Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Henderson Coarse Ore Conveying System
By Greg Barfoot, Kurt Keskimaki
The Henderson Mine is located approximately 50 miles west of Denver, Colorado. A project is underway to replace the existing rail system which transports molybdenum ore 15 miles from the mine to the m
Jan 1, 1998
-
Development of the Remote Controlled Blasting System for Tunnel Construction
By Minoru Kawamura, Yukio Kato, Yoshikazu Hirosaki, Satoru Suzuki
A wireless blasting system for tunnel construction which consists of a loop antenna, oscillator and blaster, has been developed. The basic technology of this method had been studied in the 1970s to de
Jan 1, 1998
-
Where Have All the Processing Plants Gone?
By Joel Lenz, Warren Hood, Jackson Jenkins
Whole ore or other process streams are being transported from mines to remote processing facilities for multiple reasons, such as improved project economics, maximum utilization of capital, and minimi
Jan 1, 1998
-
Mechanics of Rock/Tool Interaction in Disc Rock Cutting
By M Hood, X S. L, W J. T Daniel, H Gurgenci
It is believed that disc cutter shape affects rock fracture and therefore cutter performance and cutter life. However, the current generation of disc cutters is made of hardened steel and these cutter
Jan 1, 1998
-
Design And Construction Of The Noranda Converter At The Borne Smelter
By Michel Boisvert
Noranda Metallurgy is presently completing construction of the new Noranda Converter (NCV) at its Home Smelter in Rouyn-Noranda. This capital investment of CDN$56M is the continuation of the Emissions
Jan 1, 1998
-
Designing and Operating Backfill Systems on a South African Gold Mine
For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,
Jan 1, 1998
-
Mining Induced Subsidence Assessments at Jeffrey Mine, Quebec
By Dennis C. Martin
Assessment of the potential for mining induced subsidence and determination of ultimate design requirements for a mining operation should be based on a number of assessment approaches. Although the ro
Jan 1, 1998
-
The Effects of Cutting Tool Design on Respirable Dust Generation
By A. Wahib Khair
"This article first describes the impact of respirable dust on the health of miners in underground coal mines in the United States of America. Second, it identifies the major sources of dust generatio
Jan 1, 1998
-
La Granja Copper Mine Project
By Jorge Lanza
SUMMARY La Granja copper deposit, in terms of volume, is among the five largest deposits in the world and represents reserves of three thousand million tones. The field consists of a 40 m. thick la
Jan 1, 1998
-
Hydraulic Pulse Generator For Nonexplosive Excavation
By J. J. Kollé
A compressed-water hydraulic pulse generator (HPG) for nonexplosive blasting of rock and concrete is described. Energy is stored in the HPG by compressing water to ultrahigh pressure. A large, fast-op
Jan 1, 1998
-
A Safe Way to Reduce Support Costs and Improve Safety and Productivity
By Seedsman R
The fundamentals concepts of roof support are similar between coal mining, metal mining and tunnelling and yet there are different design approaches, different hardware, and different levels of site i
Jan 1, 1998
-
Reducing Exposures to Respirable Coal Mine Dust: Engineering Solutions
By R. V. Ramani
"In this paper, the current status of respirable dust control in coal mine atmospheres is presented. The advancements in the engineering control of dust generation and entrainment, and of reducing the
Jan 1, 1998
-
Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds
The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise
Jan 1, 1998
-
Blasting 1.8 million m3 Rock in One Shot: The Blast Design and Environmental Damage Control
By Tianrui Xu, Chaohong Liu, Bangqing Ding
The authors were responsible for a series of large scale multiple chamber charge blasts conducted in the granite mountain area for making construction space on the southeast sea coast in China during
Jan 1, 1998
-
Evaluation Of The Face Ventilation Systems For Extended Cuts With Remotely Operated Mining Machines Using Three-Dimensional Numerical Simulations
The purpose of this paper is to demonstrate how the Computational Fluid Dynamics (CFD) technique can be an attractive approach to evaluate the performance of face ventilation systems. To present the c
Jan 1, 1998
-
Cyanide: Just The Facts
By Courtney A. Young
Cyanide is a fast-acting, highly toxic substance but, at the same time, is deemed essential for sustaining life as well 'as our standard of living. In this manuscript, the facts about cyanide are
Jan 1, 1998
-
Design And Operation Of A Novel Gas Cooler For Refimet Copper Smelter, La Negra, Chile
By Tim J. A. Smith
Fundicion Refimet S.A. has operated a custom copper smelter at La Negra, near Antofagasta in northern Chile since 1993. From an initial operation based on Reverb smelting and Peirce-Smith, converting,
Jan 1, 1998
-
The Trekelano Group of Mines - A Brief History
The old Trekelano mining area is situated in the Cloncurry Gold and Mineral Field 14 km east-south-east of Duchess. It connected with the main Cloncurry-Dajarra railway line by a private line from Jue
Jan 1, 1998
-
Application Of The Coal Mine Roof Rating (CMRR) To Extended Cuts
Since it was first introduced, the Coal Mine Roof Rating (CMRR) has been widely accepted as a tool for geologic characterization and mine planning. This paper discusses the application of the CMRR to
Jan 1, 1998
-