Search Documents

Search Again

Search Again

  • DFI
    The Road To Innovation In Geotechnical Construction

    By Peter J. Nicholson

    During my more than 40 years in the practice of underground construction and engineering, the industry has seen progress from the dig down to rock or hardpan or alternatively drive concrete or steel i

  • NIOSH
    RI 4170 Lead, Zinc, Silver. Copper, Bismuth Deposits, South Hecla Mine, Alta. Salt Lake County, Utah

    By John I. Kasteler, John H. Hild

    "INTRODUCTION The South Hecla mine, one of the principal mines of the Alta United Mines Co., is situated at Alta in thee Little Cottonwood mining district, about 30 miles southeasterly from Salt Lake

    Jan 1, 1948

  • AIME
    Development of the Benguet Mining District

    By CLYDE M. EYE

    THE Sub-province of Benguet is in the North Central part of the Island of Luzon. Baguio, the capital, is situated on a piateau 5000 ft. above sea level, and is the main health resort of the Philippine

    Jan 1, 1930

  • DFI
    Prescriptive Specification Design: The Impact on Cost and Constructability – Case History

    By Shawna Munn, Nadir Ansari, Allison Bennett

    "This paper outlines how specification driven design has made Toronto Area transit infrastructure projects more expensive than similar private projects, and provides a case study of the results of an

    Jan 1, 2017

  • NIOSH
    Experimental Investigation of Inlet Bias in the 10-mm Dorr-Oliver Cyclone

    By K. Kar, M. Gautam, J. T. Jurewicz

    The 10-mm Dorr-Oliver cyclone has been widely used as a personal sampler for size selective sampling of particles within the respirable range (Dp < 10 gm). Because of their inertia, the particles are

    Mar 1, 1992

  • DFI
    Integration Of Real Time Pile Design By Means Of Building Information Modeling

    By Prof. Dr. -Ing. habil. Sascha Henke, Johannes Beck

    The growth of Building Information Modeling (BIM) during recent years opens possibilities for integrating new digitally driven design approaches. While parametric design and algorithmic design slowly

    May 1, 2022

  • ISEE
    Journal: A Case Study of Full-Face Blasting in a Highway Tunnel in Korea

    By Hae-Moon Choi, Sang-Don Lee, Chang-Ha Ryu

    The purpose of the study presented in this article is to establish a standard blast pattern to yield optimum blasting performance along with an attempt to reduce a difference between design and constr

    Jan 1, 2006

  • SME
    Assessing Ground Ahead Of TBm Tunnel Using Low-Interruption Wireless Seismic Reflector Tracing System

    By Takuji Yamamoto

    High-speed TBM excavation requires rapid ground assessment ahead of excavation, particularly in complex grounds. The Tunnel Reflector Tracing technology (TRT) developed by authors, uses seismic reflec

  • NIOSH
    BOM List of Bureau of Mines Publications and Articles, January 1, 1970 to December 31, 1974. With Subject and Author Index.

    By Rita D. Sylvester

    "This compilation lists and summarizes publications by Bureau authors published in the regular Bureau of Mines series, in scientific, technical, or trade journals, or in other media; those available f

    Jan 1, 1975

  • SME
    No. 7 Subway Extension Crossing Under An Existing Subway Station: Challenges And Integration Of Underpinning Into The Design Of New Tunnels

    By Aram Grigoryan

    This paper addresses the challenges of designing the underpinning of major sub-way station with 4 operating tracks. No. 7 subway extension crosses under the existing 42nd street subway station on the

  • SME
    The Northwest Side Relief Sewer Tunnel—Challenges Became Success Stories

    By Faruk Oksuz, Clay Haynes, Miguel Sanchez, Patrick Finn, Roger J. Maurer

    The Milwaukee Metropolitan Sewerage District’s (MMSD)’s challenges of basement flooding and wet weather sewer overflows are being creatively addressed with the Northwest Side Relief Sewer tunnel. The

    Jan 1, 2005

  • SME
    Accessing Deep Ore Bodies Using Mechanical Excavation Equipment

    By W. Burger

    For the development of deep hard rock mines fast access to the orebody is critical. In some cases the mineralized area is more than 1500 m (5000 ft) below surface. Excavation of shafts or declines is

    Jan 1, 2010

  • SME
    Getting the Right Contract Package

    By W. W. Edgerton

    Construction projects may be delivered under one contract package or multiple packages divided by discipline, geographic location, or other characteristics. Dividing the construction into contract bid

    Jan 1, 2008

  • NIOSH
    IC 7562 Report of the Health and Safety Division, Fiscal Year 1949

    By W. J. Fene, J. J. Forbes

    Through education, investigations, and studies and an expanded coal- mino inspection program the Bureau continued to dischargo the responsibility placed on it by Congress 39 years ago for promoting sa

    Apr 1, 1950

  • SME
    Use Of Seismic Techniques In Analyzing Subsurface Materials

    By C. R. Fahnestock

    One of the major problems for us in the earthmoving industry is the analysis of materials under the ground surface. Countless engineering and construction jobs would be simplified if there were an ine

    Jan 1, 1961

  • NIOSH
    OFR-112-79 Research Study Of Continuous Haulage From Open Pit Mines

    By W. G. Freeman

    It is unlikely, as In the past, improvement in truck efficiency and capacity can fully offset the effects of inflation, fuel costs/shortages and ever increasing haul distances. There-fore, investigati

    Jan 1, 1978

  • CIM
    Selecting Advanced Constitutive Models: An Overview

    By A. O. Sfriso

    "Numerical modelling is becoming universal in rock engineering practice. Most applications focus on the prediction of failure loads of 2D problems, where the numerical models are useful extensions to

    Jan 1, 2015

  • SME
    Transshipping Of Western Coal - Concept And Design

    By A. T. Yu

    There are compelling reasons for us to look to our Country&apos;s Western coal. Despite its inherent low BTU content, Western coal&apos;s low sulphur content provides a near-ideal answer to satisfy ou

    Jan 1, 1975

  • SME
    Mechanical Mining: Challenges And Directions (c8b95d9b-ecb1-4029-afa0-4eafe1d3a768)

    By R. E. Gertsch

    Mechanical mining holds great promise for the mining industry. Realizing this promise depends on giving mine operators the capability to evaluate the higher production, the lower costs, and safety enh

    Jan 1, 1994

  • SME
    Construction — You need risk-based cost estimating

    By A. Moergeli, Philip Sander, John J. Reilly

    "Estimating and managing the costs of complex infrastructure projects – in the planning/design and construction phases, for both owners and contractors – has been a challenge for decades. The more com

    Apr 1, 2016