Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Blast Vibration Predictions, Damage Assessment and Vibration Monitoring for a Medical Center Expansion
By D. Lee Petersen, Travis Davidsavor
The 2003-2004 expansion of a Duluth medical center required rock blasting adjacent to the existing structures, a Mn/DOT retaining wall and other urban structures. This case history describes the metho
Jan 1, 2010
-
Simulation of Large Displacements in Jointed Rock Masses by using a 3-D Block-Spring Model
By Guangyuan Li
A 3-D block-spring model (BSM) has been developed for simulating the behaviour of jointed rocks. The model uses a discontinuous formulation and an iterative procedure to solve the large displacements
May 1, 2001
-
Pre-Set Delay Electronic Detonators: Merits Opposite Programmable Systems
By C Robertson, J Campos
The South African mining industry first experienced en-masse use of electronic detonators in the Narrow Reef environment using AELÆs ElectrodetÖ pre-set delay system. In recent years, programmable sys
Jan 1, 2001
-
Preliminary Implementation of a Predictive Control for Ventilation Systems in Metro Stations
By M. Vaccarini
In this paper a possible methodology to supplement a predictive control approach is reported. The benefits deriving from the application of a predictive control on complex buildings lay on its capabil
Aug 1, 2013
-
Estudio estadístico de los accidentes de trabajo ocurridos en las concentradores de la Cerro de Pasco Corporation en el quinquenio 1958-1962
By José Tagle Buenaño
El presente trabajo describe estadísticamente el porcentaje de accidentes de trabajo comprendidos entre el quinquenio 1958-1962 en las cuatro plantas concentradoras de la Cerro de Pasco Corporation. E
Aug 20, 1963
-
A Practical and Efficient Steel King Beam Structure Design Methodology at Slope Bottom Intersections
By Stankusm John C., Xiaoting Li
"Quantitatively identifying the load on a steel king beam set is a complicated issue in designing the king beam structure at the slope bottom area. From an engineering perspective, understanding the n
Jan 1, 2018
-
Hutchinson Mine - A Problem In Coal Mine-Drainage
By Ernst P. Hall
The Irwin Basin. (Fig. 1)* is a synclinal or shoe-horn *Figure numbers throughout refer to color slides not included with the preprint shaped basin in the Pittsburgh Coal Seam, It is approximately 10
Jan 1, 1959
-
An Analysis Of Fiber-Reinforced Round Panel Strengths And Comparison To Wire Mesh Bag Strength
Researchers at National Institute for Occupational Safety and Health (NIOSH) are investigating how fiber-reinforced shotcrete mix designs can be extrapolated from proven designs employing wire mesh.
Jan 1, 2010
-
Designing And Modeling Wireless Mesh Communications In Underground Coal Mines
By K. R. Griffin
New and developing communication systems enable underground miners to not only connect to the surface from an increased communication coverage area but also to be discovered in the event of an emergen
Jan 1, 2010
-
Engineering Tools for Design, Analysis and Information Management Applied to Underground Drilling and Blasting
By D La Rosa, G Power, K Riihioja
In underground mining, the often unpredictable variability in ground conditions may lead to the application of suboptimal drilling and blasting patterns, resulting in poor performance. Experience and
Jan 1, 2001
-
Who Needs Diesel Engines In The Mining Industry?
By S. O. Ogden
As most of you have probably surmised from the title of my paper, I am here today to talk with you about the use of diesel engines in the American mining industry and whether or not the free choice to
Jan 1, 1978
-
Designing and modeling mesh communications in underground coal mines
By Michael E. Karmis
New and developing communication systems en-able underground miners to, not only connect to the surface from an increased communication coverage area, but also to be discovered in the event of an emer
Jun 1, 2010
-
Mineral Economics ? Hectic Rush of 1943 Ended ? More Thought Given to Postwar Conditions
By AIME AIME
FOR the mineral industry, as for many others, the year 1944 brought to fruition the seeds planted in previous war years. Accomplishment in attaining ends in the production of minerals has given more t
Jan 1, 1945
-
Unique construction methods employed for a ventilation raise at Petro-Canada's Kipp coal project
By S. A. G. Poppen, J. Konopka
"Petro-Canada's project investigative and experimental underground work in the Galt coal seam at Kipp, Alberta included the construction of an emergency egress and ventilation raise from surface.
Jan 1, 1983
-
Effects of obstructions, sample size and sample rate on ultrasonic anemometer measurements underground - SME Transactions 2011
By C. D. Taylor, A. L. Mazzella, A. L. Martikainen
In fluctuating airflow, continuous air velocity recording is the most reliable method of air velocity measurement. It allows for fast recognition of changes and the calculation of long-term averages.
Jan 1, 2011
-
Open Pit TBM Driven Drainage Tunnel?Ok Tedi Mine
By Tony Peach
Project Description The Ok Tedi Mine is located approximately 18 km east of the Papua and New Guinea-Indonesia border, on the southernmost extremity of the Star Mountains Range, it is situated almost
-
Planning And Development Of The Deserado Mine - Rangely, Colorado
By Don L. Deardorff
The Deserado Mine and transportation system is the fuel supply portion of the Bonanza Power Plant project. Deserado Mine con¬sists of an underground mine with a capacity of 1,224,700 tonnes (1,350,000
Jan 1, 1984
-
Mine Cars of Canada
By G. C. Lipsyy
ALL mineral production? of Can11.da is transported in a mine car at some stage during its extraction. There are as many types and varieties of mine cars as there are of mines. Many of the cars in use
Jan 1, 1945
-
OFR-59-81 Considerations For The Certification Of Blasters
By John R. Coulson
Each State and the Federal Government was surveyed for existing certification requirements, the industry yes surveyed for the needs for training blasters, and the training that was available. Recommen
Jan 1, 1980
-
Proceedings Of The One Hundred And First Meeting, San Francisco; October, 1911
By AIME AIME
GENERAL COMMITTEES. SAN FRANCISCO:-ExECUTIVE, Hon. William C. Ralston, Chairman; RECEPTION, Prow. Samuel B. Christy, Chairman; SESSIONS, Frederic W. Bradley, Chairman; PRESS, H. Foster Bain, Chairma
Nov 1, 1911