DC Water First Street Tunnel – Integrated Engineering and Construction
By Stephen Njoloma, Ivan Hee, Ravi Jain, Mina Shinouda
"INTRODUCTION DC Water’s First Street Tunnel (FST) is comprised of a collaborative effort between DC Water, DC Water’s Project Consultants Organization (PCO) led by Greeley & Hansen and McMillen Jacob
Jan 1, 2016
-
Efficient Lighting for the Presidio Parkway Tunnels
By Pierre Longtin
"Replacing the aging roadway access to the iconic Golden Gate Bridge, thereby ensuring traffic safety and robustness in case of seismic occurrences, provided an opportunity for major design improvemen
Jan 1, 2016
-
Dynamic Interaction between Railway Tunnels at Multi-Leveled Tunnel Intersection
By Kang-Hyun Kim, Ho-Jong Kim, Jong-Ho Shin, Hoon-Ki Moon
"In urban areas, it is often required to construct additional railway tunnels beneath existing railway tunnels. In this case, dynamic interaction between tunnels at the intersection becomes an importa
Jan 1, 2016
-
Double Disc Cutter Consumption of an EPB TBM in Tuzla Wastewater Tunnel
By Utku Gumus, Ertan Bostanci, Hanifi Copur, Ahmet Rüfai Bilgin, Ugur Altay
"Field observations on replacements of 12-inch constant cross-section double disc cutters in Tuzla Wastewater Tunnel excavated by an EPB TBM with 3.151 mm excavation diameter excavating hard rock are
Jan 1, 2016
-
Reliability of Swelling Pressure Testing for Tunnel Support Evaluation
By Bjørn Nilsen
"INTRODUCTION/BACKGROUND Weakness zones or faults containing clay-rich gouge represent one of the most challenging rock mass conditions to be encountered during tunneling. In Norway, such conditions c
Jan 1, 2016
-
Underpinning and Instrumentation—Temporary Structures for Critical Solutions
By Jon “Ike” Isaacson, Frank Perrone, Eric Prantil
"Tunneling through an urban environment carries many inherent risks to the immediate local infrastructure and subsequently to the project stakeholders. On the CQ031 Contract of the East Side Access Pr
Jan 1, 2016
-
Istanbul Strait Road Tunnel Project – From Concept to Operation
By Basar Arioglu, Mustafa Tanriverdi, Seok Jae Seo
"INTRODUCTION Istanbul is a unique megalopolis connecting two continents. Population growth and economic development require permanent solutions and continuous investments on the transportation infras
Jan 1, 2016
-
TBM Technology for an Australian Coal Drift: The Grosvenor Project
By Robert Marks, Enrico Dal Negro, Richard Schulkins
"In July 2012 construction started on the Grosvenor project, a five million tonne per annum underground longwall mine planned for Moranbah in Central Queensland. Grosvenor is located immediately to th
Jan 1, 2016
-
Crack Width Reduction in Reinforced Concrete Members Using Barchip Macro-Synthetic Fibers
By Erik S. Bernard
"INTRODUCTION Conventional steel bar reinforcement is used in many tunnel linings to provide high flexural and tensile load resistance. These Reinforced Concrete (RC) tunnel linings may suffer flexura
Jan 1, 2016
-
Quality Management System on Sound Transit Underground Construction Projects
By Jim Salley, Mohammad Saleem, Indra Banerjee, Kevin Sapp
"On underground construction projects, effective Quality Management is essential for ensuring facility durability, life cycle performance and low maintainability. Furthermore, follow on contracts also
Jan 1, 2016
-
The Lee Tunnel Beckton London: An Innovative Use of FRC from Design to Construction Phase
By John Greenhalgh, Benoit De Rivaz
"1.INTRODUCTIONThis paper is based on the Lee Tunnel project, which is part of the Thames Water’s Tideway Project.The client Thames Water has employed a Joint Venture of Morgan Sindall/Vinci Grand Pro
Jan 1, 2016
-
Innovative Support of Cross-Passage Openings in Segmented Liner
By Karel Rössler, Petr Vítek
"The Ejpovice tunnels in Czech Republic were built by EPBM in soft Clyashale, and in weathered profile with low soil overburden. The segmented liner at the cross-passage openings required support, whi
Jan 1, 2016
-
Modeling Capture Efficiency for a Flooded Bed Dust Scrubber Incorporated into a Longwall Shearer using a Small Scale Physical Model and CFD
By A. Jolly, A. R. Kumar, T. Novak
"Coal dust in an underground mining environment has always been a health and safety issue, especially with longwall faces. Efforts to integrate a flooded bed scrubber within a longwall shearer are und
Jan 1, 2016
-
Introduction to Rock Strength Borehole Probe (RSBP) for Estimation of Rock Strength in Roofbolt Drill Holes
By I. Sedat Buyuksagis, Jamal Rostami, Ali Naeimipour
"Improving the safety of underground openings and optimizing ground support systems requires reliable ground characterization. This includes understanding the joints, discontinuities, and rock strengt
Jan 1, 2016
-
Service Life Prediction for the Ohio River Bridge East End Crossing Tunnel
"The Ohio River Bridge East End Crossing Tunnel requires a 75-year service life of its cast-in-place reinforced concrete lining. This twin-tube 3-lane (each tube) highway tunnel is about 55-ft wide an
Jan 1, 2016
-
Adaption of Protective Linings for Sewer Tunnels to Project Needs
By Gilles Recher, Jörg Riechers, Albert Lueghamer
"INTRODUCTIONIn view of a global trend towards urbanization, more and more trunk sewers and combined sewer overflow tunnels (CSO) with medium to large diameters and the corresponding link sewers are c
Jan 1, 2016
-
Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM Solutions
By Ergin Arioglu, Werner Burger
"SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp
Jan 1, 2016
-
Time-Dependent Deformations of Excavations and Tunnels in the Greater Toronto Area
By Andrew Cushing, Joe Carvalho, Jon Hurt
"INTRODUCTIONThe shales of the Greater Toronto Area (GTA) have been known to experience time-dependent deformations (TDD); those initiated by excavation-induced stress relief which progress with time
Jan 1, 2016
-
Design Diagrams for Estimating Tunnel Face Stand-Up Time in Water-Bearing Ground
By R. Schuerch, G. Anagnostou, R. Poggiati
"The paper presents dimensionless design diagrams for estimating the stand-up time of a tunnel face in saturated ground of medium-low permeability. The diagrams cover a wide range of ground parameters
Jan 1, 2016
-
Tunnel Lining for Drill and Blast Tunnels
By Björn Johansson
"SUMMARY Every tunnel designer has to consider the power of water ingress when designing a new tunnel. Either you choose solutions with simple methods to divert the ingress water or a robust system wi
Jan 1, 2016