Search Documents

Search Again

Search Again

  • SME
    East Side Access - Segmental Lining Design Challenges for Closely Spaced and Shallow Tunnels

    By D. I. Smith

    Constructing tunnels in congested urban areas requires tunnels to be placed closer together and with less cover than was previously necessary. Contract CQ031 of New York?s East Side Access project wil

    Jan 1, 2008

  • SME
    Risk Management In Action—Controlling Difficult Ground By Innovation

    By A. Moergeli

    The Swiss are building the world’s longest tunnel, the 57-Kilometer (35-mile) long Gotthard Base Tunnel. Lot 252, Tunnel Amsteg: Two Hard Rock Tunnel Boring Machines (TBM) crossed hydro-thermally deco

    Jan 1, 2007

  • SME
    Design of Bored Tunnels on the Channel Tunnel Rail Link, UK

    By Eddie Woods, Jon Hurt, Roger May, Paul Watson

    The Channel Tunnel Rail Link (CTRL) will be Britain’s first major new railway for over a century—a high-speed line running for 109km (68 miles) between St. Pancras station in London and the Channel Tu

    Jan 1, 2003

  • AUSIMM
    Model Study of the Stability of the Rock Surrounding A Tunnel

    By Junpeng L, Huiguo Q

    Field instrumentation was installed to monitor ground and lining behaviour during and after construction of the Mount Shaughnessy Tunnel (Rogers Pass Short Tunnel) in Canada. The instrumentation w

    Jan 1, 1987

  • AUSIMM
    Monitoring of A Railway Tunnel Excavated Through Bouldery Soil

    By Thomson S, Eisenstein Z

    Field instrumentation was installed to monitor ground and lining behaviour during and after construction of the Mount Shaughnessy Tunnel (Rogers Pass Short Tunnel) in Canada. The instrumentation w

    Jan 1, 1987

  • SME
    The Geology, Geotechnics and Monitoring of the Thames Tunnel

    By Thomas Schultheis, William Heron, Paul Watson, Colin Warren

    This paper describes the geology and geotechnics associated with construction of the Thames Tunnel, part of the UK’s Channel Tunnel Rail Link (CTRL). The 2.5km long twin tunnels run beneath the river

    Jan 1, 2003

  • ISEE
    Tunnel Lining Removal and Excavation by Controlled Blasting

    By Jeff Hammer, John McGregor

    "The Twin Tunnels, originally constructed in 1964, have become a major choking point for trafficheading up to and returning from the Colorado high country along the I-70 corridor. To increase traffic

    Jan 1, 2016

  • SME
    Phased Approach to Stormwater Tunnel Rehabilitation

    By Todd Wanless

    This paper addresses the challenges experienced by the designer and three government agencies during implementation of major improvements for the Turkey Creek Tunnel in Kansas City, Kansas. The tunnel

    Jan 1, 2008

  • AUSIMM
    Planning and Design for Rehabilitation of a Long Road Tunnel in Himalayan Ranges, India

    By R K. Dayal

    Many transport tunnels show distress after few decades of construction. Owing to exorbitant cost of replacement, rehabilitation of tunnels has become inevitable and rapidly gaining attention/significa

    Jan 1, 1999

  • SME
    Environmental Advantages Of Highway Tunnels

    By Howard A. Jongedyk, Jerry Wachtel

    Advancements in tunneling technology and underground construction, plus rapidly rising costs of land, and a higher priority being placed on urban esthetics, make tunnels a more attractive option for c

    Jan 1, 1974

  • AUSIMM
    Tugun Bypass Tunnel Using Top-Down Cut-and-Cover Method

    By M Thomas, S Lambert

    The Tugun Bypass Tunnel in Gold Coast, Australia was constructed using diaphragm walls with the top-down cut-and-cover method to allow simultaneous construction of an airport runway extension above th

    Jan 1, 2008

  • AUSIMM
    Smoke Duct or No Smoke Duct for Road Tunnels

    By R Lau

    In recently completed road tunnel projects in Queensland, such as the Airport Link and the Clem7 tunnels, there is a smoke duct running along the roof of the carriageways to extract smoke in case of f

    Sep 17, 2014

  • SME
    Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel

    By Russel Delmar

    Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope

    Jan 1, 2008

  • CIM
    Cape Breton Development Corporation's experience with a tunnel-boring machine in coal measures

    By Dan Currie, Tom Lamb, J. Coady Marsh, Gary Landry

    "This paper describes the Cape Breton Development Corporation's experience with the Lovat M-300 tunnel-boring machine at the Donkin-Morien Mine. Between January 3 and December 21, 1984, the 7.6 m

    Jan 1, 1986

  • SME
    Tunnels - The Owners' Problems

    By T. J. Jr. Corwin

    This paper will cover the problems confronting an owner when planning and estimating the cost of a proposed tunnel. Three factors are known: the length, size and the time allocated for the completion

    Jan 1, 1974

  • SME
    High Speed Excavation By Drill & Blast With Mechanized Mucking System?Mitholz Railway Tunnels, Switzerland

    By Stig Eriksson

    In Switzerland two major railway systems as shown below in Figure 1 has recently been completed or is under construction: ¦Lötschberg, south of Bern which was commissioned in 2007 ¦Gotthard, south

  • SME
    Soft Ground NATM Tunnel Designs

    By Mohammad Irshad, Larry H. Heflin

    INTRODUCTION The planned 166 kilometer (103 mile) Metro rapid rail transit system in Washington, D.C. is being designed and constructed by the Washington Metropolitan Area Transit Authority. At the

    Jan 1, 1987

  • IOM3
    Tunnelling in a changing world

    By C. J. Kirkland

    25th Julius Wernher memorial lecture given at Tunnelling '91, sixth international tunnelling symposium held in London, 14-18 April 1991. The title gives the lecturer a chance to share some of the less

    Jun 13, 1905

  • SME
    Prestressed Concrete Pressure Tunnels

    By David T. Swanson

    The term "pressure tunnel" in the broad sense includes all hollow spaces, aligned along an axis and surrounded by rock, which are suitable for pressurization. In particular, this category includes:

    Jan 1, 1981

  • SME
    Stillwater Tunnel Project

    By Harold G. Arthur

    INTRODUCTION Stillwater Tunnel construction is scheduled to start in the spring of 1973. The tunnel will be the site of an extensive program in rapid excavation research. This paper presents a prog

    Jan 1, 1997