Search Documents

Search Again

Search Again

  • SME
    Predicting Utilization Rate of Hard Rock Slurry TBMs by Discrete Event Simulation Model - NAT2022

    By Anuradha Khetwal, Tala Tahernia

    The estimation of TBM utilization rate can be problematic due to the uncertainty involved in the tunneling system reaction to various geology along the tunnel. Moreover, the impact of operational and

    Dec 1, 2022

  • SME
    Planning for Sound Transit’s Proposed LINK Light Rail Expansion in Seattle Washington - RETC2023

    By Matthew Preedy, Anthony Pooley, Mike Wongkaew, Dirk Bakker, Raghu Bhargava

    Sound Transit’s ST3 program will add 62 miles of light rail to the Puget Sound area, including connections to the neighborhoods of West Seattle and Ballard. These connections include considerations fo

    Jun 13, 2023

  • SME
    A 4.75m Contractor Manufactured EPB Machine

    By Bruce Richardson

    A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec

    Jan 1, 2008

  • SME
    Crossing Fault Zones - Detailed Analysis for Radioactive Waste Repository Design

    By Tamás Megyeri, Dániel Borbély, Vera Szánto, László Kovács

    "Upon completion, the Bátaapáti deep underground radioactive waste repository complex (National Radioactive Waste Repository - NRWR) will provide safe final disposal for low and medium-level radioacti

    Jan 1, 2016

  • SME
    Construction of Expressway Branch Junction Structure Using Non-Cut-and-Cover Enlargement Method to Combine Two Shield Tunnels in Sedimentary Soft Rock

    By Yukika Miyashita, Takahiro Inoue, Kenji Namikawa, Masashi Matsumoto, Junichi Koseki, Yoshihiro Terashima

    "In order to construct an underground two-layer expressway branch junction structure with a height of 14.7 m and a width of 22.3 m, two shield tunnels in each layer were combined by using a non-cut-an

    Jan 1, 2016

  • SME
    Extensible Conveyor Systems For Long Tunnels Without Intermediate Access

    By Dean Workman

    Long extensible conveyor systems are an important option for efficient tunnel excavation where intermediate access is impractical. The conveyor system designed for the Pula Subbaiah Veligonda Tunnel

  • SME
    Utilizing Composite Action to Achieve Lining Thickness Efficiency for Sprayed Concrete Lined (SCL) Tunnels

    By Jiang Su, Alan Bloodworth

    "Composite sprayed concrete lining (SCL), consisting of two layers of permanent sprayed concrete separated by a layer of spray-applied waterproofing membrane, represents the latest development in SCL

    Jan 1, 2016

  • SAIMM
    Fracturing of rock ahead of the face of an excavation and its relevance to mechanized excavation

    By M. Mokgohloa, T. R. Stacey

    Boring of tunnels and shafts in hard rock under high stress conditions is becoming more common as mines and tunnels are developed at greater depths. Under the high stress conditions, fracturing of the

    Nov 27, 2024

  • CIM
    Improved Input Parameters and Numerical Analysis Techniques for Temporary Support of Underground Excavations in Weak Rock

    By Jeffrey D. Oke

    While significant progress in underground construction engineering has occurred in the past few decades, a number of fundamental deficiencies persist regarding the recognition, prediction, and mitigat

    Jun 1, 2012

  • SME
    Implementing BIM Underground on Progressive Design-Build Atlanta Plane Train West Extension Project - NAT2022

    By Jeff Fontana, Daniel Ebin, Eric Westergren, William Currier

    The PMott MacDonaldlane Train Tunnel West Extension (PTTWE) Project at HartsfieldJackson Atlanta International Airport includes the extension of the existing automated people mover system and terminal

    Dec 1, 2022

  • SME
    Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021

    By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz

    Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met

    Jun 13, 2021

  • SME
    Launch of an Earth Pressure Balance Tunnel Boring Machine in Short-Mode on a Congested Site from Narrow Deep Shafts for The Alexrenew Project in Alexandria, Virginia: A Case Study - RETC2023

    By Luis Fernandez-Deza, James Hawn, Dustin Mount, Jean-Marc Wehrli

    The RiverRenew Tunnel System project in Alexandria, VA forms part of a CSO scheme aimed at reducing overflows of combined stormwater and sewage into the Potomac River during storm events. A major piec

    Jun 13, 2023

  • SME
    Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021

    By J. Rostami, P. P. Nelson, A. Khetwaln

    Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in

    Jun 13, 2021

  • SME
    Wireless Optical Displacement Sensor for Convergence and Divergence Monitoring - RETC2023

    By Raphael Victor

    The construction and modification of tunnels brings a requirement for precise measurement of convergence and divergence to safeguard the structure, maintain safety and provide the assurance needed to

    Jun 13, 2023

  • SME
    Using Steel Fibers to Reinforce Final Shotcrete Linings

    By Thomas Schwind, Pamela S. Moran

    For short tunnels, a reinforced cast-in-place lining is not economical and shotcreteis a logical substitution. In the past, reinforced shotcrete linings have been constructed with lattice girders and

    Jan 1, 2005

  • SME
    TBM Data Management And Quality Assurance For The Brightwater Conveyance Project

    By Jeffrey Mitsopoulos

    King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which

  • SME
    Chimney Hollow Reservoir Project Inlet/Outlet Tunnel Excavation and Valve Chamber Construction - NAT2024

    By Kyle Kittle, Kyle Knaeble, Albert Ruiz, Gregory Raines, Ryan Gewargis

    The Chimney Hollow Reservoir Project (CHRP) is located southwest of Loveland, Colorado. CHRP is a component of the Windy Gap Firming Project, operated by the Municipal Subdistrict of the Northern Colo

    Jun 23, 2024

  • SAIMM
    Evaluation of rockburst energy capacity for the design of rock support systems for different tunnel geometries at El Teniente copper mine

    By S. A. Villalobos, F. A. Villalobos, and L. E. Aguilera

    Rockburst events have been a serious problem for many years in many mines worldwide, and in particular at El Teniente mine in Chile. El Teniente is the largest copper mine in the world, located in the

    Sep 1, 2022

  • SME
    Tunnel Induced Settlement and Impact Analysis Automation and 3D Visualization - RETC2021

    By Camilo Quintero, Frank Cesario, John Kinnear, Brian Boye

    In this paper, an innovative approach was adopted to automatically calculate the effects of tunnel induced settlement on buildings and utilities. The approach resulted in increased output quality, con

    Jun 13, 2021

  • SME
    Construction Progress of the Ottawa LRT Line - From Early Design Stages to Current Construction Milestones

    By Franz Wilhelmstoetter, Christian Karner

    "The Confederation Line is phase one of Ottawa’s light rail transit, which consists of 13 stops and stations. The project’s center piece is a 2.5 kilometer (1.6 miles) long tunnel with three undergrou

    Jan 1, 2016