Analytical Solution for a Deep Tunnel Excavated in a Porous Elasto-Plastic Material Considering the Effects of Seepage Forces
By R. E. Barbosa
Seepage forces generated during tunnel excavation affect the ground response and may cause severe instability problems, including total ground collapse and flooding into the tunnel. This paper present
May 1, 2009
-
Kárahnjúkar Hydroelectric Project, Iceland Extreme Underground Construction
By Bernhard Leist, William D. Leech, Johann Kröyer, Holger Evers
Landsvirkjun—the national electric power company of Iceland—is building the Kárahnjúkar Hydroelectric Project in eastern Iceland. Two glacial river systems will be dammed and channeled through a serie
Jan 1, 2007
-
Hydraulic Assessment and Rehabilitation of a Deep Stormwater Tunnel
By Brandon Barnes, Michael Haggerty
"Around Minneapolis and Saint Paul, Minnesota, the local geology includes the St. Peter Sandstone, which is easily minable and has facilitated construction of interceptor tunnels for storm water and s
Jan 1, 2016
-
Design Diagrams for Estimating Tunnel Face Stand-Up Time in Water-Bearing Ground
By R. Schuerch, G. Anagnostou, R. Poggiati
"The paper presents dimensionless design diagrams for estimating the stand-up time of a tunnel face in saturated ground of medium-low permeability. The diagrams cover a wide range of ground parameters
Jan 1, 2016
-
George A. Fox Conference focuses on the future of the industry
"During his presentation at the 2016 George A. Fox Conference about the history of public-private-partnerships (PPP) in the tunneling and underground construction industries in New York, Vincent Tirol
Apr 1, 2016
-
The Päijänne Tunnel
By Eero Pokki
The Päijänne Tunnel is being constructed to conduct raw water from Lake Päijänne to the Helsinki Metropolitan Area. The length of the tunnel will be 120 km and the cross-sectional area is 15.5 sq m. E
Jan 1, 1979
-
Power Loading on the Colorado River Aqueduct
By Arthur Green
A GROUP of 13 cities situated in Los Angeles and Orange counties in Southern California is engaged in constructing an aqueduct to carry water from the Colorado River at a point near Parker, Arizona, t
Jan 1, 1936
-
Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel
By Ebrahim Farrokh
Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided
-
The Relationship Between Tunnel Convergence and Machine Operational Parameters and Chip Size for Double Shield TBMs— A Case History of Ghomroud Water Conveyance Tunnel
By Jamal Rostami, Ebrahim Farrokh
Selection of tunneling method, specially the use of shielded machines for application in deep rock tunnels can be heavily impacted by presence of ground convergence and squeezing conditions. Tunnel co
Jan 1, 2007
-
The Technology of Automated Guidance for TBM’s and Road Headers
By W. L. Hollinshead, Alwin Poltinger
GENERAL Tunneling by hand digging is as old as the history of humans. Mechanized tunneling did not begin to replace manual methods until around the beginning of the 19th century(Brunel patent, 1818
Jan 1, 1997
-
Niagara Tunnel Project
By Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.
Jan 1, 2007
-
Rock Tunnels at High Water Pressure: Non-Continuous Pressurized TBMs Versus Slurry - RETC2021
By Brad Grothen, Lok Home
The choice of TBM type is never easy, but it becomes especially challenging when faced with a hard rock tunnel with expected high water flows and pressure. Slurry Shield tunneling has a long history o
Jun 13, 2021
-
Suggested Support System for a Mining Tunnel in the E1 Longwall Panel of the Parvade1 Underground Coal Mine: The Finite Element Method
By B. Oraee-Mirzamani
One the most important tasks after excavation of tunnels is the implementation and installation of a support system. Tunnel collapse poses a safety hazard and can cause worker injuries. In addition, i
Aug 1, 2013
-
Live Track Railroad Tunnel Repair and Clearance Improvement in the United States
By J Schrank
Double-stack trains in the United States date back to the early 1980s, starting about the time deregulation of the rail industry occurred. Freight rail became increasingly more competitive to trucking
Sep 17, 2014
-
The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, Australia
By P K. Wong, D A. F Oliveira, F M. Azad
In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv
Sep 17, 2014
-
Innovative Rehabilitation Approach for Overstressed Existing Linings Using an Adaptable Yielding Support System
By Ingo Ossenbühl, Wolfgang Dolsak, Vojtech Gall, Axel G. Nitschke
"Yielding support systems for application in underground construction have a long history, primarily in mining. Typical examples are tunnels subject to loading conditions that lead to overstressing of
Jan 1, 2016
-
Forensics Of Difficult Ground Conditions Leading To Advanced Solutions For Recovery Of An Abandoned Tunnel Project
By Faruk Oksuz, Phillip L. Covell, Martin Doll
A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200
Jan 1, 2007
-
Construction of the South Bay Ocean Outfall
By Michael Jatczak, Brett Robinson
The South Bay Ocean Outfall tunnel is located at the U.S./Mexico Border and is one link in a system designed to treat and dispose of raw sewage entering the Tijuana River Valley from Mexico. The 11 fi
Jan 1, 1999
-
Case History of the New St. Clair River Tunnel
By J. F. McDonald
On December 8th of last year, the new St. Clair River tunnel was holed-through to Port Huron, Michigan. The tunnel, commissioned by the Canadian National Railway, was needed to replace an existing tun
Jan 1, 1995
-
Temporary Tunnel Support By Precast Segments
By Werner A. Ruemmele, Steven R. Wardwell
INTRODUCTION The first phase of the Los Angeles Metro Rail Project consists of 7.1 km (4.4 miles) of subway and stations running through downtown Los Angeles from Union Station to MacArthur Park. S
Jan 1, 1989