    By Garry W. Stevenson

    Data from many case histories reporting tunnel boring machine penetration rates in rock with unconfined compressive strengths greater than 70 MPa (10,000psi) are summarized. The case history data are

    Jan 1, 1999

  • SME
    Using Passive Treatment Systems For Mine Closure A Good Approach Or A Risky Alternative (dbc655b4-4457-479a-a418-54cc78cbb8f3)

    By P. Eger

    In 1991, LTV Steel Mining Company decided to close an open pit taconite mine in northeastern Minnesota, using a passive treatment approach consisting of limiting infiltration into the stockpiles and w

    Jan 1, 1999

  • SME
    Bradshaw Section 5A Interceptor, Sacramento, California

    By Patrick Doig, Ross Webb

    The Bradshaw Section 5A Interceptor involves the construction of two miles of 108-inch, finished diameter tunnel in dry soils. Excavation is generally by Lovat TBM with ribs and lagging support. The t

    Jan 1, 1999

  • AUSIMM
    Tunnelling in Hong Kong Towards the Millennium

    Hong Kong continues to display a remarkable enthusiasm for undertaking ambitious tunnelling schemes despite apparent recessions in the Asian economy. This paper provides an outline of tunnel projects

    Jan 1, 1999

  • AUSIMM
    The North Western Sewer Tunnel Project - Section 3

    By R Milton, D Hake, H Sprague

    The North Western Sewer tunnel extends over 11.5 km in the North Western suburbs of Melbourne.The $253 million tunnel project provides a critical link in the Melbourne Sewer Network. The existing sewe

    Jan 1, 1999

  • SME
    The Narragansett Bay Commission’s Deep Tunnel CSO Project

    By Wern-ping Chen, Joseph Pratt, Thomas G. Brueckner, Tracy K. Lundin

    To address and mitigate discharges from combined sewer overflows in the Providence, Rhode Island area, the Narragansett Bay Commission completed a comprehensive Combined Sewer Overflow (CSO) Facilitie

    Jan 1, 1999

  • SME
    Lightweight Cellular Grout Applications in Tunneling

    By D. A. Day, H. L. Marsh, P. J. Stephens, C. A. Wiggins

    Lightweight cellular grout backfill behind pipe-in-tunnel has been gaining increased acceptance in the tunneling industry and has proved to be both practical and economical. Two successfully construct

    Jan 1, 1999

  • SME
    Sheppard Subway Twin Tunnels Project

    By Murray Malott

    The Sheppard Subway extension is currently being constructed in Toronto, Canada for the Toronto Transit Commission (TTC). McNally International Inc., in a joint venture with PCL and the Foundation Com

    Jan 1, 1999

  • SME
    Steel-Fiber-Reinforced-Shotcrete for Tunnels: An International Update

    By Don Rose

    Steel-fiber-reinforced-shotcrete (SFRS) methods of testing and the wording of specifications vary from country to country. In the USA ASTM C1018 is widely used. The Canadians have taken a close lo

    Jan 1, 1999

  • AUSIMM
    Innovative Investigation Techniques used for Geotechnical Modelling of the Northside Storage Tunnel Project, Sydney

    By B Whiteley, B Gee

    The Northside Storage Tunnel is a TBM driven rock tunnel system designed to collect and store sewage from four major storm overflow points along the existing Northern Suburbs Ocean Outfall Sewer. At p

    Jan 1, 1999

  • AUSIMM
    Construction of the Molineux Facility Underground LPG Storage Cavern

    The underground storage of LPG and other hydrocarbons is in current commercial use in Northern Hemisphere countries in Europe, Asia and the USA.Elgas Pty Ltd, a 50 per cent joint venture between AGL a

    Jan 1, 1999

  • AUSIMM
    The Race to Finish - From Design to Completion - 5 Km of Three Lane Road Tunnel in Three Years

    By G Munro

    he Melbourne City Link project will complete a missing link between two existing major freeways in the Melbourne road network, providing a much needed bypass of the Central Business District for throu

    Jan 1, 1999