    Selection of Primary Support in the EastLink Tunnels

    By P Campi, M Dodds

    The EastLink project is a 39 km tollway to the east of Melbourne and includes twin three-lane 1.5 km driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the Mul

    Jan 1, 2008

  • AUSIMM
    Rock Excavation by Machine - A Comparative Study of Picks and Discs

    One of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing

    Jan 1, 1976

  • ISEE
    Techno-Economics of Blasting in Tunnels Using High Energy Slurries

    By Kate Satish

    M/s Konkan Railways Corporation are constructing 760 kms long rail road in the Western Coastal Region of India. The rail road encounters 75 tunnels through the Western Ghats of India with a total leng

    Jan 1, 1996

  • SME
    The Light at the End of a 40 Year Old Tunnel - Retrofitting of an Existing Tunnel as part of The New Second Ave Subway Project, New York

    By Richard Giffen, Michael Trabold, Pablo Lemus

    "As part of the new 2nd Ave Subway Project, an existing tunnel constructed in the 1970’s will be connected to the new subway and used as new running tunnels. The existing tunnel had to be modified to

    Jan 1, 2016

  • SME
    Construction Of Louisville Water Company?s Riverbank Filtration Tunnel And Pump Station Project

    By S. Holtermann

    Through the process of Riverbank Filtration (RBF), the Louisville Water Company plans to obtain a higher quality source of water for their B.E. Payne Water Treatment Plant (WTP) by means of four colle

  • AUSIMM
    The Measurement of Rock Stress for Tunnelling

    By I Gray

    While in some cases it is vitally important to measure the virgin stress in rock prior to tunnelling there are a number of cases where such stress measurement is really not required. The concept of ha

    Sep 17, 2014

  • NIOSH
    RI 4032 Diesel Engines Underground VI. - Use of Diesel Locomotives in Construction of the Delaware Aqueduct: Effect of Exhaust Gases upon Quality of Tunnel Air

    By M. A. Elliott, H. H. Schrenk, L. B. Berger, John C. Holtz

    "INTRODUCTION Diesel-powered locomotives designed specifically for underground operation were used in the construction of some of the tunnels that comprise the Delaware Aqueduct in New York State. Bef

    Jan 1, 1947

  • SME
    Lesson Learned During the EPB TBM Launch Using Umbilical and Muck Pump - RETC2021

    By D. Nebbia, R. Aliberti, F. Solesin

    The launch of a Tunnel Boring Machine (TBM) is one of the most challenging activity parts of the construction of a tunnel. Challenges are coming from limited space available, learning curve, concurren

    Jun 13, 2021

  • SME
    Robbins Tunnel Boring Machines At Work In Laos And Malaysia

    In late November 2010, a Laotian landmark was achieved for the country?s first tunnel boring machine - (TBM) driven tunnel. Italian contractor CMC di Ravenna celebrated the breakthrough of a 7.6-m- (

    Jan 1, 2011

  • SME
    The Cardiff Cable Tunnel

    By A. C. Lyons

    The presentation describes the history, preliminary report, site investigation, including examination of old records, design of tunnel including choice of levels, alternative linings and working sites

    Jan 1, 1981

  • SME
    Compaction Grouting Of The Phoenix Drain Tunnels

    By Steven R. Wardwell, Gerald G. Stokes

    INTRODUCTION A compaction grouting program to control ground loss, and to minimize surface settlement, was developed for the West Tunnel of the Phoenix Storm Drain Tunnels. The West Tunnel was 4,20

    Jan 1, 1987

  • SME
    Comparisons, Experiences And Development Of The Use Of Precast Concrete Tunnel Linings In Europe, North America And The Far East

    By A. John R. Hart

    INTRODUCTION In each given set of operational criteria for tunnel design, ground conditions dictate the selection of the most appropriate construction method and tunnel lining. The designer has the

    Jan 1, 1987

  • SME
    The Romeo Tunnels-Detroit, Michigan A Current Report On Rapid Excavation In Difficult Ground

    By Thomas W. Traylor

    Today, in Detroit, Michigan, a 14 ft. 6 in. diameter soft ground tunnel is being mined at penetration rates limited only by the logistics of liner handling and spoil removal. Soil conditions are highl

    Jan 1, 1997

  • AUSIMM
    The Race to Finish - From Design to Completion - 5 Km of Three Lane Road Tunnel in Three Years

    By G Munro

    he Melbourne City Link project will complete a missing link between two existing major freeways in the Melbourne road network, providing a much needed bypass of the Central Business District for throu

    Jan 1, 1999

  • AUSIMM
    Tunnelling in the Andes in Chile – By Drill and Blast and Tunnel Boring Machine

    By R Fletcher

    Pacific Hydro, a leading renewable energy company from Australia, is developing a series of cascading run-of-river hydro electricity projects in the Cachapoal Valley at the base of the Andes Mountains

    Mar 8, 2011

  • SME
    Project Clean Lake’s First Large Diameter EPB TBM in Cleveland, Ohio - RETC2023

    By Erica McGlynn, Brian Negrea, Lance Jackson

    There was no need for the people of Cleveland to ask “Where does the raw sewage go? We want to know!” because it was clear. The raw sewage was being discharged into Lake Erie during heavy rainfall eve

    Jun 13, 2023

  • SME
    A Computer Simulation Model For Application To Rapid Excavation Processes

    By Jan M. Mutmansky

    Simulation is a general term which commonly appears in the technical literature and which can have different meanings to different people. One interesting definition (9)* applicable in an engineering

    Jan 1, 1972

  • SME
    Chemical Consolidation In A Mixed Face Tunnel

    By Terence G. McCusker, E. Roy Anderson

    A four-mile length of interceptor sewer tunnel in Manhattan has finished sizes ranging from 10'6" to 14'6" horseshoe. Mixed face conditions were anticipated in three areas and encountered in

    Jan 1, 1997

  • SME
    Design And Construction Of The Ahmed Hamdi Tunnel

    By A. C. Lyons

    Foreword Sir William Halcrow and Partners are responsible for the design of the Ahmed Hamdi Tunnel as Sub-contractor to the Contractor, Osmac, a joint venture formed by the Arab Contractors, Osman

    Jan 1, 1979

  • AUSIMM
    Tunnelling for Bogong Hydropower Development

    By A Kindred

    The Bogong Hydropower Development is a 140 MW high head power project currently under construction in Northern Victoria. The project is the final link in the Kiewa hydroelectricity scheme, which was o

    Jan 1, 2008