Search Documents

Search Again

Search Again

  • SME
    Extended Application Ranges for EPB-Shields in Coarse-Grained Soils, the Lower Olentangy Tunnel Project Case History - NAT2024

    By Elisa Comis, David Chastka, Miriam Piemontese, Maria Chastka

    The Lower Olentangy Tunnel (LOT) Project involves the construction of a 17,000 ft (5,200 m) long, 12 ft (3.65 m) internal diameter Combined Sewer Overflow (CSO) tunnel. The tunnel is excavated by usin

    Jun 23, 2024

  • SME
    Microtunnel Shaft Construction in Louisiana - NAT2024

    By James Carroll, Lance Heyer

    This paper describes the shaft design and construction for a 72-inch microtunnel under 14 active railroad tracks in Avondale, Louisiana. Initial shaft design for a deeper tunnel alignment considered s

    Jun 23, 2024

  • SME
    Unique Umbilical Launch of a Slurry TBM in LA - RETC2023

    By Nick Karlin

    Dragados USA is constructing the LA Effluent Outfall Tunnel, a 7-mile, 18 ft internal diameter effluent discharge tunnel, utilizing a 21.6 ft (6.585 m) Herrenknecht Mixshield TBM. This paper highlight

    Jun 13, 2023

  • SME
    Big Data in Design-Build: Hampton Roads Bridge-Tunnel Expansion Supplemental Site Investigation - NAT2024

    By Martha Gross, Amanda Wachenfeld, Brian Keaney, Jean-Michel Charpentier, Frank Perrone

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing four-lane bridgetunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge expans

    Jun 23, 2024

  • SME
    The Upper Hidden Basin Diversion Project Design and Construction at Terror Lake—Kodiak, Alaska - NAT2024

    By Jennifer King, Julius Strid, Steve Brandon

    The Upper Hidden Basin Diversion (UHBD) tunnel was driven approximately 1.2 miles by the drill-and-blast method primarily through massive granite bedrock geology for the Kodiak Electric Association, I

    Jun 23, 2024

  • SME
    Horizon Lateral: Reliability to Meet Community Needs Today and Tomorrow - NAT2022

    By Ray Brainard, Adriana Ventimiglia, Amanda Kerr

    Preliminary design is underway for a new Southern Nevada Water Authority (SNWA) project that will ensure one of America’s most reliable water systems by providing continued, reliable water service to

    Dec 1, 2022

  • SME
    Shaft Design and Construction at the Hampton Roads Bridge-Tunnel - NAT2024

    By Richard Giffen, Martha Gross, Luca Pellegrini, Pa Ousman Njie

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in Virginia includes parallel 1.5- mile (2.4 km) tunnels constructed using a tunnel boring machine (TBM). The TBM launching and receiving shaft

    Jun 23, 2024

  • SME
    Practical Tunnel Lining Design Methodology and Guidelines—A Series of Tunnel Design Papers

    By Bradford F. Townsend, Colin R. Speers

    INTRODUCTION This is the first in a series of papers addressing practical tunnel lining design. The format for this and future papers is to present a particular topic and support the presentation o

    Jan 1, 2005

  • SME
    Tunnel Construction in Difficult Site Condition for the Longest Highway Tunnel in Himalayan Ranges—India

    By Alok Garg, Rajeev Kumar Dayal

    The Himalayan ranges have complex geological formation induced with locked up tectonic stresses and squeezing ground conditions. High overburden, steep slopes, perennial snow, and forest cover restric

    Jan 1, 2001

  • SME
    Specific Problems of Very Large Tunnelling Shields

    By Lothar Anheuser

    The appearance of very large shielded softground TBM's, of 14 m (46 ft) O.D. and more, as needed for two-lane highway tunnels, calls for a thorough search of overall stability and new solutions f

    Jan 1, 1995

  • SME
    Geotechnical Investigation For Tunnels In Glacial Soils

    By Jerome C. Neyer

    Within most of Canada and the northern third of the United States, the soils overlying bedrock are of glacial origin. Tunnelling in glacial soils presents numerous challenges to the contractor, includ

    Jan 1, 1985

  • SME
    Modern Tunnel Technology Does Not Always Win the Job

    By Leo G. Martin, Richard G. Sherman

    Recent sewer construction in downtown New Haven, CT required avoiding open trench methods because of near surface utilities and traffic congestion. The .73 km long alignment is in sands with the water

    Jan 1, 1993

  • SME
    The Geotechnical Aspects Of The Shaft And Outfall Tunnel - Boston Harbor Project

    By Sarah Vest, Richard Sherman, Leo Martin

    In 1988 a major exploration program was undertaken to determine the characteristics of the rock and soil for a 7.6 m diameter sea outfall tunnel beneath Boston Harbor out into Massachusetts Bay. The d

    Jan 1, 1991

  • SME
    Hazardous Water Inflows In Some Tunnels In Sedimentary Rocks

    By Tor L. Brekke, Alberto Marulanda P.

    The paper describes hazardous water inflows during construction that have taken place over the last three years in tunnels in Colombia. The projects involved are the Chivor II Hydroelectric Power Proj

    Jan 1, 1981

  • SME
    Design And Construction of Emergency Pedestrian Egress Tunnels, Essex Junction, Vermont

    By Bradford F. Townsend, Robin B. Dill, Richard M. Croswell

    Innovative geotechnical construction techniques were used to construct three pedestrian tunnels under a building slab-on-grade to allow utilization of basement space for manufacturing. Tunnels were co

    Jan 1, 1993

  • SME
    Mount Macdonald Tunnel

    By Allyn J. Steward

    The 14,350 m (47,000 ft) Mount MacDonald Tunnel is nearing completion. North America's longest railroad tunnel is being advanced from each end by two contractors. This presentation outlines te

    Jan 1, 1987

  • SME
    Ground And Liner Behavior During Construction Of The Mt. Baker Ridge Tunnel

    By Alexander I. Feldman, Michael S. Kucker, Robert A. Robinson, Harvey W. Parker

    An extensive geotechnical monitoring program was used to assess ground and liner behavior, provide input to a Disputes Review Board, and verify design assumptions during construction of the Mt. Baker

    Jan 1, 1987

  • SME
    Predicting Ground Conditions and Support Requirements for Atlanta-Area Tunnels Using the RMR System

    By Wojciech Klecan, John H. Raymer

    Baseline quantities of difficult ground and support types were estimated for the Chattahoochee Tunnel using the Rock Mass Rating system. RMR classifies the ground into five categories, ranging from “v

    Jan 1, 2003

  • SME
    The Design and Manufacture of the Arrowhead Tunnels Project Precast Segmental Lining

    By Christopher Hebert, Michael R. King, Mehdi Ghazi

    The Inland Feeder project is a critical component of Southern California’s water delivery system, relying on a strategic plan of water transfer and storage to enable the delivery of an additional 650

    Jan 1, 2003

  • SME
    Design of Lower Northwest Interceptor Tunnels Beneath the Sacramento River

    By Joel Nonnweiler, David Young, John Hawley

    The Sacramento Regional County Sanitation District has implemented a billion-dollar interceptor system master plan, including the 31 km (19 mile) long Lower Northwest Interceptor (LNWI). For the two L

    Jan 1, 2003