  • SME
    Structural Stress And Concentration Of Mining-Induced Seismicity (a32e4e24-05bb-464a-8e35-4ebd00d52b3c)

    By J. K. Whyatt

    In situ stress on the scale of a tunnel or mine may be distorted by geologic structures. The resulting variations of in situ stress have a direct bearing on the potential for mining-induced seismicity

    Jan 1, 1995

  • SME
    Case Histories of Tunnel Portal Failures and Lessons Learned

    By Jon Y. Kaneshiro, Blake D. Rothfuss, Gregory E. Korbin

    A critical aspect of the planning, investigation, design, and construction of an underground excavation project is the portal. The portal is the primary access through which most if not all tunnel con

    Jan 1, 1995

  • SME
    Re-Entrainment Of Coal Dust Particles: Wind Tunnel And In-Mine Studies (58089787-9484-4f12-b082-1f7f0e4fae1f)

    By S. Shankar

    Available literature on the effect of re-entrainment on overall airborne dust concentration in mine airways or the fundamental mechanisms of coal dust re-entrainment in mine atmosphere is scant. There

    Jan 1, 1995

  • AUSIMM
    Determination of Blast Induced Damaged Zones in Pillars by Seismic Imaging

    By Theophili CN, Kapenis AP

    Seismic tomographic imaging has been applied to determine the blast induced damage zones in bauxite pillars in underground mining. At the retreating stage, when pillar dimensions are reduced from 8

    Jan 1, 1995

  • NIOSH
    IC 9422 Hazard Recognition In Mining: A Psychological Perspective

    By Charles W. Perdue

    This U.S. Bureau of Mines report considers, from a psychological perspective, the perceptual process by which miners recognize and respond to mining hazards. It proposes that if the hazard recognition

    Jan 1, 1995

  • AUSIMM
    Use of Pre-splitting Technique as an Alternative Approach to Cost Optimisation in Tunnel Excavation

    By Guvenir HA

    This paper summarises a cost optimisation procedure by minimising the total drill metres and the overbreak that occurs in tunnel excavation in medium strength rock (uniaxial compressive strength

    Jan 1, 1995

  • SME
    Construction of the Cowles Mountain Tunnel

    By George K. Mitteer

    The Cowles Mountain Tunnel was driven 2,073 m (6,800 ft) with a 3.43 m (11 ft 3 in) shuffle shoe TBM, for the San Diego County Water Authority, through extremely high strength granitic rock in the Cit

    Jan 1, 1995

  • AUSIMM
    A New Technique for Predicting Rock Fragmentation in Blasting

    The explosion of a charge in a drillhole sets the surrounding rock mass into vibrating stress wave motion. Except in the immediate vicinity of the drillhole, the dynamic stresses associated with thi

    Jan 1, 1995

  • SAIMM
    Technical Note: Safety And Cost Implications In The Spacing Of Support

    By W. O. Ortlepp

    This note considers the most fundamental concepts of support design for deep underground openings and discusses them briefly in the context of tabular stoping and deep hard-rock tunnelling. It concl

    Jan 1, 1995

  • SME
    Handling of Heavily Alternating Water Inflow in the Shield Driven "Mangfallstollen"

    By Michael Beyer

    Following the last Cholera Epidemic in 1872, resulting in approximately 400 deaths, the City Council of Munich decided to re¬place the former water supply system within the city limits by tapping new

    Jan 1, 1995

  • SME
    Application of PCF Rock Excavation to the Controlled Excavation of Cross Cuts and Galleries

    By Chapman Young, Donald E. McCarthy

    Many hard rock tunneling projects, where the majority of excavation can be accomplished with TBMs, will still require considerable specialized excavation which can not be done with a TBM. This seconda

    Jan 1, 1995

  • SME
    Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection

    By P. Marcheselli, Jean-Yves Peron

    A twin tube tunnel of 2 000 meters long and an internal diameter of 6.90 m has been excavated through alluvial ground, with low overburden, using a 8.0 m diameter Earth Pressure Balanced tunneling mac

    Jan 1, 1995

  • SME
    Case History of the New St. Clair River Tunnel

    By J. F. McDonald

    On December 8th of last year, the new St. Clair River tunnel was holed-through to Port Huron, Michigan. The tunnel, commissioned by the Canadian National Railway, was needed to replace an existing tun

    Jan 1, 1995

  • SME
    Tunnel Boring Machine Concept for Converging Ground

    By Rock M. Poulin, Bruce G. Moulton, Daniel E. Nowak, David T. Cass

    The Yacambu Irrigation Tunnel Project of 34 km, 5 meter diameter circular and horseshoe section, has been under construction since the early 1970's. Notable among the excavation challenges is hig

    Jan 1, 1995

  • SME
    The South Bay Tunnel Outfall Project San Diego, California

    By Jon Y. Kaneshiro, Gregory E. Korbin, Stephen J. Navin, Larry J. Stout

    Sewage presently being discharged into the Tijuana River Valley pollutes the valley as well as the beaches in the South Bay of San Diego, making the beaches unusable nearly year round. The SBTO will c

    Jan 1, 1995

  • SME
    The State Of Underground Metal Mining

    By H. B. Miller

    By its nature, underground metal mining is unlike any other business in the industrial sector. Operations are continuously exposed to economic risk as a normal consequence of mining due to uncertainti

    Jan 1, 1995

  • SME
    Specific Problems of Very Large Tunnelling Shields

    By Lothar Anheuser

    The appearance of very large shielded softground TBM's, of 14 m (46 ft) O.D. and more, as needed for two-lane highway tunnels, calls for a thorough search of overall stability and new solutions f

    Jan 1, 1995

  • SME
    Use Of A Tracer To Collect Hydrologic Data For In Situ Stope Leaching Research

    By N. C. Miller

    In situ stope leaching is an innovative mining system that reduces the surface impacts of conventional underground mining. As in any leaching operation, stope leaching requires hydrologic site charact

    Jan 1, 1995

  • ISEE
    Smooth Blasting with the Electronic Delay Detonator

    By Yoshiharu Tanaka, Toshiyuki Ichijo, Masaaki Yamamoto

    We utilized electronic detonators (EDs) to investigate the effect of high detonator delay accuracy on overbreak, remaining rock damage, and surface smoothness, in comparison with that of long-period d

    Jan 1, 1995

  • SME
    Cleuson-Dixence Hydro-Electric Project

    By F. Chavan

    1. Introduction The new Cleuson-Dixence development project in the Valais region of the Swiss Alps, involves the construction of a new link between the Grande-Dixence dam (still world recordholder

    Jan 1, 1995