Search Documents

Search Again

Search Again

  • SME
    Conventional Excavation of Connecting Tunnels in C13 Metro Station (Poland–Warsaw—Line 2) - The Complex History of the Construction of Three Connecting Tunnels

    By Marco Aurelio Piangatelli, Massimiliano Bringiotti, Ferdinando De Angelis

    "The construction of the three connecting tunnels between the east side and the west side of station C13, adjacent to the Vistula river, has a long and complex history, as they cross beneath one of Wa

    Jan 1, 2016

  • AUSIMM
    Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground Conditions

    By M Norbert, D O’Connor

    The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set

    Sep 17, 2014

  • SME
    Exploring the Benefits of Additional Conveyance Tunnels for the Chicago Area’s Combined Sewer System

    By Kevin Fitzpatrick, Carmen Scalise, Patrick Jensen

    "The Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) owns and operates the Tunnel and Reservoir Plan (TARP) system which was adopted in 1972. TARP is a network of 110 miles of deep

    Jan 1, 2016

  • SME
    Settlements Due to Blasting Vibrations

    By Werner Bilfinger, Claudio Nahas, Marcelo Waimberg

    "INTRODUCTION The so called Porto Maravilha Project consists of the re-urbanization of a 500 ha area in the Rio de Janeiro port region. Several changes in local infrastructure are being implemented, i

    Jan 1, 2016

  • SME
    A Mechanized Tunnelling Innovation—Ring Pipe Jacking Method (RPJM)

    By Cheng Ang, Yun Bai, Zhi Liu

    "This paper presents a conceptual design of an innovative tunnelling method named the Ring Pipe Jacking Method (RPJ) which is conducted by the Ring Pipe Jacking Machine (RPJM). The RPJM consists of a

    Jan 1, 2016

  • SME
    A Designer's Viewpoint of Medium-Support Interaction

    By S. N. Chadha

    INTRODUCTION The work described here refers to the Genesee River Interceptor Southeast Project. This project is a part of the Combined Sewer Overflow Abatement Program, Phase I, for the Rochester P

    Jan 1, 1977

  • ISEE
    An Improved Technique for Predicting Vibration Levels from Tunnel Blasting

    By W. J. Birch, M. Kirke

    Despite increasing competition from mechanical methods of tunnelling, the drill and blast method is often still the most viable method of excavating tunnels in strong and abrasive rock. To advance a t

    Jan 1, 2005

  • AUSIMM
    Soft Ground Tunnelling in Melbourne - Investigation and Design of the Melbourne Main Reliever

    By M Dixon, T OÆShannessy

    Melbourne Water (MW) is responsible for a section of existing gravity trunk sewer servicing the Melbourne central business district, Docklands, Port Melbourne and other adjacent areas, known as the Me

    Jan 1, 2008

  • AUSIMM
    Managing Underground Risks in Singapore Through Geotechnical Interpretative Baseline Reports

    By L N. Loganathan

    Risk exposure in tunnel projects is extremely high due to various factors such as variability of subsurface conditions, selection of inappropriate design and tunnelling methods, improper risk assessme

    Jan 1, 2008

  • SME
    Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021

    By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White

    The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame

    Jun 13, 2021

  • SME
    Impact of High-Speed Operation on Tunnel Planning - NAT2024

    By Bernd Hagenah, Petr Pospisil, Colin Santangelo

    This paper explores the profound implications of high-speed train operation on tunnel planning, specifically investigating ongoing high-speed rail projects in California and Texas. The paper delves in

    Jun 23, 2024

  • SME
    The Bypass Tunnel: Excavation, Interliner, and Lining - RETC2021

    By George Schmitt, Ted Dowey, Grant Millener, Sean McAndrew, Eric Jordan

    The Rondout-West Branch Bypass Tunnel is being built to bypass a substantial leak in New York City’s primary water supply tunnel. The 13,500 foot long tunnel travels 600 feet under the Hudson River th

    Jun 13, 2021

  • SME
    How Correct are Geostatistical Models in Predicting Soil Transitions? - NAT2022

    By Hongjie Yu, Mike Mooney

    Transitions between geological/geotechnical soil units have a critical impact on the operation and performance of a tunnel boring machine (TBM). Geostatistics-based probabilistic modeling is used to q

    Dec 1, 2022

  • SME
    Overcoming Sustainability Challenges for Design and Construction of Urban and Long-Distance Tunnels - NAT2024

    By Bernd Hagenah, Eric C. Wang

    New tunnels of significant alignment lengths such as mountain tunnels, base tunnels, as well as beneath urban centers pose unique environmental challenges. This paper highlights key environmental cons

    Jun 23, 2024

  • SME
    Deep Rock Wastewater Tunnel in Delco - NAT2022

    By Dafydd Chandler, Milissa Hirst, Charles Hurst, Gary Snyder, Leszek Glodkowski

    The Delaware County Regional Water Quality Control Authority (DELCORA) will be adding tunnel infrastructure to its wastewater conveyance system. This program involves the construction of a conveyance/

    Dec 1, 2022

  • SME
    Understanding the Subsurface Conditions for the Cemetery Brook Drain Tunnel Project - RETC2023

    By Frederick McNeill, Mahmood Khwaja, Benjamin Lundsted, David Polcari, Michael S. Schultz, Timothy Clougherty

    The City of Manchester, New Hampshire, is embarking on one of its largest public works projects in history to construct a 12,000 foot long, large-diameter, conveyance tunnel through downtown Mancheste

    Jun 13, 2023

  • SME
    Evaluating Options in Design of the Akron Northside Interceptor Tunnel (NSIT) Tunnel Diversion and Flow Control Structure - NAT2024

    By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote

    The City of Akron will construct the Northside Interceptor Tunnel (NSIT) project to control and reduce combined sewer overflows. One component of the project a large diameter tunnel diversion / flow c

    Jun 23, 2024

  • SME
    Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023

    By Basilio Giurgola, Jeremiah M. Jezerski, Filippo Azzara, Federico Bonaiuti, Russell H. Lutch

    The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long, CSO tunnel, multiple underground connections, and significant surface works within an urban corridor. The NEBT align

    Jun 13, 2023

  • SME
    Sumner Tunnel Rehabilitation - NAT2024

    By Joe Rigney, Conrad Stacey, David Nowak, Chris Blanchard, Michael Beyer, John Czach

    Originally constructed in the 1930s, the 1-mile-long Sumner Tunnel is 31 feet in diameter and carries traffic deep below Boston Harbor, connecting Boston and East Boston. This project includes both de

    Jun 23, 2024

  • SME
    Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022

    By Adam Bedell, Jack Raymer, Brad Crenshaw

    Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There

    Dec 1, 2022