    Economical Approach to Engineering Fire Durability of Structures

    By Sean Cassady, Jason Liu, Sanja Zlatanic, Taehyun Moon, Chris Devery

    "For the Hollywood International Airport Runway Expansion Project at Fort Lauderdale, Florida, the structural fire durability analysis was completed for a series of tunnels formed by roadway and railr

    Jan 1, 2016

  • SME
    DSU TBM for Vishnugad Pipalkoti - TBM Design Development for Large Diameter Rock Tunnels under the High Covers of the Himalaya

    By Remo Grandori

    "INTRODUCTIONDouble Shield TBMs were introduced in the market in the early seventies with three main targets:• Increase the TBM performances in term of advance per day thanks to the ability to erect a

    Jan 1, 2016

  • DFI
    High Capacity Drilled Piles in Brooklyn

    By Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe

    "The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount

    Jan 1, 2016

  • DFI
    Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”

    By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini

    "The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for

    Jan 1, 2016

  • SME
    Metro Rome Line “C”: Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni, Line “A” (88718b03-9244-4135-bce5-d10b55d2684f)

    By Salvatore Fancello, Ferruccio Cribari, Amerigo Tanzi, Mauro D’Angelo, Massimo Lodico, Alessandro Bertero, Eliano Romani, Tommaso Gondolini, Fabio Giannelli

    "The new metro line “C” entails the construction and rehabilitation of 24 stations and 21,5 km of metro line, 13 of which carried out underground; the new metro line will improve the transportation sy

    Jan 1, 2016

  • SME
    The Brenner Base Tunnel

    By Michael Rehbock-Sander, Romed Insam

    "INTRODUCTIONThe idea of building a summit tunnel under the Brenner occurred to the Italian engineer Giovanni Qualizza as far back as 1847. But it was to be another 160 years to pass before a base tun

    Jan 1, 2016

  • SME
    Use of Numerical Modelling and GIS to Analyse and Share the Risks Related to Urban Tunnelling - Greater Paris - Red Line – South Section

    By Fatima-Zahra Houmymid, Elena Chiriotti, Mahdi, Samy

    "The Greater Paris projects involves the creation of a 200km extension of the actual public transport network on the close outskirt of Paris. In 2011, SYSTRA has been awarded the Engineering studies o

    Jan 1, 2016

  • SME
    Unexpected Post-Excavation Damage to a 28"-Thick Segment Lining - Failure Mechanism and Rehabilitation Measures

    By Jens Classen, Martino Gatti

    "GENERAL PROJECT DATAThe Sparvo Tunnel is part of the “Variante di Valico” project, a new 65km (40mi) highway link between Bologna and Florence, designed to renew the existing A1 route which connects

    Jan 1, 2016

  • DFI
    Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure

    By Andrew R. Klaetsch, Peter W. Deming

    "The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th

    Jan 1, 2016

  • DFI
    UB Digs Deep and Builds Over Adjacent Subway for New Medical Building Hub

    By Lisa R. Papandrea, David Chen, Walter E. Kaeck

    "Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su

    Jan 1, 2016

  • DFI
    TBM Recovery Shaft Construction - SR-99 Tunnel

    By Lance Rasband, Richard Hanke, John Starcevich

    "The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure

    Jan 1, 2016

  • SME
    The Widening of the “Montedomini” A14 Motorway Tunnel in the Presence of Traffic

    By Saverio Agresti, Giuseppe Lunardi, Donato Basta, Roberto Trapasso

    "At a distance of 10 years from the first application of the Nazzano Method, the widening under traffic of a tube of an existing motorway tunnel was realized near Ancona, along the A14 Motorway in Ita

    Jan 1, 2016

  • SME
    The 3D Geological Model of the Karavanke Tunnel, Using Leapfrog Geo

    By Tina Živec, Žibertm Marko

    "Civil design has changed in many ways using BIM (Building Information Modelling) technology in its most recent form. Such a technological breakthrough has not been successful so far in traditional or

    Jan 1, 2016

  • SME
    "Key Technologies of Large RectangularPipe Jacking Machine"

    By Lianhui Jia, Yali Han

    "The key technologies of a large rectangular pipe jacking machine with dimensions of 10.12m × 7.27m (width x height) include selection of rectangular cross-section cutting modes, analysis on the stren

    Jan 1, 2016

  • DFI
    “Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down Method

    By Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi

    "The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,

    Jan 1, 2016

  • SME
    ACI Guideline on Design and Construction of Precast Concrete Tunnel Segmental Lining

    By Verya Nasri, Mehdi Bakhshi

    "Fiber reinforcement has emerged as an alternative to steel bars in precast concrete segments due to advantages such as saving cost and reducing production time while developing a more robust product

    Jan 1, 2016

  • SME
    Recursive Refinement of Geotechnical Design for Copenhagen Cityring Metro

    By Georgios Kafantaris, Carsten Bonde, Nataša Katic

    Within the investigation works for the Copenhagen Cityring metro, Geo/CMT have carried out 90 geotechnical boreholes. Together with the previously available investigation, this resulted in more than

    Jan 1, 2016

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • DFI
    Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power Facility

    By David Gatto, Nicolas A. Willig-Friedrich, Jeff A. Segar

    "With the increasing demand for electricity, and requirements to generate this power cleanly, more producers are turning towards hydroelectric power. A project in Iowa currently under construction wil

    Jan 1, 2016

  • DFI
    Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support Columns

    By Paul C. Schmall, Kevin Clarke, Paul J. Lewis, John M. Stanbury

    "The $200M rehabilitation of the more than 100-year-old Gowanus Flushing Tunnel and pumping station located on the Gowanus Canal in Brooklyn, NY required deep excavations in an extremely congested urb

    Jan 1, 2016