Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Seismic Design Of Underground Structures
By A. J. Hendron, J. E. Monsees
INTRODUCTION This paper is the outgrowth of work done by the authors to prepare the seismic design criteria for underground structures on the Southern California Rapid Transit District (SCRTD) Metr
Jan 1, 1985
-
RI 8990 - Procedures for Determining Support of Excavations in Highly Yielding Ground
By J. D. Dixon
This Bureau of Mines report describes the results of an investigation for developing and applying procedures for stabilizing excavations openings in highly yielding ground. The approach developed in t
Jan 1, 1985
-
NATM Provides Improved Design And Construction Method For U.S. Tunnel Projects
By G. W. Rhodes, B. P. Cavan, F. K. Mussger
The New Austrian Tunneling Method (NATM) has been successfully applied to two very different tunneling projects in the U.S.. In the case of Pittsburgh's Mt. Lebanon Tunnels, two original design a
Jan 1, 1985
-
Design And Construction Of The Soudan 2 Detector Laboratory
By D. Lee Petersen, Charles R. Nelson, Marvin Marshak
INTRODUCTION Construction is underway on a laboratory cavern 713 m below surface at the Soudan Mine, Tower-Soudan State Park, in northeastern Minnesota. The 13.9 in wide by 11.6 m high by 71.8 in l
Jan 1, 1985
-
Macassa Number Three Shaft Deep Shaft Sinking By Conventional Methods
By W. M. Shaver, W. R. Dengler, F. A. Edwards
INTRODUCTION The Macassa Division of Lac Minerals Ltd. is a high grade gold mine that has been operating in Kirkland Lake, Ontario for the past 51 years. It produces approximately 120,000 tonnes of
Jan 1, 1985
-
Prediction of Hazards in Underground Excavations
Exceptionally weak ground, usually associated with faulting, unanticipated groundwater pressures or flows and exceptionally high stress concentrations are some of the hazards which confront the underg
Jan 1, 1985
-
The Agoyan Project, Ecuador Tunnel And Underground Powerhouse Excavation
By Odd E. Hanssen
In April 1982, the contracting Companies, ABV of Sweden and Hoyer-Ellefsen of Norway forming the Consorcio Escandinavo Agoyan, signed the contract for the construction of the civil works of the Agoyan
Jan 1, 1985
-
Electrification and use of Electric Hydraulic Equipment at Mount Lyell
In 1972, with the West Lyell Open Pit winding down, mining operations transferred underground. All development tunnelling until the end of the decade was carried out by a fleet of ten pneumatic Jumbos
Jan 1, 1985
-
Control and Automation of Underground Operation in the UK Mining Industry
The concentrated efforts now being directed towards the development and application of monitoring and control techniques have now resulted in their widespread use in UK mines together with evidence of
Jan 1, 1985
-
Design, Excavation, Support Of A Large Diameter Coal Mine Access Decline Using A Tunnel Boring Machine
By Steve Polegato, J. Coady Marsh, Gary Landry
The Donkin-Morien Mine in Cape Breton, Nova Scotia, has successfully completed the excavation of a 7.6m (25-ft) diameter access decline over a distance of 3.5km out under the Atlantic Ocean. The tunne
Jan 1, 1985
-
Grouting And Freezing For Shaft Water Control In Milwaukee
By Patrick J. Doig
The contract for the construction of the Inline Pump Station for the Milwaukee Metropolitan Sewerage District involves the sinking of three shafts and the excavation of a pump chamber. The shafts a
Jan 1, 1985
-
Shaft And Tunnel Lining Techniques Used At The Rocky Mountain Pumped Storage Project
By W. D. Presley, T. R. Harrell
This paper will be a case history of the shaft and tunnel concrete lining techniques used at the Rocky Mountain Pumped Storage Project located in northwest Georgia. Emphasis will be placed on the shaf
Jan 1, 1985
-
Steel Linings In Vertical Openings
By James W. Harrower, Gerald S. Ball
This paper discusses the installation of steel linings in vertical, raisebored openings. Design criteria used to evaluate the applicability of liner type and design are presented as well as a brief de
Jan 1, 1985
-
Geotechnical Considerations In Coal Mine Planning And Design ? Introduction
By Madan M. Singh
Increasingly, geotechnical data are being collected for various types of coal development projects. In many cases, a specific design concern is addressed. However, many data collection programs are no
Jan 1, 1985
-
RI 8924 - Comparative Laboratory Evaluation of Resin-Grouted Roof Bolt Elements
By John R. Bartels
In laboratory testing, the Bureau of Mines established criteria by which common resin-grouted roof bolting systems can be evaluated and compared. Ultimate strength and stiffness were determined for no
Jan 1, 1985
-
Underground Pumphouse Excavation At The Mainstream Pumping Station, Chicago
By Al Sylvester
The drill-and-shoot excavation of the two underground Pumphouses for the Metropolitan Sanitary District of Greater Chicago's Mainstream Pumping Station is described. The construction sequence inv
Jan 1, 1985
-
Lower level operations in a thick steeply pitching seam at Cadomin Coal Mine; in Cadomin, Alberta
By N. Melnyk
"FOREWORDThis paper provides a unique description of a method devised for mining a very thick steeply dipping seam of soft gassy coal which was prone to spontaneous combustion. The editors con¬sider t
Jan 1, 1985
-
IC 9040 Environmental Issues Related To Mineral Development In The Stillwater Complex, MT
By Michael T. Nigbor
This Bureau of Mines publication identifies the significant environmental issues associated with the potential development of strategic and critical minerals in the Stillwater Complex, MT. The Stillwa
Jan 1, 1985
-
Shaft Sinking In The Hemlo Gold District
By Peter White
The Hemlo Gold District, located on the north shore of Lake Superior, was discovered in 1981 and will become one of the largest gold mining camps in Canada. Three major Canadian mining companies are p
Jan 1, 1985
-
The New Brunswick coal resource
By F. D. Ball, D. E. Gemmell
"Coal mining in New Brunswick dates from the year 1639, when, as today, coal was produced from the area surrounding Grand Lake near the geographic centre of the province. Current production by N.B. Co
Jan 1, 1985