Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Selection, Design, And Procurement Of North America?s Largest Mixshield TBM For Portland, Oregon?s East Side Cso Tunnel
By Christof Metzger
This paper discusses the process utilized by the Kiewit?Bilfiger Berger Joint Venture (Contractor) to select, design, and procure the largest mixshield tunnel boring machine (TBM) ever implemented in
-
Opening Supports to Segmental Linings:A Novel Shotcrete Support Solution (4dda697d-11f6-4774-84f0-12e4af00636d)
By Anthony Harding
In a world of technology and electronic communication, it is easy to forget what engineers do best with a problem: sitting around a table, exchanging views and ideas with sketches and respecting every
-
High Risk Tunneling Adjacent To Large Water Tank On The UNWI Sections 3&4 Project
By Andrew Finney
INTRODUCTION The Sacramento Regional County Sanitation District (SRCSD) serves unincorporated areas of Sacramento County, parts of the cities of Sacramento and Folsom, and the cities of Citrus Heigh
-
Visit to Hendrik Verwoerd Dam
On 23rd October, 1969, 54 members of the Institute set out at an early hour from Rand Airport in two chartered Dakota aircraft for a visit to the Hendrik Verwoerd Dam site. The weather was at the star
-
The Road To Innovation In Geotechnical Construction
By Peter J. Nicholson
During my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concrete or steel i
-
Double Shield TBM In Challenging, Difficult Ground Conditions?A Case Study From Zagros Long Water Transfer Tunnel, Iran
By Jafar Khademi Hamidi
The Zagros long tunnel is one of the main components of Sirvan water transfer project in western Iran. It is approximately 48 km in length and consisted of two lots. The second 26 km lot of this tunne
-
Assessment of Post-blast Damage Zones in Tunneling Operations Through MWD and Machine Learning
By Clara Godoy, Paulo Couceiro, Juan Navarro
The continuous automatization and digitalization of the different stages involved in any underground construction bring new possibilities to optimize the operation. One of the most important requireme
-
The Delivery Of Underground Construction Projects In The UK: A Review Of Good Practice
By Andy Alder
The aim of this paper is to provide an overview and details of good practice, from a United Kingdom perspective, in the development and implementation of major tunnel and underground infrastructure pr
-
Industry Turns its Focus to California During 2014 NAT Conference
By Steve Kral
The former mayor of Los Angeles, CA is a believer in public transportation but thinks neither his city nor the entire country is spending enough on basic infrastructure. In fact, the United States ha
-
A Practical Approach For Precast Concrete Segmental Ring Selection
By Steve Skelhorn
Over the recent years, major advances have been made in design of precast concrete segmental tunnel liner. Starting from basic, parallel sided rings, we now have state of the art, universal rings inco
-
Big Walnut Outfall Augmentation Sewer?Part II: Tbm Case History
By Tom Szaraz
Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer?Part II (BWOAS) consists of 13,200 feet of tunnel of 12-foot tunnel passing mainly through gla
-
Daylighting Thorn Creek Tunnel Into Chicago?s Tarp Thornton Composite Reservoir
By Cary Hirner
The Metropolitan Water Reclamation District of Greater Chicago (District) is in the final phase of completing the Calumet System component of the Tunnel and Reservoir Plan (TARP) by bringing the Thorn
-
Adeco As An Alternative To NATM: How It Works, WHY It Works
By Fulvio Tonon
And Rabcewicz said ?tunnels should be driven full face whenever possible.? ADECO, which stands for ?Analysis of Controlled Deformations in tunnels,? now allows us to fulfll Rabcewicz?s dream in any st
-
Notices
MEMBERSHIP In terms of By-laws7.7.1 members are hereby notified that the membership of the following has been cancelled and their names removed from the Membership Register: H. Digby Roberts, R. J
-
Toward Open-Source Hardware and Software for the Mining Industry: a Case Study of Low-Cost Environmental Monitoring System for Non-Metallic Underground Mines Mining, Metallurgy and Exploration (3a9c5e4e-b387-4996-946a-2dab73f8a3f7)
By Mokhinabonu Mardonova, Yosoon Choi
Open-source technology for supporting the Industry 4.0 has become the target of academic research in many sectors. This study reviewed the trends of open-source technology, its forms, and some industr
-
Geotechnical Baseline Reports?A Review
By T. Freeman
In the past ten years, the Geotechnical Baseline Report (GBR) has arguably become the key document for tunnel construction. This report not only allocates much of the risk involved with the work, it s
-
Railroad Interface Management For Mta East Side Access Project Tunnels And Structures
By Michael A. Piepenburg
The East Side Access (ESA) Project will extend Long Island Rail Road (LIRR) into midtown Manhattan via 11 km of tunnels, a new terminal station and associated support facilities. In addition to the ha
-
Hobson And Rosedale Tunnels?New Technology In Auckland
By Harry Asche
The last 12 months has seen the construction of the first Earth Pressure Balance (EPB) TBM excavated tunnel in New Zealand on the Project Hobson sewer storage tunnel for Watercare Services Limited, wi
-
Assessing Ground Ahead Of TBm Tunnel Using Low-Interruption Wireless Seismic Reflector Tracing System
By Takuji Yamamoto
High-speed TBM excavation requires rapid ground assessment ahead of excavation, particularly in complex grounds. The Tunnel Reflector Tracing technology (TRT) developed by authors, uses seismic reflec
-
MBTA Silver Line Phase III?Completes Boston?s Newest Transit Line
By Gregory Yates
INTRODUCTION Project Description The Silver Line is a Bus Rapid Transit (BRT) Line and is Boston?s newest transit service. Silver Line Phase I extends along Washington Street entirely on the surface