Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Electromagnetic Pulse Hazard Detection System
By David L. Moffatt, Leon Peters
A unique electromagnetic pulse sounding system for the detection and identification of geological and man-made anomalies which represent hazards in hard rock rapid tunneling operations is described. T
Jan 1, 1997
-
Construction Of Southwest Interceptor #3 And #4 Cleveland, Ohio
By Lawrence M. Lenahan
Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two con
Jan 1, 1989
-
Improved Monitoring Technique for Fractures in Underground Mine Openings
By M. G. Schuerger, D. W. Park
An improved gage for monitoring fractures in underground openings was successfully developed using the reflection photoelastic technique. The gage may be used to detect crack initiation in mine openin
Jan 1, 1984
-
New Roadheader-Type Continuous Shaft Sinking Systems
By Wilhelm J. Kogelmann
The concept and operation of novel shaft sinking systems utilizing roadheader-type cutter booms, including mucking, conveying, and hoisting installations, are described. Selection criteria, performanc
Jan 1, 1989
-
The Effects of Rock Mass Characteristics on Fragmentation in Controlled Blasting Experiments in Small Development Headings
By Chantale Doucet, Yves Lizotte, Alan Cameron
A joint Federal Government-Industry research project on the effect of geology on the fragmentation of rock excavated by blasting in underground developments was conducted at the CANMET Experimental Mi
Jan 1, 1996
-
Remotely Controlled Direct Pipe Jacking Experiences In Oakwood Beach Interceptor, Staten Island, NY
By Dipak D. Shah, Sajjan K. Jain
An interceptor sewer, 2103 linear meters (6900 Ft), 1.52 meter (5 ft) in nominal diameter, is installed by a direct pipe jacking system utilizing a remotely controlled fully automatic slurry shield ma
Jan 1, 1991
-
NS9 Drop Shaft And Ancillary Facilities - Contract I36G52 - Milwaukee, Wisconsin
By Patrick J. Doig
The NS9 Drop Shaft contract formed part of the Waste Pollution Abatement Program (WPAP) conducted by the Milwaukee Metropolitan Sewerage District (MMSD). The contract involved the construction of two
Jan 1, 1991
-
Preexcavation Deep-Hole Stress Measurements For Design Of Underground Chambers--Case Histories
By Bezalel C. Haimson
Long before excavation begins, the in situ stresses in the horizon of planned underground chambers can be measured by employing the hydrofracturing technique in existing exploratory holes. Such measur
Jan 1, 1976
-
Automation of a Mobile Miner
By John Turner, David Carey
The Robbins Mobile Miner demonstrates the successful combination of hard rock excavation technology and the latest electronic control technology. The mobile miner, a partial face hard rock tunneling m
Jan 1, 1993
-
HDPE As A Gas And Water Barrier The Los Angeles Metro Red Line Experience
By Stephen J. Navin
The Los Angeles Metro Red Line has installed high density polyethylene (HDPE) as a gas and water barrier around all subsurface structures. The paper reviews the geological setting and resulting need f
Jan 1, 1991
-
Blast Parameters for the Nagagami Hydro-Electric Project Tailrace Plug Blast, Utilizing Long Round Jumbo Technology
By Joseph Keenan
In March of 1994, Dynatec Mining Limited entered into a contract with PCL Civil Constructors to carry out the underground excavations for the Algonquin Power Corporation’s15 Megawatt Nagagami hydro-el
Jan 1, 1997
-
Where Have All the Processing Plants Gone?
By Joel Lenz, Warren Hood, Jackson Jenkins
Whole ore or other process streams are being transported from mines to remote processing facilities for multiple reasons, such as improved project economics, maximum utilization of capital, and minimi
Jan 1, 1998
-
Careful Blasting (125,000 cu.m) for a Shopping Centre in Downtown Helsinki
By R Vuolio, B A. Jonsson
In the center of Helsinki - capital of Finland - extensive blasting operations were carried out during the years 1982 - 84. At the corner of the streets Mannerheimintie and Simonkatu - in the Forum bl
Jan 1, 1985
-
The Excavation Of The Roosevelt Island Valve Chamber New York City
By Edward M. Dowey
This paper presents the excavation of the Roosevelt Island Valve Chamber, the final of three chambers in Stage One of New York City's Third Water Tunnel. The valve chamber and passageways 13 3
Jan 1, 1987
-
Development of an Anti-Vibration Handle for Pneumatic Jackleg Rock Drills
By Marcotte P.
Introduction Pneumatic jackleg rock drills are commonly used in underground mining operations. These tools are known to expose their operators to hand-arm vibration levels in the order of 20-35 m/s2
Feb 1, 2008
-
The Effectiveness Of On-Board Suppression Systems To Prevent The Propagation Of Methane Ignitions Under Simulated Coal Mining Conditions
By B. Genc
After the explosion at Middelbult Colliery, South Africa in May1993, which claimed 53 lives, the South African Coal Mining Industry and the Safety In Mines Research Advisory Committee (SIMRAC) united
Jan 1, 2002
-
Primary Blasting at Cananea
By K. R. Crocker
PRIMARY blasting at the open pit of the Cananea Consolidated Copper Co. has been developed to meet several conditions peculiar to the operation. Mining at Cananea is not confined to the open pit but i
Jan 6, 1950
-
Hydrologic Investigation, Design, and Construction of Flood Control Structures, Copperhill, Tennessee (96d41880-4818-4889-867f-3b0c0f66f520)
By T. Turner, C. L. Zimmerman, U. Kappus
The purpose of the project is to divert flood flows of North Potato Creek. The project is located in the southeast corner of Tennessee near Copperhill, approximately 160 km north of Atlanta, GA. The p
Jan 1, 1981
-
Computer Based Decision Support Systems For Underground Construction
By Photios G. Ioannou, Guillermo F. Salazar, Herbert H. Einstein, Yeong W. Kim
The MIT tunneling group has developed, over the past decade, a number of decision support tools for the geologist and engineer, planner and designer, owner and contractor involved in underground const
Jan 1, 1987
-
Considerations for the Excavation of Subsurface Facilities by Drill and Blast Methods, Yucca Mountain Project
By Roger Keller, Jason Ryan
A number of studies have evaluated excavation methods for the construction of subsurface facilities for a potential deep geologic repository for the disposal of nuclear waste at Yucca Mountain, NV. Ma
Jan 1, 2001