Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Automated discontinuity extraction software versus manual virtual discontinuity mapping: Performance evaluation in rock mass characterization and rock
By Juan J. Monsalve, AMAN SONI, ALEX PFREUNDSCHUH, Nino Ripepi
Ground control failures are one of the main causes of accidents in the underground stone mining industry. Some of the fundamental tools for rockfall hazard identification are related to rock mass char
-
RI 4039 Bear Trap Corundum Deposit, Madison County, Mont
By John Taber, JOHN B. HOPKINS
During World War II , a critical shortage of domestic abrasive corundum developed . Late in 1944 , the shortage became so acute that it was deemed advisable to investigate certain low-grade corundum p
Mar 1, 1947
-
Low-profile capacitive load cells for underground mining material and wear classification to promote worker safety
By Andrew J. Petruska, Austin F. Oltmanns
The paper proposes a capacitive load cell for detecting changes in material and tool wear conditions for conical picks used in underground mining. The current process is dangerous and subjective, rely
Aug 1, 2023
-
IC 6295 Mining Laws of Costa Rica
By A. D. Garman
The mining ordinance of Costa Rica dates from 1830. In spite of the numerous attempts to enact a new ordinance , it has been so much amended and reamended during the hundred years of its existence eit
Jul 1, 1930
-
The influence of stirred mill orientation on calcite grinding
By HASAN SERKAN GOKCEN, SERKAN CAYIRLI
Manufacturers have improved various stirred mill types to be well adapted to fine and ultrafine grinding applications. These stirred mills, which are operated in wet or dry conditions, may be classifi
-
Gold Recovery From Arsenical Ores And Wastes
By W. F. Drinkard
Many in the environmental movement have focused on this element. But, nothing they or anyone does will change the amount of arsenic in the world. This report is on actual commercial plants that w
Jan 1, 2005
-
Dcp Investigation Of Strength Increases In Polyurethane And Acrylate Treated Soils
By Andreu J. Ferrero
Polyurethane and acrylate resins are routinely injected into soils to gain strength and control water flow. However, most published data regarding strength gain is derived from laboratory samples crea
-
"World Mining and Metals Technology" Theme of '76 SME-AIME Fall Meeting
"World Mining and Metals Technology" is the title of this year's SME-AIME Fall Meeting and Exhibit in Denver, Sept. 1-3, where a record number of exhibits are scheduled for display. The internati
Jan 8, 1976
-
Of Mr. Catlett's paper on Coal-Outcrops,
Beverley S. Randolph, Frostburg, Md. (communication to the Secretary): It has always appeared to me that each coalseam has its peculiar character or habit, due to the conditions of its formation, by v
Jan 1, 1901
-
The Operation of the LAROX PF-50 Pressure Filter at 'Ellatzite-Med' Flotation Plant, Bulgaria
The Operation of the LAROX PF-50 Pressure Filter at 'Ellatzite-Med' Flotation Plant, Bulgaria The implementation of Larox pressure belt filter, type Larox PF-50 provided within 6˜8% moistur
Sep 13, 2010
-
Spitzbergen-Nomay's Arctic Coal Treasure
By Odmund Ljone
FAR north of the Arctic Circle is a totally industrial community which until 1945 could not boast a single specimen of the rat family, and where today you will be awarded a bottle of fine cognac for e
Jan 1, 1948
-
The Black Angel Mine - A Film Presented By - Greenex A/S, Danish Arctic Contractors, Karl Garaventa's Sohne AG, J. S. Redpath Ltd., Cominco Ltd., Bechtel Corp.
The following description is based on the film's narrative script: The film opens with a description of the terrain--tens of thousands of yearly snows compressed into glacial ice, stretching f
Jan 1, 1977
-
FMC's New Soda Ash Technology Is A Success
By Tony Dunn
FMC Corp. achieved a significant cost reduction at its Green River, WY soda ash operations using a new proprietary solution-mining and processing technology. In phase one of the program, trona ore is
Jan 1, 1999
-
Ventilation monitoring using fibre optics
By G B. French
Post a serious heating event underground, and at the direction of the State Mining Safety Authority, a mining company needed to demonstrate the use of cutting-edge technology to mitigate future events
Oct 12, 2022
-
Dynamic fracture mechanism of thermally degraded brittle rock under impact load
By A Taheri, G D. Nguyen, M Karakus, S Akdag
During underground mining operations, rock masses are highly subjected to dynamic disturbance caused by blasting, mechanical drilling and earthquakes resulting in strain burst, slabbing and spalling.
Nov 29, 2022
-
3D Analysis Of The Seismic Behavior Of Inclined Micropiles
By Seyyed Mehdi Radeghi Mehrjou
It is important to study structures and their retrofitting techniques in order to avoid earthquake-induced seismic damage within countries that are prone to earthquakes. Todays, micro piles are employ
Sep 1, 2022
-
Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of Antwerp
By Stefan Mewes
Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa
Sep 1, 2022
-
Vertical Drop – the Challenge of Transporting Explosives Underground
By Ayman Tawadrous, Hendrik Botha, Simon St J Tose
The early miners and their mules always had the challenge of transporting unstable dynamite underground. The modern pumpable explosives, whilst far safer, still present a major logistics challenge for
Jan 21, 2025
-
Confined Space And Inner-City Projects – Future Challenge And Opportunity For Diaphragm Walling
By Alexander Blatt, Franz-Werner Gerressen
Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. One can anticipate that globa
Nov 1, 2022
-
The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 Months
By Refik Elibay, Lawrence A. Williamson, George D. Barnes
Under an extremely aggressive schedule, final design of 13.5 km (8.4 miles) miles of 8.2 m (27 ft) diameter deep rock tunnel, 322 ML/day (85 million gallons / day)submersible pumping station and assoc
Jan 1, 2005