Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Anticipated Ground Conditions for the Riverside Badlands Tunnel
By D. B. Desai, J. T. Waggoner, J. S. Hill, R. R. Redd, S. J. Klein
The 13 km (8 mile) long Riverside Badlands Tunnel is planned for construction starting in 1998. Extensive geotechnical investigations indicate that the 3.7 m (12 ft) finished diameter tunnel will be
Jan 1, 1997
-
Construction of the Inter-Island Tunnel Boston Harbor Project
By A. J. Stewart, R. L. Shufflebotham, D. W. Ferguson, T. L. Page
The Inter-Island Tunnel is a 7.7 kilometer (25,160 foot) long by 3.5 meter (11.5 feet) diameter concrete lined tunnel through the Cambridge formation below Boston Harbor. Constructed as part of the Bo
Jan 1, 1997
-
Riverside Badlands Tunnel, Inland Feeder Project: The Challenges Between Concept and Completion
By John Waggoner, Steve Klein, John Townsend, Jay Arabshahi
The Riverside Badlands Tunnel is a 13 km (8 mile) long segment of the Inland Feeder Project. This 3.65 m (12 ft) finished diameter water tunnel presented many challenges that had to be overcome to tak
Jan 1, 2003
-
Hard Rock Tunnel Driving ... On the Moon?
By T. N. Williamson
The art of drilling tunnels is still in its infancy, although it is 70 years since the first tunnel driver was put into operation. (It was used to drive 6000 ft of tunnel under the English Channel.) B
Jan 7, 1965
-
Extensions to MelbourneÆs Telecom Cable Tunnel Network
By Gunn S. G, Wilson E. G
Studies by Telecom showed that the existing cable tunnel system in the Melbourne C.B.D. required expansion in order to meet the future telecommunications needs of the City. Due to physical locations
Jan 1, 1981
-
Wolf Creek Upper Narrows Project–South Fork, Colorado, Construction of a Large Cross-Section Drill and Blast Highway Tunnel in Alpine Conditions with Multiple Staggered Headings
By Lyman File
This paper discusses the overall challenges to construct a two-lane highway tunnel located in southwestern Colorado on U.S. Highway 160 for the Colorado Department of Transportation by the Kiewit West
Jan 1, 2003
-
Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction
By Daniel L. Hanson
This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently
Jan 1, 1994
-
Upper Rouge Tunnel CSO Control
By Wern-ping Chen, Jean Habimana, Jinyuan Liu, Mirza M. Rabbaig, Robert Barbour
To mitigate and control the combined sewer overflows from 17 outfalls in the City of Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township, the Detroit Water and Sewerage
Jan 1, 2007
-
Tunnel Interaction: Hydraulic, Mechanical, And Hydromechanical Approach
By John Kinneen, Sunghoon Choi, Arne Fareth, Edward S. Barboe, Kyle R. Ott
A new water treatment plant is to be constructed for a portion of the water supply system of New York City. The project includes construction of new water conveyance tunnels crossing perpendicular and
Jan 1, 2007
-
NO2:NOx Ratios in Australian Road Tunnels
By P Gehrke, S O’Gorman
The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire
Sep 17, 2014
-
Modelling Complex Shock Tunnel for Shock Interaction and Transfer Testing
By Catherine Johnson, Barbara Rutter
The shock tunnel located at the Missouri University of Science and Technology Experimental Mine is 65 feet 9 inches (20.0406 m) in length. The tests performed inside of this tunnel are either arena te
Jan 1, 2018
-
Assessment of Progressive Failure of an Expanded Concrete Segmentally Lined Tube Tunnel
By Andrew Thomson, Peter Wright
"A section of a London Underground expanded segmental lined tunnel constructed in the 1970’s progressively deteriorated after 2001, with extensive radial joint spalling and mid-segment cracking. As pa
Jan 1, 2016
-
Revising Terzaghi's Tunnel Rock Load Coefficients
By Don Rose
In the USA the cost of steel ribs for tunnels approximates $100 million each year. European practice has long since abandoned heavy steel ribs for tunnel support, and tunnel coats in Europe (normalize
Jan 1, 1982
-
A Lining Design Method Consistent With NATM for Deep Shafts
By Xiao min Zhou, Yan Xu, Hongzhen Liang, Xiaonan He
"With the increase of shaft excavation depth, the thickness of the shaft lining increases sharply. It is difficult to reduce thickness of lining effectively by improving high-strength concrete perform
Jan 1, 2019
-
The Selection Of Excavation Methods For The Detroit Upper Rouge Tunnel Cso Control Project
By Jean Habimana
Complex and distinct geological units spread along the 7-mile long 30-ft inside diameter Upper Rouge Tunnel CSO Control Project in Detroit, Michigan. Its construction is divided in two tunnel construc
-
Collapse and Remining of Tunnel TO8 at THSRC Contract C230
By William Stewart, John Tinkler, Gary B. Hemphill
Of the 345 km long Taiwan High Speed Rail Project, connecting the cities of Taipeiand Kaohsiung, the 23 km alignment on Contract C230 required the construction of5755 m of shallow mined tunnels rangin
Jan 1, 2005
-
IC 7128 Construction Of The Bingham-Copperfield Vehicular Tunnel ? Introduction
By L. S. Breckon
This paper describes the methods and equipment used by the Utah Copper Co. in constructing a vehicular tunnel at Bingham Canyon, Utah, Completion and use of this tunnel for vehicular and pedestrian tr
Jan 1, 1940
-
A geostatistical solution to estimating ground-water inflows in deep rock tunnels with validation through case studies
By MARK J. VANARELLI
Estimating ground-water inflows in rock deep tunnels is critical to the safety of personnel constructing the tunnel and the cost of construction. This paper presents two case studies, including the Ch
-
Planning and Construction of the Metro Gold Line Eastside Extension Tunnels, Los Angeles, California
By Jim Richards, Eli Choueiry, Brett Robinson, Amanda Elioff
The Los Angeles Metro Gold Line Eastside Extension (MGLEE) extends Metro’s light rail system to the densely populated and growing East Los Angeles communities. Much of the 6 mile alignment consists of
Jan 1, 2007
-
Starter Tunnel and TBM Mining on Construction Package No. 3A MetroWest Water Supply Tunnel Project (MWWST)
By Jeff Salai
The CP-3A contract is the final segment of the MWWST’s 28.3 km (17.6 mile)pressurized water supply tunnel for the metropolitan Boston area. The 1,288 m (4,226 feet) of U-shaped tunnel alignment pa
Jan 1, 2001