Search Documents

Search Again

Search Again

Sort by

  • SME
    The Longest Drive?Portland?s CSO Microtunnels

    By Christa Overby

    As part of the City of Portland, Oregon?s East Side Combined Sewer Overflow Tunnel Project, nine separate 2,130 mm (84-inch) diameter reinforced concrete pipe microtunnel drives totaling approximately

  • NIOSH
    Detonation wave propagation in underground mine entries

    By Alex C. Smith, Michael J. Sapko

    A series of explosive detonation experiments was conducted in NIOSH’s Bruceton and Lake Lynn Experimental Mines to evaluate low level (<6 psig) detonation wave propagation behavior in single and multi

  • DFI
    East Boston Branch Sewer Relief Project: Support Of Excavation Case Study

    By Eric P. Bregman

    As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

  • SME
    Controlling Ground Water in Tunneling is Subject of Third Cutting Edge Conference

    By Steve Kral

    The third edition of the Underground Construction Association of SME?s (UCA) Cut-ting Edge series of conferences focused on a challenge every underground construction and tunneling project faces: cont

  • AIME
    St. Louis Paper - On Rock Drilling Machinery

    By E. Gybbon Spilsbury

    It is not my purpose in this paper to describe all the different contrivances which have been devised, during the last quarter of a century, for the purpose of Iessening the expense of mining and tunn

  • SME
    Subsurface Repository Ventilation Design

    By Edward Thomas

    Yucca Mountain Overview The U.S. Department of Energy?s Yucca Mountain Project is a geologic repository project designed to receive, handle, package, transport, and emplace spent nuclear fuel and hig

  • SME
    Design Of NATM Tunnels And Stations Of Silver Line Phase III Project In Boston

    By Verya Nasri

    The Silver Line Phase III Project is the final one mile underground segment of the new Bus Rapid Transit in downtown Boston. The project is expected to significantly reduce existing and anticipated tr

  • SME
    Innovative NATM?Design For A Large Shallow Cavern At Stanford

    By Thomas Marcher

    Stanford Linear Accelerator Center (SLAC) is located in Menlo Park, CA. In order to allow for enhanced experiments, the current facilities required expansion. Tunnels were excavated through very weak

  • AIME
    Reservoir Engineering–General - Matching the Performance of Saudi Arabian Oil Fields With an Electrical Model

    By L. D. Mullins, W. R. Bartlett, R. H. Barham, W. L. Wahl

    This paper describes an electrical model and its applicution to the analysis of four reservoirs in Saudi Arabia. The model has 2,501 mesh points and represents 35,000 sq miles of the Arab-D member. De

  • AUSIMM
    A Mining Puzzle

    To the south and west of Broken Hill lies the Thackaringa silver-lead district, about 25 miles, and is the locality really of the first silver find in the country long before Broken Hill, the geologic

  • SME
    EPB Tunnelling Through Cohesionless Saturated Ground Under Very Shallow Cover?Perth New Metrorail City Project

    By Hiroshi Yamazaki

    The paper describes prediction, control and validation of face pressures, and special TBM features for the bored tunnels of the New Metro Rail City Project, Perth, Australia. The selected EPB-TBM pass

  • SME
    Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel Project

    By Stephen M. Smading

    Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w

  • SME
    Open Pit TBM Driven Drainage Tunnel?Ok Tedi Mine

    By Tony Peach

    Project Description The Ok Tedi Mine is located approximately 18 km east of the Papua and New Guinea-Indonesia border, on the southernmost extremity of the Star Mountains Range, it is situated almost

  • NIOSH
    Mine Aerosol Measurement - Introduction

    By Bruce K. Cantrell, Jon C. Volkwein

    Exposure to mineral aerosol is an occupational health hazard in mining and mineral processing industries because of the risk of developing pneumoconiosis. Agricola (1556) described this hazard for met

  • AIME
    NEW Haven Paper - The Musconetcong Tunnel

    By Henry S. Drinker

    The Musconetcong tunnel is situated in New Jersey, near the line of the Central Railroad of New Jersey, about twelve miles from Easton, on the Easton and Amboy Railroad, the latter being the extension

  • ISEE
    Numerical Investigation of Blasting Fume Characteristics in a Block Caving Mine

    By Yong Pan, Purushotham Tukkaraja

    Block caving is a preferred underground mining technique due to its high production rate and low operation cost. Before its final step into a mature caving system using gravity to break rock, drilling

  • SME
    Short Tunnels = HIGH Risk?: Pipeline Construction Involving Open-Cut And Tunnel Segments

    By Michael Gilbert

    In the world of tunneling the glamour is in the large diameter, long tunnels, but perhaps the number of projects for small diameter and short length tunnels are greater and generally have higher risk

  • SME
    Technical Considerations For TBM Tunneling In The Andes

    By Dean Brox

    The use of Tunnel Boring Machines (TBMs) for tunnel construction of long tunnels in the Andes of South America has been of mixed success in the past due to a variety of reasons and key lessons can be

  • ISEE
    Vibration Monitoring Standards Connected to the Use of Explosives in Different Countries

    By Johan Finsteen Gjødvad, Mathias Jern

    The paper is part of the ongoing work of the Environmental committee of EFEE. To assist the European experts working with explosives one of the aims is to improve the common knowledge of similarities

  • SME
    TBM And NATM Combined Solution For A Very Deep Tunnel?The ?Pajares? Case

    By Enrique Fernández

    INTRODUCTION The high speed rail link between Madrid and Asturias, in the North of Spain, has encountered in the Cantabrian range the biggest challenge of the whole line, a very deep tunnel, 25 km l