  • SME
    Exploration Of One Of The World's Largest Iron-Ore Districts Brazil's Serra Dos Carajas

    By Arthur W. Ruff

    Estimated reserves of high-grade iron ore at Serra dos Carajás total 16 billion metric tons and have an average grade of 66.7 percent iron, 2.2 percent combined silica and alumina, and 0.05 percent ph

    Jan 1, 1973

  • SME
    Brightwater?s Ballinger Way Portal Presents Deep Shaft Ground Freezing Challenges

    By James D. Nickerson

    Thee Brightwater water treatment facilities, currently scheduled to be completed in 2010 and begin operating in 2011, will serve the northern part of King County, WA. The facility includes a new trea

    Jan 1, 2009

  • AIME
    Fires In Metalliferous Mines.

    By George J. Young

    (Cleveland Meeting, October, 1912.) I. GENERAL. THE recurrence of mine-fires in Nevada during the past decade is not only a matter of interest, but also one of considerable concern to engineers and

    Oct 1, 1912

  • SME
    Metropolitan Boston Transit Authority Red Line Project Harvard Square To Porter Square Tunnels Cambridge, Massachusetts

    By Daniel F. Meyer

    INTRODUCTION The Metropolitan Boston Transit Authority (MIA) Red Line has served greater Boston commuter needs from its Harvard Square terminus since its opening in 1912. Since then, the population

    Jan 1, 1983

  • SME
    Levels of Geotechnical Input for Design-Build Contracts

    By Joseph P. Gildner, Michael S. Kucker, Robert A. Robinson

    Considerable controversy seems to exist over the extent and nature of information that should be provided in design-build type contracts. Much of this controversy may relate to the types of owners, ra

    Jan 1, 2001

  • SME
    Size Preparation Of Coal For Synthetic Fuel Processes

    By J. P. Matoney

    In recent years, the diminishing supply of natural gas has led energy suppliers and consumers to consider making synthetic natural gas from coal. A number of processes have been devised to produce gas

    Jan 1, 1977

  • CIM
    Defining in-situ block size

    By M. Grenon

    "The presence, size, orientation, nature, and persistence of geological discontinuities dictate the behaviour of a rock mass. Block size, which is defined by discontinuity spacing, by the number of jo

    Jan 1, 1998

  • SME-ICGCM
    Combined Effects of Rock Bedding Orientation and Topography on Stresses Around Mine Openings

    By Amirhossein Molavi Tabrizi

    In this paper we introduce a realistic model for mine openings that explicitly considers the effects of local irregular topography. Also, we consider the effect of entry orientation and rock anisotrop

    Jan 1, 2014

  • CIM
    The Sullivan Mine

    By D. L. Thompson

    Foreword The complete history and early development of the Sullivan mine was fully covered in a paper entitled 'The Development of the Sullivan Mine and Processes for the Treatment of its Ores

    Jan 1, 1929

  • SME
    Mixed Traffic Autonomy and Functional Safety - A contradiction?

    By George Biro, Christoph Mueller

    A number autonomous operations is in place in several, mainly in fenced areas, where safety is assured by locking off the entire area for other traffic. However autonomy can be brought much further if

    Jun 25, 2023

  • NIOSH
    IC 8252 Mercury

    By BUREAU OF MINES

    Mercury has been used by mankind since prehistoric times. It has been, and is now, widely used in industry and medicine and has unique properties which make direct substitution difficult or impossible

    Jul 1, 1964

  • NIOSH
    OFR-72-79 Feasibility Of Longwall Mining In Non-Fossil Fuel Deposits.

    By Kenneth Wardell

    Those flat lying, bedded or replacement, non-fossil fuel deposits which exist within the U.S.A., and which are amenable to longwall mining, are identified by reference to three principal factors assoc

    Jan 1, 1978

  • SME
    Challenges And Solutions To Designing Deep Excavations For Urban Transit Stations

    By Ching-Liu Wu, John Hawley, Andrew H. Liu, James Chai

    The Hatch Mott MacDonald/Bechtel Joint Venture team is designer and construction manager for the 5.25-mile Tunnel Segment of the overall 16-mile Silicon ValleyRapid Transit Project, which extends the

    Jan 1, 2007

  • SME
    70-Foot-Deep Sheet Pile Cofferdams Driven by the Press-In Piling Method

    By Takayuki Sakai, Takefumi Takuma, Lee Roesner

    "70-foot deep rectangular-shaped bulkheads were built with sheet piles as launching and receiving shafts for a pipe jacking operation for new underground waterlines in a densely populated section of L

    Jan 1, 2016

  • SME
    The DC WASA Anacostia River CSO Control Tunnel Project

    By David C. Girard, Larry Williamson, Leonard R. Benson, Ronald E. Bizzarri

    On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and floo

    Jan 1, 2007

  • IOM3
    Official opening of Tunnelling '94 by Lord Mackay of Ardbrecknish

    By J. J. Mackay

    The Parliamentary Under-Secretary of State at the UK's Department of Transport introduced the symposium, approved its emphasis on environmental planning and the mitigation of environmental impact, dis

    Jun 16, 1905

  • SME
    The Use of Polyurethane Resins in Tunnel Grouting

    By Peter J. Borchardt, Helen M. K. Andersson, Donald A. Bruce

    Grouting is a useful engineering tool for tunnels throughout the world. A wide variety of methods and materials are used, reflecting the broad range of geological, hydrogeological, and structural dema

    Jan 1, 2001

  • SME
    Some Recent Developments in Ground Treatment for Tunnelling

    By A. Perelli Cippo, R. Granata, D. A. Bruce

    During the last few years, significant advances continue to have been made in aspects of grouting technologies used for ground treatment in advance of tunnelling. In permeation grouting, fundamental r

    Jan 1, 1993

  • SME
    Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct Tunnel

    By C. D. Hebert, M. R. King

    The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with

    Jan 1, 2007

  • ISEE
    Constructing a Decline Truck Entrance Tunnel Into Rock Reserves Located Beneath a College Campus

    By David R. Holberg

    In the Kansas City metropolitan area, mineable Bethany Falls Limestone occurs 80 ft below river level under the 700 acre Park College Campus on the north bank of the Missouri River at Parkville. For 2

    Jan 1, 1997