SFRC Segmental Lining Design for a Pressurised Tunnel
By Sotiris Psomas, Colin M. Eddie
"Steel Fibre Reinforced Concrete (SFRC) Segmental Tunnel Linings have successfully been used for over 20 years in the UK and have been adopted in a number of high profile projects such as High Speed 1
Jan 1, 2016
-
Structural Fire Protection to NFPA 502 - Performance-Based Design and Assessment of Passive and Active Fire Protection Systems
By Robinson Leon-Diaz, Alberto Jaen-Toribio, Raymond Blanchard, Mike Deevy, Miguel Fuentes-Llanos
"Tunnels designed to NFPA 502 are required to withstand the RWS time-temperature curve, more specifically prevent progressive spalling and loss of strength of steel reinforcement. Fire boards or spray
Jan 1, 2016
-
New Haven Paper - Driving Headings in Rock Tunnels
By W. L. Saunders
This paper deals specifically with heading-driving as distinguished from the broader term tunnel-driving. A heading is a pilot or path-finder for the main tunnel. Some headings are complete tunnels in
Jan 1, 1910
-
IC 7568 Methods of Excavation and Roof Support used in some recently constructed tunnels
By S. P. Polack
"INTRODUCTION The purpose of this circular is to correlate the information obtained during personal investigations at the sites of four rock tunnels in the process of construction and information obta
May 1, 1950
-
The Risks Associated with TBM Procurement and the Next Steps toward Industry Change
By Gary Brierley, Lok Home
"The majority of tunnels for civil engineering applications are now being constructed using some form of mechanical excavation. Beginning in the 1960s with rock tunnel boring machines (TBM), the tunne
Jan 9, 2018
-
Critical Blast Design of a New York City Shaft and It's Effect on Vibration Control
By Eric Reale
The New York City Department of Environmental Protection (DEP) is currently building City Water Tunnel #3 beneath the city. The purpose of this tunnel is to improve water distribution to the city and
Jan 1, 1989
-
Study on the Characteristic of Stress and Deformation of Shallow Buried Tunnel under the Foundation of Bridge
By Xu Feng, Han Shufeng, Zhu Bin, Wang Mingming
Due to urban subway tunnels mostly built in the cities with highly density buildings, the geological and construction conditions is complex, especially certain sections of the subway tunnel will pass
Jan 1, 2015
-
Modeling the Post-Peak Strength Degradation on Tunnel Stability
By F. Y. Hsiao, H. C. Kao
Underground excavation in hard rock is normally stable at shallow depth except for wedge failure. However, the excavation depth is rapidly increasing recently. In high overburden stress condition, the
Jan 1, 2015
-
Freezing to Tanking: Challenges of the City Link Driven Tunnels
By Clive Wilson, Bruce Hutchison, Daniel N. Adams
Two three-lane highway tunnels, 700 and 2900 m long, make up the driven tunnels portion of Melbourne City Link. Tunnel construction, using design-construct delivery, commenced in May 1996. Constructio
Jan 1, 1999
-
Design and Construction of Dulles Airport Tunnels
By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field
With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn
Jan 1, 2007
-
The Code of Practice for Risk Management of Tunnel Works - Future Tunnelling Insurance from the InsurerÆs Point of View
The objectives of this paper are to introduce the International Code of Practice for Risk Management of Tunnel Works and to illustrate to the participants of the 13th Australian Tunnelling Conference
Jan 1, 2008
-
Mixed Face Tunnel Excavation Using Floating Crown Bar And Modified Spiling Methods
By Joginder S. Bhore, Francis M. Keville, David E. Puza, Roger C. Borggaard
A portion of the Massachusetts Bay Transportation Authority's Red Line Extension through Somerville, Massachusetts consists of 1,553cm (5,092 LF) of hard rock tunneling 6.7m (22 ft.) diameter hor
Jan 1, 1981
-
Lessons Learned: WMATA NATM Design and Construction
By Heflin. L.
The Washington Metropolitan Area Transit Authority, WMATA, has constructed over 92 revenue miles of rapid transit facilities including some 14 miles of rock tunnel and 12 miles of earth tunnel. The sy
Jan 1, 1993
-
Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand
By A D. Campbell
The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a
Mar 8, 2011
-
The Channel Tunnel : Construction Methods And Logistics
By Pierre M. Matheron
TRANSMANCHE-LINK is responsible for designing, developing and implementing the project for a fixed link under the English Channel, comprising two running tunnels of diameter 7.6 metres and a service t
Jan 1, 1987
-
Grouting And Excavation In The Construction Of The Seikan Tunnel
By Yutaka Mochida
OUTLINE Beginning in 1946, a careful geological survey was made of the Tsugaru Straits. In 1964, excavation of the exploratory tunnels were started to observe the characteristics of faults and rock
Jan 1, 1981
-
Planning, Investigation and Preliminary Design for the Eastern Distributor Tunnels - Sydney
By Chappel R. A, Fishburn B. R
The Eastern Distributor Tunnels - the first major road tunnel project in Australia - are the preferred solution to traffic congestion problems, when compared with alternatives, in this inner urban
Jan 1, 1987
-
Osha Underground Construction Standards Rules to Live by
By Harry R. Price, Jerome C. Neyer
INTRODUCTION Safety must be a primary consideration in the design and construction of tunnels. Tunnel construction has historically been considered a high-risk business. During the construction of
Jan 1, 1995
-
IC 8662 The Flathead Tunnel - A Geologic, Operations, And Ground Support Study, Burlington Northern Railroad, Salish Mountains, Montana
By Eugene H. Skinner
The 7-mile Flathead Tunnel, located in the central Salish Mountains of northwestern Montana, was constructed between 1966 and 1969, With the contract awarded April 19, 1966, drill and blast tunnel exc
Jan 1, 1974
-
Tunnel Euralpin Lyon Turin CO8-Design of Temporary Support Profile of Base Tunnels and Cross-Passages - NAT2024
By Elisa Comis, Barbara Bitetti, Julien Pepiot, Stefano Lione, Francesc Rich
The new Lyon-Turin railway project involves the construction of a 57 km twin-tube tunnel between France and Italy. Pini France (project leader) and Systra-SWS are the designers of Construction Site 8
Jun 23, 2024