Search Documents

Search Again

Search Again

  • SME
    Tunneling Under Highway 401: Construction of Large Diameter Pre-Support Pipe Canopy - RETC2021

    By Tyler Lahti, Peter Borgacci, Mary Jane Ferraro, Prakash Nadesparan

    Toronto Tunnel Partners (TTP), under contract to Metrolinx/IO, is constructing new twin rail tunnels under the Highway 401 & 409 interchange to accommodate additional tracks to support the GO Expansio

    Jun 13, 2021

  • AIME
    The "Lawrence" Mole - Equipment Reliability -The Key To Successful Rock Tunneling By Machine

    By William H. Hamilton

    Tunnel-driving capabilities in terms of feet per hour have advanced several hundred percent in the last century. Indications are that this capacity will double each decade for the next three decades.

    Jan 1, 1970

  • SME
    Encapsulated Oil Additive Application in Earth Pressure Balanced (EPB) Tunneling – A Case Study

    By Bryce Sullivan, Cliff Baratta, Ehsan Alavi, Timothy Dobbs, Lisa Mori

    "Soil conditioning is one of the main factors in successful application of EPB machines in tunneling projects, which involves changing the characteristics of the ground in order to make it suitable fo

    Jan 1, 2016

  • SME
    Improving Hard Rock Tunneling Through Comparison Of Laboratory And Field Tunnel Boring Studies

    By Levent Ozdemir, Russell Miller, Fun-Den Wang

    The full utilization of tunnel boring machines for excavation in medium hard and hard rock has been limited by insufficient knowledge of rock behavior under the action of mechanical cutters. An und

    Jan 1, 1974

  • SME
    Resolving Difficult Public Transportation Tunneling Problems through the Conduct of Industry Peer Reviews

    By Martin P. Schroeder

    "Challenges have emerged as subway systems age and as new tunnels are bored in congested corridors or in high-risk environments. To help public transportation agencies address tunneling challenges, th

    Jan 1, 2016

  • SME
    An Innovative Approach to Tunneling in the Swelling Queenston Formation of Southern Ontario

    By Michael Hughes, Paul Bonapace, Harry Charalambu, Stephen Rigbey

    Ontario Power Generation is building a 10.4-km water diversion tunnel in Niagara Falls, Canada. The tunnel is a two-pass, cast-in-place prestressed concrete-lined pres-sure tunnel with a nominal inter

    Jan 1, 2007

  • SME
    Recent Tunneling Experience Using Hydraulically Operated Haulage Systems In The German Harz Mountains

    By Rolf Lange

    Introduction The Harzwasserwerke, a public body of the Federal State of Lower Saxony, supplies drinking water to an area bordered by Braunschweig, Bremen, the Northern and the Western edges of the

    Jan 1, 1979

  • SME
    Tunneling Through a Buried Valley with a Hard Rock EPB Compatible TBM - RETC2021

    By William Hodder, Ehsan Alavi, Nader Ghasempour, Daniel Cressman

    The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel (CBT) Project in Toronto will extend approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north

    Jun 13, 2021

  • SME
    Tunneling Success at Denver’s Platte to Park Hill Project is a Team Effort

    By William Gleason

    "The city of Denver, CO has experienced extreme growth in the past decade, with the population of the city topping more than 700,000 people in 2018. The current storm water drainage system was put in

    Jan 9, 2018

  • SME
    Underground Tests Of The Ream Method Of Rock Fragmentation For High-Speed Tunneling

    By Robert G. Lundquist

    REAM (for Rapid Excavation And Mining) is a method of rock fragmentation by high-velocity projectile impact developed by Physics International Company. This paper reports the results of field testing

    Jan 1, 1974

  • SME
    Tunneling Performance And Geotechnical Aspects Of Los Angeles Metro Rail Contract A-171

    By Saied S. Navid, Michael A. Piepenburg, Richard F. Escandon, Robert C. Lindsay

    INTRODUCTION Phase I of the Los Angeles Metro Rail Project, known as MOS-1 (Minimum Operable Segment-1), is the first phase of the 27 km± (17 mi) subway starter line. MOS-1 is currently under const

    Jan 1, 1989

  • SME
    Tool Wear Issue in Soft Ground Tunneling, Developing a Reliable Soil Abrasivity Index

    By Ehsan Alavi Gharahbagh

    Tool and cutterhead wear is a crucial issue in soft ground tunneling, especially because tool inspection, maintenance, and replacement are done under difficult conditions, and often under pressurized

    Jan 1, 2010

  • SME
    Crossing an Environmentally Sensitive Shore Area— Micro-Tunneling in the Australian Outback - RETC2021

    By Taner Aydogmus

    The A$29 billion Chevron-operated Wheatstone Project is one of Australia’s largest resource projects. Located at Ashburton North, 12 kilometers west of Onslow in Western Australia, the project will co

    Jun 13, 2021

  • SME
    Abrasivity and Cutter Life Assessment for TBM Tunneling in Cobbles and Boulders - RETC2021

    By Steven W. Hunt, Glen R. Frank

    Assessment of abrasivity and cutter life are necessary to properly manage risks when tunneling in mixed face ground which includes ground with cobbles and boulders. Maximizing cutter life requires: (1

    Jun 13, 2021

  • AIME
    An Evaluation Of Heat-Weakening Hard Rock As An Assist To Mechanic& Tunneling

    By W. R. Davison, C. A. Brown, J. P. Carstens

    INTRODUCTION The phenomenon of heat-weakening of rock with 10.6 micron radiation from a continuous-wave C02 gas laser has been investigated in detail at the Massachusetts Institute of Technology for o

    Jan 1, 1971

  • CIM
    Improvement of Penetration Prediction in TBM-Tunneling by Performing on-Site Penetration Tests

    By K. Thuro, L. Wilfing, H. Kasling

    "In mechanized tunneling, performance prediction is a crucial issue for estimating excavation costs and construction time of a tunnel project. The aim of this work is to compare the calculated paramet

    Jan 1, 2015

  • SME
    Control of Ground Movements Due to Tunneling with an Earth Pressure Balance TBM

    By Sakai Kunito, Nigel B. Sugden

    If an Earth Pressure Balance (EPB) TBM is operated effectively tunneling can be carried out producing negligible ground movements. Using the methods given in this paper face losses of the order of 0.5

    Jan 1, 2001

  • SME
    High-Frequency InSAR Displacement Monitoring and Trend Detection Analysis for Tunneling Projects - RETC2021

    By Marie-Josée Banwell, Cyriac Sebastian, Giacomo Falorni, Sara Del Conte

    Interferometric Synthetic Aperture Radar (InSAR) is a satellite-based monitoring technique that complements other in-situ methods for detecting and measuring surface displacement. Recent advances in d

    Jun 13, 2021

  • SME
    The Effect Of Rock Type And Tunneling Machine On Bulk Material Handling Parameters

    By Donald E. Raab, Lee W. Saperstein

    INTRODUCTION The Premise Not much time has to be spent in a tunneling project to realize the tremendous interdependence that exists among the various unit operations. The research that is to be

    Jan 1, 1974

  • SME
    Performance Requirement of Immediate Ring Closure Method for Difficult Ground Conditions in Conventional Tunneling

    By Nobuharu Isago, Atsushi Kusaka, Kosuke Kawata, Dohta Awaji

    "The immediate ring closure method, in which the entire periphery of the excavation area is closed immediately with an initial support within a short distance from the excavation face, has been increa

    Jan 1, 2016