Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Slurry Walls, Tiebacks, and Tiedowns: Maximizing the Efficiency of Underground Station Space
By James Parkes
"The proposed Baltimore Red Line light rail system includes a 3.4 mile downtown tunnel (DTT) with five underground stations. The design of the underground stations involved overcoming several challeng
Jan 1, 2016
-
Overcoming Massive Squeezing Ground Utilizing Curved Tunnel Face and Full-Face Excavation with Early Ring Closure
By Hiroyuki Tamaru, Futoshi Kusumoto, Kosuke Tanimura, Atsuyuki Kimura
"SUMMARY The Hachinoshiri tunnel is a 2,469 m long two-lane road tunnel on the Chubu-Odan Expressway. Since more than 70% of the total tunnel length consists of low strength rock masses the competence
Jan 1, 2016
-
Recent Swedish Studies on the Extent of Blast Damage After Excavation
By Rolf Christiansson, Daniel Johansson, Urban Åkeson, Henrik Ittner, Mats Olsson
"This paper presents two recent studies on the extent of blast damage after excavation in crystalline rock. The Swedish Transport Administration and the Swedish Nuclear Fuel and Waste Management Compa
Jan 1, 2016
-
Guidelines for Soil Mixing
"1.0 INTRODUCTIONThese Guidelines reflect the state-of-the-practice of the Deep Mixing Method (DMM) in North America. DMM is an in situ mixing process that breaks down the soil structure; injects bind
Jan 1, 2016
-
Decision Analysis of Alternative Contracting Strategies for Tunnel Projects - Contracting Strategy Can Make or Break a Project Where the Success Is Measured With Key Performance Indicators
By Faruk Oksuz, Cary Hirner, Ray Brainard
"Key project participants, including owners, engineers, and contractors continually seek for sound and structured decision analysis on how to select the best contracting method for successful project
Jan 1, 2016
-
Crossrail C310 Thames Tunnel—Mixshield TBM Tunneling in Alternating Ground Conditions With Low Overburden
By Chris Ashton, Andreas Rädle, Taner Aydogmus
"The Contract C310 is part of the current biggest infrastructure project of Europe “Crossrail” which is a major new cross-London rail link project and comprises the construction of the North Woolwich
Jan 1, 2016
-
Percussion Drilling as Fast and Efficient Investigation in Construction Stage - A Case Study from Koralm Base Tunnel, Austria
By Giorgio Höfer-Öllinger, Peter Pointner, Manfred Stadlober
"SUMMARY Investigations from tunnel face are part of risk mitigation measures during the excavation works. With the tunnel equipment, percussion drillings of up to 30-40m can be achieved. Core drillin
Jan 1, 2016
-
Study of TBM Performance Prediction Using Rock Mass Classification
By Jamal Rostami, Alireza Salimi, Christian Moormann
"Rock mass classification systems are often applied in many empirical design practices in rock engineering, some contrasting with the original intent and applications of these classification systems,
Jan 1, 2016
-
Ventilation and Safety of Long and Deep Tunnels—State of the Art and New Perspectives
By Samuel Rigert, Marco Bettelini
"INTRODUCTION AND OBJECTIVES Long rail tunnels require in most cases powerful mechanical ventilations. Besides requirements related to normal operation and maintenance, operational safety always requi
Jan 1, 2016
-
Proposal of the Tunnel Face Stability Index (TFI) Based on the Critical Shear Strain Theory
By Shingo Morimoto, Toru Sasaki, Masato Shinji
"1. INTRODUCTIONTunnel face stability is one of the most important consideration in New Austrian Tunneling Method. In general, if all of the material properties of ground can be obtained through the f
Jan 1, 2016
-
Roof Movement and Loading for Top-Coal Caving Longwall Mining in Extremely Inclined Thick Coal
By Shengliyang Yang, Jinghu Yang, Jiachen Wang, Xiaomeng Li
"Safe and efficient mining of extremely inclined thick coal seams less than 20m thick is one of the new challenges in China coal industry. In recent years, the extremely inclined thick coal seams have
Jan 1, 2016
-
Sound Transit East Link–Downtown Bellevue Tunnel
By Joe Hachey, Jerry Dorn, Jeff Schutt, Derek Penrice
"Sound Transit’s East Link Project, a $3.7 billion (2015 $), 14-mile light rail extension, will connect downtown Seattle with the rapidly developing east side cities of Bellevue and Redmond. Among the
Jan 1, 2016
-
Performance Optimization in Clogging Soils through Process Controlling
By Ulrich Maidl, Marc Comulada, Janosch Stascheit
"INTRODUCTION Cohesive soils are notorious for causing clogging of the cutter head and the excavation chamber of tunnel boring machines (TBMs). While clogging leads to a drastic reduction in excavatio
Jan 1, 2016
-
SDT Cálculo de sostenimiento en túneles y galerías mineras
By Emilio Cordero Cordero
En los proyectos de excavaciones subterráneas, túneles de obra civil y galerías mineras es necesaria la realización de cálculos para el sostenimiento adecuado para cada situación y comprobar que este
Jan 1, 2016
-
Primary-Secondary Lining Interactions for Composite Sprayed Concrete Lined Tunnels Using Sprayed Waterproofing Membrane
By Jiang Su, Michal Uhrin
"The use of composite linings, consisting of permanent sprayed primary and secondary linings with a sandwiched spray applied waterproofing membrane is expected to improve efficiency and reduce lining
Jan 1, 2016
-
Transient Face Support in Slurry Shield Tunneling Due to Different Time Scales for Excavation Sequence of Cutting Tools and Penetration Time of Support Fluid
By Britta Schoesser, Zdenek Zizka, Markus Thewes
"The support pressure of a slurry shield corresponds to the in situ earth and groundwater pressure to ensure the stability of the tunnel face. The support fluid (bentonite suspension) penetrates from
Jan 1, 2016
-
Analysis of Tunnel Grouting and Water Pressure Tests in Rampur Hydroelectric Project (412MW), SJVN Limited, India
By Ramesh Kumar Chauhan, Umakant Sharma, Manwendra Pratap Singh, Ashok Kumar Chadha
The power sector in India has an installed capacity of 267.637 GW as on March 2015. Out of this total installed capacity, the hydropower sector contributes 41,267.43 MW as renewable energy source. The
Jan 1, 2016
-
Development and Execution of a Risk Transfer Strategy for the Eglinton Crosstown LRT
By Brian T. Hamilton, Richard Piliounis, Cian Murphy
"The Eglinton-Crosstown Light Rail Transit line is a 19-kilometre corridor with a 10-kilometre underground portion currently being constructed by Metrolinx in Toronto through a densely populated urban
Jan 1, 2016
-
Combined Ground Freezing Application for the Excavation of Connection Tunnels for Centrum Nauki Kopernik Station—Warsaw Underground Line II
By Achille Balossi Restelli, Elena Rovetto, Andrea Pettinaroli
"The Station “C13” of Warsaw Underground Line II, with tunnel crown 10m below the water table, required the excavation of three connection tunnels, underpassing a six-lane in service road tunnel, work
Jan 1, 2016
-
Simulation-Based Analysis of Maintenance Strategies for Mechanized Tunneling Projects
By Alena Conrads, Markus König, Markus Scheffer, Markus Thewes, Hannah Mattern
"INTRODUCTION In recent years, the development of tunnel boring machines has revolutionized the tunneling industry. The general structure of a tunnel boring machine (TBM) can be described as a multi-c
Jan 1, 2016