Tunnel Boring With Hydraulic Debris Disposal
By W. Setzepfandt, J. Henneke
PREFACE Debris disposal can very often be a severe problem and major restriction on tunnel boring projects, especially for small diameter tunnels and in underground mines. Hydraulic transport could
Jan 1, 1981
-
Thermomechanical Behavior Of Backfilled Disposal Rooms For Waste Retrieval Considerations In A Salt Dome Repository
By Paul F. Gnirk, Ralph A. Wagner, Joe L. Ratigan
This thermomechanical analysis used the finite element method to investigate the behavior of crushed salt backfill in a waste disposal room situated in a salt dome repository. The first of two objecti
Jan 1, 1981
-
Molybdenite Recovery At Cuajone - Introduction
By Donald M. Podobnik
The Cuajone Concentrator of the Southern Peru Copper Corporation is located approximately 900 kilometers southeast of Lima, Peru, near the 500 year old town of Moquegua, in an area that has been occup
Jan 1, 1981
-
"Control Of Heavy Water Inflows In The Moawhango-Tongariro Tunnel, New Zealand"
By George Munro
Heavy water inflows of up to 1350 1/sec in the 19.6 km Moawhango-Tongariro Tunnel section of the Tongariro Power Development Scheme in New Zealand gave rise to severe operating problems, particularly
Jan 1, 1981
-
Development Of Tunnel Boring Machine Systems For Ground Control
By J. S. Hattrup
INTRODUCTION Tunnel boring machines in non-abrasive competent rock with little or no water have set new performance standards in the driving of tunnels. However, when the machines have hit blocky o
Jan 1, 1981
-
Quebrada Blanca, Chile An Enriched Porphyry Copper Deposit
By John P. Hunt
Early disseminated copper mineralization at Quebrada Blanca, Chile, accompanied 38 million year old quartz monzonite stocks and dikes. Early mineralization was followed by hydrothermal mineralization,
Jan 1, 1981
-
Upside Down Concrete Accelerates Large Tunnel Project
By George Joseph Malina
Contractor chose and Owner allowed concrete to be placed using the arch first principle while excavating the 35'-3" O.D. rock tunnel. The contract included excavating and lining 26,000 L.F. of ro
Jan 1, 1981
-
Homestake Mining Company - Bulldog Mountain Operation - Creede, Colorado
Homestake's Bulldog Mountain Operation near Creede, Colorado, in the San Juan Mountains at an elevation of nearly 2,750 m (9,000 ft), is subjected to short summers and long cold winters. Creede’s
Jan 1, 1981
-
Interpretation of Field Stresses and Deformation Moduli from Extensometer Measurements in Rock Tunnels
By Redman P. G, McMahon B. K
A simple technique for evaluating the field stress ratio is presented, based on the results of extensometer or convergence tape measure- ments taken in an advancing tunnel. This tech- nique also yie
Jan 1, 1981
-
Milchbuck Tunnel Application Of The Freezing Method To Drive A Three-Lane Highway Tunnel Close To The Surface
By Leonhard Schmid
INTRODUCTION In the region of Zurich several of the Swiss Interstate Highways meet and have to be linked to form a continuous network. The subalpine glacial topography with hills, ridges and lakes
Jan 1, 1981
-
Rock Mass Response And Machine Performance In A Full-Face TBM Tunnel In Rochester, NY
By T. D. Rourke, Fred H. Kulhawy, O&apos
From mid-1976 to early 1978, a 5.64 m diameter tunnel, 2491 m long, was excavated by a modified Robbins full-face TBM under shallow cover in highly stressed sedimentary rock in Rochester, NY. In-situ
Jan 1, 1981
-
Monitoring For The Evaluation Of The Stability Of Underground Openings
By P. K. Kaiser
The purpose of deformation monitoring for the evaluation of the stability of underground openings is reviewed briefly and some results from laboratory tests of small tunnels are presented. The ground
Jan 1, 1981
-
Pipe Jacking Techniques For Small Soft Ground Tunnels
By Michael E. Allen
The building of sanitary and storm drainage sewers in urban or environmentally sensitive areas often requires the use of tunnel construction procedures. While hydraulic considerations may require only
Jan 1, 1981
-
Groove Deepening With Disc Cutters
By Dominic F. Howarth
Groove deepening (deepening of a groove in rock by successive passes of a rock cutting tool) is a potential operational feature associated with tunnel boring machines. Little research has been underta
Jan 1, 1981
-
Rock Stress Measurements As A Practical Tool In Norwegian Mining Engineering Practice - 1. Introduction
By Arne M. Myrvang
Rock stress measurements have been carried out by the Mining Department, the Norw. Institute of Technology (NTH) since 1964. Before that time rock stress measurements were carried out at a few locatio
Jan 1, 1981
-
Activated Roller Cutters as a Means of Rock Breakage Initial Test Results and Future Applications
By Lothar Baumann, Wilhelm Knickmeyer
In mechanized roadheading predominantly two methods of rock breakage are applied at present: the cutting method by means of picks and the cutting/crushing method by means of roller cutters. Both syste
Jan 1, 1981
-
Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project
By Johns A. L
The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victor
Jan 1, 1981
-
High-Head Underground Power Project Presents Design/Construction Challenges
By Arthur G. Strassburger
INTRODUCTION High in the Sierra Nevada Mountains of California, some 50 airline miles (80 km) northeast of Fresno, and near the John Muir Wilderness and Kings Canyon National Park, a large undergro
Jan 1, 1981
-
The Red Hook Intercepting Sewer - A Compressed Air Tunnel Case History
By Eugene F. Casey, John G. Ruggiero
INTRODUCTION Construction of tunnels in urban areas, especially reclaimed areas, pose many problems. The Red Hook Intercepting Sewer Tunnel, Contract 1A is a portion of the Red Hook Water Pollution
Jan 1, 1981
-
Shallow Compressed Air Tunnelling on the Murl Project
By Bennet A. G
As part of the construction of the Melbourne Underground Rail Loop it was necessary to construct two 7 metre diameter tunnels, each 100 metres in length, by shield driven excavation through an all
Jan 1, 1981