Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Deformation, Failure and Stability of Tunnels in Squeezing Rocks
By Sun Y. L, Jiang J. J, Lu S. L
A distinguishing feature of tunnels in squeezing rocks is that a large deformation of the surrounding rocks takes place slowly and gradually, often called squeezing phenomenon. It is different from
Jan 1, 1995
-
Pushing the Envelope–Rehabilitation of the Cameron Run Tunnels
By Kurt Egger, Emily A. Baker
Rehabilitation work at the Cameron Run Tunnels entailed the restoration of seven heavily deformed, approximately 69 m long, steel liner plate supported culverts through a CSX Railroad embankment near
Jan 1, 2003
-
Instrumentation Of Tarbela Dam Tunnels
By S. F. Hillis, J. E. Rourke, K. A. Szalay, O&apos
INTRODUCTION For the past 25 years, tunnel support requirements have frequently been determined, at least in North American practice, by classifying the rock according to the system proposed by Ter
Jan 1, 1974
-
The Red Hook Intercepting Sewer - A Compressed Air Tunnel Case History
By Eugene F. Casey, John G. Ruggiero
INTRODUCTION Construction of tunnels in urban areas, especially reclaimed areas, pose many problems. The Red Hook Intercepting Sewer Tunnel, Contract 1A is a portion of the Red Hook Water Pollution
Jan 1, 1981
-
An Engineering Approach To Monitoring The Performance Of Soft Ground Tunnels During Construction
By C. John Dunnicliff, Birger Schmidt
INTRODUCTION To be effective and useful, monitoring of tunnel construction must be carefully planned throughout all steps. A vital and frequently overlooked step is a clear definition of the specif
Jan 1, 1974
-
A Comparison of Grouting Techniques over 30 Years in 1969 and in 1999 for Southern Nevada Water Authority’s Lake Mead Intakes
By Jon Y. Kaneshiro, Stephen J. Navin, Jerry Ostberg
In 1968, the U.S. Bureau of Reclamation awarded S.S. Mullen Construction of Seattle, the Intake Tunnel (488 m by 4 m diameter tunnel) and Pumping Plant No. 1. In1998, the Southern Nevada Water Authori
Jan 1, 2001
-
The Holland Tunnel (The Hudson River Vehicular Tunnel) (38a7990e-e710-479c-bacb-0e91e06668cb)
By Ole Singstad
THE legislatures of New York and New Jersey, determined in 1919 that a vehicular tunnel should be built under the Hudson River. On July 1, 1919, an engineering staff was organized with the late Cliffo
Jan 8, 1926
-
Gas Mitigation In The Mill Creek Tunnel
By R. Switalski, M. Schafer, R. Pintabona, M. Kritzer, B. Lukajic, S. Janosko
Methane gas caused an eight-month shutdown of mining operations at the Mill Creek, Phase 3, Tunnel. The gas-related shutdown occurred as the tunnel was advanced to an approximate distance of 2,700 fee
Jan 1, 2007
-
RI 2288 Bureau Of Mines Experimental Tunnel For Studying The Removal Of Automotive Exhaust Gas
By J. W. Paul, A. C. Fieldner
"In cooperation with the New York and New Jersey State Bridge and Tunnel Commissions, the Bureau of Mines has just completed the construction of an experimental tunnel in the Bureau's experimental min
Oct 1, 1921
-
The Fallacy of Tunnel Formwork Removal
By Wern-ping (Nick) Chen
In concrete lined tunnels, formwork removal timing may be controversial. Contractors seek to strip the form as soon as possible, and designers seek to keep the formwork in place as long as practical t
Jan 1, 2008
-
TBM cutting forces with particular reference to cutter and tunnel diameters
By S. Okubo, K. Fukui
Empirical equations established for estimating the rock strength of the working face based on the cutting forces of a tunnel boring machines (TBM) are further examined and discussed with respect to th
Jan 1, 2003
-
Emergency Repairs to Beach Interceptor Tunnel
By David Jurich, Joseph N. McDivitt
INTRODUCTION South Coast Water District (SCWD) operates the Beach Interceptor Sewer Tunnel(BIST) in South Laguna, Orange County, California between Monarch Beach and Aliso Beach (Figure 1). The 10,
Jan 1, 2007
-
Road Tunnel Protection by Water Mist Systems û Implementation of Full-Scale Fire Test Results into a Real Project
Truck fires in a tunnel can create heat release rates (HRR) significantly higher than 100 MW. Because of a fast spread of smoke and heat the self-rescuing period is shortened significantly. Furthermor
Jan 1, 2008
-
Optimization In Large Tunnels
By H. S. Rathor
NTPC (National Thermal Power Corporation), a multi-unit organization, is generating 26% of India’s total power. This power is produced from its 14 coal based stations and 7 gas based stations. NTPC is
Jan 1, 2005
-
Beach Sewer Tunnel Rehabilitation ? Introduction
By Albert Ruiz
South Coast Water District (District) operates the Beach Interceptor Sewer Tunnel (BIST) in South Laguna, Orange County, California between Mon-arch Beach and Aliso Beach (Figure 1). The 10,424-foot l
Jan 1, 2008
-
Project Delivery Models and Risk Allocation for Whole Life Tunnel Management
By D. Caiden, C. S. Covil, P. J. Chamley
The paper describes the background to alternative delivery models, drawing on international experience, and introduces Project Alliancing/Contract Partnering, common risks and risk sharing on tunnel p
Jan 1, 2005
-
Evinos-Mornos Tunnel – Greece Construction of a 30 Km Long Hydraulic Tunnel in Less Than Three Years Under the Most Adverse Geological Conditions
By Remo Grandori, Manfred Jaeger, Fabrizio Antonini, Luis Vigl
The EVINOS-MORNOS tunnel project with its 30 km of length is one of the longest hydraulic tunnel in the world realised with TBM method. The adverse geological conditions, the high cover and the sho
Jan 1, 1995
-
Rehabilitation of the Cape Creek Highway Tunnel Under Traffic
By Roberto J. Guardia, Tim Shell, Robert A. Robinson, Steve Rodolf
Our aging infrastructure includes numerous tunnels that provide easy access through topographic and societal obstacles. These tunnels are renewable resources that require periodic maintenance and reha
Jan 1, 2005
-
IC 8047 Methods In Driving The 5490 Railroad Tunnel, Kennecott Copper Corp., Salt Lake County, Utah ? Summary And Introduction
By V. T. Dow
This report describes construction details and methods used in driving the 5490 tunnel at the Kennecott Copper Corp, property, Bingham, Utah. The tunnel will provide railroad access to the world-famou
Jan 1, 1962
-
Short Tunnels with Shallow Cover
By David Smith
Construction of a new transportation link frequently requires crossing under an existing highway or railroad. Although traffic diversions may permit a cut and cover structure to be built, ‘zero impact
Jan 1, 2005