Search Documents

Search Again

Search Again

Sort by

  • SME
    New Approach Of ASFINAG For Tunnel Construction Monitoring Of The Tauern Tunnel Project In Austria

    By Robert Schnab

    ASFINAG is responsible for the construction and operation of the Austrian highway system. It is approx. 2,400 km of highways and 65 tunnels with a total length of 200 km including the Tauern Tunnel.

  • SME
    Ground Characterization For CSO Tunnels In Washington, D.C.

    By Maurice A. Ponti

    The D.C. Water and Sewer Authority is implementing the Anacostia River Projects component of its Long-Term CSO Control Plan, including 21 kilometers of 3.7- to 7-meter-diameter CSO near-surface divers

  • SME
    Planning And Design Features Of The Waller Creek Tunnel, Austin, Texas

    By Gary Jackson

    Preliminary engineering for the Waller Creek Tunnel was completed in 2001, but the project was held in abeyance until the summer of 2007. This paper describes several features of the revised design, w

  • SME
    TBM Tunneling At The Ashlu Hydropower Project, Squamish, BC

    By Serge Moalli

    The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4

  • SME
    Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case History

    By Bob Rautenberg

    The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s

  • SME
    TBM Data Management And Quality Assurance For The Brightwater Conveyance Project

    By Jeffrey Mitsopoulos

    King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which

  • SME
    Modern Caverns In Gotham?Geotechnical And Design Challenges For Large Rock Caverns In Manhattan

    By Timothy P. Smirnoff

    Sustaining the region?s mobility needs, achieving projected economic growth, and maintain Midtown Manhattan as a center of regional, national and global importance has led to continued investment in c

  • NIOSH
    Investigation Of The Jacking Force Capability Of Tunnel Liners

    By Thomas M. Barczak, Ron Smith

    Steel liner plates, which are bolted together to form a shell, are commonly used to provide temporary protective linings in the tunneling industry to ensure the stability of the tunnel and safety of t

  • SME
    Microtunneling For Utilities Under Harold Railroad Interlocking

    By William Reininger

    Microtunneling provides a necessary solution for multiple utility crossings associated with the New York Metropolitan Transportation Authority Capital Construction Company?s (MTACC) Eastside Access Pr

  • SME
    Robbins 10M Double Shield Tunnel Boring Machines On Srisailam Left Bank Canal Tunnel Scheme, Alimineti Madhava Reddy Project, Andhra Pradesh, India

    By William Brundan

    INTRODUCTION The Srisailam Left Bank Canal (SLBC) Tunnel Scheme is part of the Alimineti Madhava Reddy Project in Andhra Pradesh, South India. This scheme has been planned since 1983 and will provide

  • NIOSH
    Workplace Stress

    YOUR mom was right …count to 10. Most workers today report that they find their jobs stressful. Miners, in particular, are faced with hazardous and changing environments. Every shift provides differen

  • SME
    San Vicente Pipeline Tunnel?Reach 4W, 3, And 2: Case History

    By Michael Jatczak

    The San Vicente Tunnel Project is an 11-mile water tunnel constructed for the San Diego County Water Authority. One of the many challenges of the project included tunneling a 22,000-foot single-headin

  • NIOSH
    Using Proximate Analysis to Characterize Airborne Dust Generation from Bituminous Coals

    By Steven J. Page, John A. Organiscak

    The amount of airborne respirable dust generated from break- age of different coals varies widely. This research was conducted to identify the facets of airborne respirable dust liberation from the co

  • NIOSH
    IC 9272 - Summary Of Combustion Products From Mine Materials: Their Relevance To Mine Fire Detection

    By Margaret R. Egan

    The U.S. Bureau of Mines investigated the product-of-combustion (POC) characteristics of combustible materials used in typical coal mining operations in a series of experiments conducted in an interme

  • SME
    Construction Of The East Side Access Manhattan Tunnels

    By Don Hickey

    The MTA in conjunction with LIRR, are in the process of expanding one of the largest commuter railroads in the country, with over 260,000 passengers a day. The LIRR, which provides 700 passenger train

  • SME
    8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

    By Antonio Raschillà

    On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p

  • SME
    Continuing The Legacy: An Update On The Construction Of The New Second Avenue Subway

    By Jaidev Sankar

    The dream of constructing the new Second Avenue Subway in New York has finally become reality as the first construction contract package is currently underway. This first contract requires the constru

  • SME
    Industrial Minerals Review 2013

    By R. L. Virta

    Four companies ? H.C. Spinks Clay Co., Inc., Imerys, Old Hickory Clay Co., and Unimin Corp. ? mined ball clay in four states in 2013. On the basis of preliminary data, production was 1 Mt (1.1 million

  • NIOSH
    Mine Rescue And Response

    By Ronald S. Conti

    This paper describes technology and training that has been identified for underground emergency responders. Historically, underground mine rescue teams have only received training in the course of act

  • SME
    Industrial Minerals Resources: Reporting According to Clause 49 of JORC 2012

    By Andrew Scogings

    The current edition of The Australasian Joint Ore Reserves Committee (JORC) Code was published in 2012 and, after a transition period, the 2012 edition came into mandatory operation on Dec. 1, 2013.